Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
1 1. Some recent views ( ) 2 Linac tunnel
Luminosity expectations for the first years of CLIC operation CTC MJ.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi.
The Stripping Foil Test Stand in the Linac4 Transfer Line
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Linac4 Project Meeting 1/ /01/ st priority 2  First priority: from the Linac4 project, the best wishes to you and your families for a 2010.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Linac4 status and perspectives
Experience with beam instrumentation at Linac4
CLIC module working group
LHC schedule.
Complementary ISTC Projects #3888, 3889p
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
EC Activities Status for the LIU
TBL, Status, Plans, Experiments
Planning the Experiment
BE-BI Software for LINAC4
Update on HW commissioning
What Should We Do?.
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Tango status at Elettra
Linac4 RF System Operation for the Reliability Run in 2017
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Update on Linac4 Status, Reliability Run and Modelling
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Alexander Herlert, CERN (PH-SME-IS)
GIS Portal Racks Project
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Year 2 Autumn Term Week 12 Lesson 1
LINAC4 commissioning plans etc.
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
Advanced Research Electron Accelerator Laboratory
Year 2 Autumn Term Week 12 Lesson 1
commissioning and measurements
Electron Beam Systems ETC and Methodology
Testing Coordination at ESS
LCLS-II Cryoplant Controls Workshop.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
BSM S. Grishin (installation manager),
ThomX – Commissioning Meeting – 25/01/2018
LCLS Control System Personnel Linac & BC2 Controls progress
Update on Linac4 Status, Reliability Run and Modelling
Presentation transcript:

Updated with comments 22 may 2017 Updated again 29 June 2017 Linac4-status update Updated with comments 22 may 2017 Updated again 29 June 2017

Aim at tunnel closed 26 may To be discussed today – we have a small vacuum leak HST is already out, de-buncher to be installed soon Some BI equipment is late, not critical for the RR, will be installed at later stage (collect all the late-comers and grant 3 days of access mid-july). Alignment of the low energy end (LEBT to DTL) is important and strategy to be put in place. RF work to be done is planned and followed up (S. Ramberger presentation at IEFC 7th April ) Detailed plan with stops and milestones is being worked out by AL.

Rough planning JUNE : RF work, Bunch Shape Monitor tune-up, debuncher commissioning. JULY –SEPTEMBER : test-run, identify the weak points. Fault tracker in place. ABP running the linac. Involvement of OP to the extend of their availability. Stop of 3 days mid july OCTOBRE : RF work + addressing weak points identified in july-septembre+ possibly change of source. from end OCTOBRE: OP driving the daily operation and start the mock-up period. ABP as “linac supervisor”, RF and ABP piquet during working hours. Winter stop : 14 dec – tbd by Rende and OP IMPORTANT : OP involvement is one of the goals of the reliability run but it doesn’t drive the schedule.

Update 29 June 2017 JUNE : RF work, Bunch Shape Monitor tune-up, debuncher commissioning. 1 JULY –30 SEPTEMBER : test-run, identify the weak points. Fault tracker in place. ABP running the linac. Involvement of OP to the extend of their availability. Stop for completing debuncher installation/ BI installation / any other missing items : 24-28 July ADAM experiment either 20-21 July or 31july-1augst 1-30 OCTOBRE : RF work + addressing weak points identified in july-septembre+ possibly change of source. 31 OCTOBRE-18 decembre: OP driving the daily operation and start the mock-up period. ABP as “linac supervisor”, piquet service during working hours. Winter stop 18 decembre-26 February Linac closed 1 february 26 February – 30 April : : OP driving the daily operation and start the mock-up period. ABP as “linac supervisor”, piquet service during working hours. This schedule will be integrated in the injector schedule and presented at the IEFC

OP involvement Software development Autopilot for the source Daily running

Reliability Run -phases When 0-Finalisation By end June 17 Consolidation of LLRF and BI instrumentation. CRUCIAL to respect the schedule 1-make the linac4 reliable by addressing weak points July – end of septembre Short runs followed by repairs/optimisation Accelerator Fault Tracker in place; OP involved with Linac team still leading. 2-Mock-up of operation as after the connection End of octobre- april 18 Daily preparation of different beams, continuous operation for weeks, exploitation of the LINAC4 flexibility) OP leading the run with linac team as support. Call-out list during working hours. Linac4 status and perspectives Alessandra Lombardi

Responsibilities A. Lombardi (ABP) responsible for the reliability run , Bettina Mikulec is the OP representative

Reliability run – details Keep in place HST dump , to have the possibility to have multiple destinations/users and verify the energy. Beam-on time calculated from the logbook entries keeping into account that there is not a piquet service. Software to facilitate running from the CCC should be transferred to OP or written by OP. Needs have been identified. Main dump HST temporary dump