Overview of the CoJ Water & Sanitation Master Plan

Slides:



Advertisements
Similar presentations
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
Advertisements

REPUBLIC OF NAMIBIA OFFICE OF THE PRESIDENT NATIONAL PLANNING COMMISSION Overview of Development/ Capital Budget 01 March 2012.
1 PIDA Domestic Resource Mobilization Strategy for NEPAD- IPPF Interconnecting, Integrating, and Transforming a Continent.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
Shaping the Future of Water Services
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
Financing Urban Public Infrastructure
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Municipal Infrastructure Grant Sport and Recreation 15 February 2005.
America’s Water Upmanu Lall water.columbia.edu.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
PRESENTATION TO THE ROAD PAVEMENT FORUM 09 November 2010 Progress & Update since the Road Construction & Maintenance Summit.
Municipal Water Infrastructure Grant Standing Committee on Appropriations Presenters: Marissa Moore and Steven Kenyon | National Treasury | 5 March 2013.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Western Cape Water Sector Plan Mr R Dyantyi MEC for Local Government & Housing (DLG&H) May 2007.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
P A L M E R D E V E L O P M E N T G R O U P P D GP D G City of Cape Town An Update of the Water Services Financial Model 26 October 2006.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
DBSA SUPPORT TO LOCAL GOVERMNENT Ben Mokheseng Manager: Infrastructure Finance Local Government SA Financing Division.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
By the Director-General of the Department of Provincial and Local Government (the dplg), Ms Lindiwe Msengana-Ndlela Monday, 7 May 2007 Presentation to.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
OVERVIEW OF PLANNING FRAMEWORK IN THE CONTEXT OF LOCAL GOVERNMENT IN SOUTH AFRICA Strategic Planning Learning Exchange ‘fostering learning of the global.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
Council Improvement Plan Council Meeting 1 June
Asset Degradation Modelling at Townsville Water
Lecture (11): Water Distribution Systems
Presentation to the Portfolio Committee on Energy
Municipal Water Infrastructure Grant (MWIG)
Long Range Financial Forecast Preview
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
HOW TO WRITE PROJECT PROPOSAL – FORM AND STYLE
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
PRESENTATION TO THE PORTFOLIO COMMITTEE
Capital Plan Update and Five-Year CIP
Infrastructure and Financial Strategies
Asset Management - From Theory to Implementation
DEPARTMENT OF WATER AFFAIRS & FORESTRY
Overview of the Tshwane Water & Sanitation Master Plan
City of Sisters, OR 2017 Water & Sewer Rate Study
Urban Settlements Development Grant 2nd and 3rd Quarter Exp of 2016
INAC Water and Wastewater: Discussion on Current Policies and Processes Presented at: Circuit Rider Trainer Professional Association’s Annual General Meeting.
Water and the medium term budget policy statement
DPLG MISSION AND MANDATE
Township of Horton Public Meeting – December 12, :30 p.m.
The United States Conference of Mayors - Mayors Water Council May 2018
Presentation at the CIGFARO Conference by: Mosimanegape Macomo
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
Recognising and managing the key challenges in water service delivery
Capital Improvements Planning
Role of Education Key for human development
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
BUDGET OVERVIEW: 2004/5 FINANCIAL YEAR By the Director-General
Washington State Infrastructure Financing
Operationalization of a Public Works AM Strategy
MASILONYANA LOCAL MUNICIPALITY
2005 MTBPS 25 October 2005 Introduction Macroeconomic overview
Water Services Targets
SALGA Comments on 2010 MTBPS
Director-General: Mr. E Africa
VOTE 31: HUMAN SETTLEMENTS BUDGET ANAYLYSIS 2014/15
Presentation transcript:

Overview of the CoJ Water & Sanitation Master Plan By: Johannesburg Water V Chewe

Presentation Outline National water value chain Background Planning Framework Master Planning Objectives Software system used Projects Conclusion

National Water Value Chain Water Resources Purification Bulk Distribution Role Players: DWA Water Boards Municipalities Service Providers Waste Water Treatment Bulk Storage Waste Water Collection Reticulation Household/User

Background JW is responsible mainly for the following functions: Plan and provide new infrastructure to cope with demand and growth of the city Facilitate system development for new township developments Project manage the implementation of new capital projects Manage water conservation and demand management within the City Long term planning is reflected in the Master Plan. Maintenance and operate existing infrastructure in providing water and sanitation services.

Planning Framework National Development Plan Provincial Growth & Development Strategy CoJ 2040 Growth & development Plan State of the City – spatial, demographics Strategic outcomes – CoJ 2040 Strategic projects – Inner City, Mining belt etc Institutional framework Participating planning Key deliverables

Master Planning Objectives The Master Plan reflects the continuous analysis of current usage of the water and sanitation infrastructure to identify shortcomings to be addressed The Master Plan is updated quarterly to reflect new influences from both the private and public sector as well as political decisions. It analyses future requirements from the Spatial Development Framework documents It extrapolates trends of growth to estimate future needs It examines the effect of proposed new developments to ensure sufficient capacity in the infrastructure The cost of proposed upgrades and extensions are calculated for budget purposes It schedules proposed upgrades and extensions to the infrastructure so that budget and planning can be addressed timeously. The 10 Year Scheduling reflects the near future Master Plan

Software systems used IMQS Modules (Infrastructure Management Query Station): Wadiso – Water Design Sewsan - Sewer Design Swift – Demand Projections (SAP billing information) and UAW Asset Register Pipe Replacement software Project Tracker– Capital projects (Link IDP Projects to physical location of Project & Linking to assets under construction and asset register) Township application tracking within Water and Sanitation PlantMan (Managing maintenance activities on Purification plants, pump-station etc.) Financial system – SAP Water and Sanitation Maintenance recording - SAP

Projects: Reservoir Storage JW required additional storage of 140 Ml @ cost of R 275 Million.

Projects: Bulk Pipelines Condition Investigation of 750 km @ cost of R 50 Million.

Projects: Bulk Pipelines Upgrades Upgrade Water 230 km Bulk pipelines @ cost of R 450 Million.

Projects: Water pipe replacement 770 km Water pipelines replacement @ cost of R 1,5 Billion.

Projects: Pressure Management Reduction of Static Pressure and MNF @ cost of R 130 Million.

Projects: Sewer Pipeline Replacement Replace 700 km of sewer pipelines @ cost of R 1,5 Billion.

Projects: Sewer Outfalls Upgrades Upgrade 26 km of Sewer Outfalls @ cost of R 360 Million.

Projects: WWTW Upgrades Upgrade 325 Ml of Sewer Outfalls @ cost of R 4.8 Billion.

COMPREHENSIVE INFRASTRUCTURE PLANS Capital Budget Forecast – Water (R 2009 values)

Condition Grading Attention paid to assets falling in the poor-very poor condition (these form condition backlog) - for inclusion in the short-medium term capital investment program.

RUL Grading Attention paid to assets falling in the 0-5 years RUL range for inclusion in the short-medium term capital investment program. 18

Risk Exposure– Condition   IMPACT Insignificant Minor Moderate Major Catastrophic Total LIKELIHOOD Almost certain Likely 1 954 618 1 356 1 160 2 692 7 780 1 283 470 1 483 1 064 1 076 5 377 Unlikely 1 615 974 1 296 952 1 208 6 045 Rare 9 946 1 942 2 988 4 477 2 780 22 132 14 799 4 052 7 123 7 653 7 757 41 384 Assets with a replacement value of some R 13 billion are considered likely to fail over the next 10 years, of which R 5 billion are critical (av R1.3 bn pa)

RUL Profile JW has Asset Management Plan – Driver of Infrastructure Capital requirements Total Assets Value – R 55 billion (CRC) Critical Assets that requires replacement/renewal – R 12.65 billion (Over next ten year period) This equate to requirement of R1.265 billion per year over the next 10 years for capital replacement/renewal Note: This requirement excludes JW Expansions and Upgrades of Infrastructure needs Asset Sub-Categories Remaining Useful Life (Years) (CRC Amount – R (Million) 0-5 6-10 11-15 16-20 More than 20 Water Supply Network 3 747 1 706 2 683 478 11 482 Wastewater Supply Network 2 770 1 625 2 601 3 191 13 664 Wastewater Treatment Works 1 161 1 641 183 1 417 1 334 Total 7 678 4 972 5 467 5 086 26 481 % Composition 15% 10% 11% 53%

Conclusion The Master Plan for future upgrade and extension of water and sanitation services is in place ensuring timely scheduling of projects within the constraints of the budget. The highest priority upgrade and extension projects for both water and sanitation are already underway/in construction. Limited funding is affecting the Projects Implementation and progress. Additional grant funding would enable acceleration.

Thank you for your attention 22