Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
European Developments: Capacity Transmission Workgroup 6th October 2011.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
23 September 2004GTE Annual Conference1 Review of the Madrid Forum VIII July 2004 Geert E.H. Joosten GTE President GTE Annual Conference September.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
The 3rd package for the internal energy market
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Transparency Project GRI NW Region
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
20th April 2016 Teleconference
26th IG meeting 23th January 2014
Gas Transmission Europe
GSE worked with ERGEG on CAM/CMP since
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
GRI NW TRANSPARENCY PROJECT
20th April 2016 Teleconference
Transparency Platform
Update on European Network Codes
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
EWRC-RAE MUTUAL PROJECTS
20th April 2016 Teleconference
European Transparency Requirements
37th IG Meeting South Gas Regional Initiative
EUROPEAN TRANSPARENCY UPDATE
DRAFT DG TREN Staff Working Paper on LNG
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
EWRC-RAE MUTUAL PROJECTS
EURELECTRIC transparency requirements
EWRC-RAE MUTUAL PROJECTS
LNG Workshop Bilbao, March 13th 2009 GLE.
Presentation transcript:

New transparency guidelines Proposal to amend Annex chapter 3 of the Gas Regulation Mark van Stiphout C2 – Electricity and Gas 29/05/2018 EUROPEAN COMMISSION

 The need for more transparency: Starring at the Madrid Forum agenda since 20 & 21 February 2007; 15th Madrid Forum: Proposal for Minimum Transparency Requirements Eurogas, Eurelectric, OGP, EFET, IFIEC, Geode, CEDEC ERGEG and Associations ask that it is made binding TSOs commit to publishing already available information Cost allocation Address content of the presentation 12th Madrid Forum 13. The Forum invited GIE to include work on availability on the web of real-time flow data in the platform mentioned in paragraph 8. MF 15: The Commission thanks EFET, OGP, Eurogas, Eurelectric, CEDEC and GEODE for their list of minimum transparency requirements which shows the need to enforce existing transparency requirements, on one side, and the need to further develop the Regulation in this respect, on the other side. IFIEC stated it also agrees with the list of minimum transparency requirements. These Associations, together with ERGEG, ask that these minimum requirements are made binding.The Commission will analyse the list and the need to make it binding. Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 2

Madrid Forum XV

 Security of Supply & Transparency Russia – Ukraine dispute in January 2009 Data availability More flexibility in the internal gas market is needed Allow all market participants to respond to solve a gas supply disruption “the Commission proposes to strengthen gas network transparency through detailed rules through comitology” From the impact assessment for the SoS regulation: However, the data available to governments and market participants on gas flows, stocks and available capacities was inadequate, making market decisions and decisions on emergencies more difficult. Other factors influencing flexibility in the internal gas market to mitigate most gas supply disruptions should also improve somewhat in the next years. On the functioning of the market, after the 3rd internal energy market package, the Commission proposes to strengthen gas network transparency through detailed rules through comitology by a proposal to amend the Annex of the current Gas Regulation 1775/2005.( p22) Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 4

 A European wide discussion on the need for more transparency Stakeholder consultation in April Discussion on draft proposal in the 16th Madrid Forum of 28 & 29 May 2009 The Forum welcomed the proposal as an important step forward Stakeholders were asked to comment by the end of June Gas Regional Initiative work on transparency GTE+ workshops in March and September Stakeholders that commented: Eurelectric, Eurogas, GTE+, ERGEG, companies Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 5

 Discussion and consultation after MF16 Stakeholders: detailed comments but general agreement – make it binding! ERGEG provided extensive comments GTE gave high quality feedback Most associations responded Some individual companies responded Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 6

 What needs to improve? Access to and format of data Real-time updates Granularity of capacity availability and historic data Relevant points All entry and exit points Connecting to hubs, storages, production facilities, balancing zones Protection of confidential information of end consumers interconnection point where the capacity is sold; type of capacity, i.e. entry, exit, firm, interruptible; quantity and duration of the capacity usage rights; type of sale, e.g. transfer or assignment the total number of trades/transfers; any other conditions known to the transmission system operator. Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 7

 What needs to improve? Information on liability and possibility of interruption Balancing input and output of individual shippers Linepack and flexibility possibilities of the system Information on the calculation of tariffs interconnection point where the capacity is sold; type of capacity, i.e. entry, exit, firm, interruptible; quantity and duration of the capacity usage rights; type of sale, e.g. transfer or assignment the total number of trades/transfers; any other conditions known to the transmission system operator. Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 8

 What needs to improve? Gas quality and pressure Secondary market Interruptions, conversion services Secondary market Conditions for trading Information on traded product interconnection point where the capacity is sold; type of capacity, i.e. entry, exit, firm, interruptible; quantity and duration of the capacity usage rights; type of sale, e.g. transfer or assignment the total number of trades/transfers; any other conditions known to the transmission system operator. Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 9

 Comments by stakeholders I Define units on EU level Gas Quality and Pressure requirements only when relevant for access conditions Wobbe index or calorific value measured at all relevant points Risks to be assessed by shippers Procedures instead of agreements at IP’s Method to calculate capacity kWh (with a combustion reference temperature of 298 K) shall be the unit for energy content and m3 (at 273 K and 1.01325 bar) shall be the unit for volume. In case gas flow or capacity is expressed in volume/time, then the conversion factor to energy content shall be provided Wobbe per day at D+3 Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 10

 Comments by stakeholders II Information on capacity requirements: more precise Secondary capacity obligations are not clear Linepack If offered by the TSO Possibility for NRA to exempt Other flexibility services System pressure or amount of gas Minimum and maximum limits Real-time Not ‘maximum’ for technical capacity No distinction between firm and interruptible for nominations  Day ahead and end of each gas day Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 11

 Way forward Proposal and invitation were sent to Permanent Representations on 18 November First Committee meeting on 18 December Member State designates representative NRA’s are invited Decision through Regulatory procedure Committee established under Art 14 of Gas regulation Council decision 1999/468/CE Gas Regional Initiative – Stakeholder Group Northwest region – 26 November 2009 | 12