EuCARD2 WP10.2 main results and open issues

Slides:



Advertisements
Similar presentations
WP10.2 – status Reported by L. Bottura and C. Senatore Meeting at CERN, February 2 nd, 2014.
Advertisements

Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
Optimisation of Roebel cable for HTS accelerator magnets
Structural design of EuCARD2 magnets
Mechanical Properties of Roebel Coated Conductor Cable A.Kario 1, S. Otten 1,2, C. M. Bayer 1, M. Vojenciak 1,3, A. Kling 1, B. Ringsdorf 1, B. Runtsch.
Roebel cable industrial optimization - General Cable Superconductors Dr Nick Long, Robinson Research Institute, Victoria University of Wellington, New.
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
Future Magnets Report from WP10
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
EuCARD2 Magnet Status and action plan
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
Properties of HTS-Roebel cables and the approach for EuCARD-2
Plans for EuCARD-2 cable manufacturing A. Kario, A. Kling, J. Brand, W. Goldacker Institute for Technical Physics, Karlsruhe Institute of Technology.
Role of UT in WP10 & (*) State-of-the-art with CORC for HEP Marc Dhallé (*) contributed by D. van der Laan EUCARD II kick-off, June 2013, CERN.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
FCC kick-off meeting a summary for magnets L. Bottura
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
BRUKER HTS tape measurement John Himbele, Arnaud Badel, Pascal Tixador 1.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
In-Field Resistance of REBCO Electrical Joints at 4.2 K
Eucard2 – WP10 Future Magnets Philippe Fazilleau & Lucio Rossi WP10 kick off meeting CERN, 14 June 2013.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Meeting 04/09/2015.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
Prospects for the use of HTS in high field magnets for future accelerator facilities A. Ballarino CERN, Geneva, Switzerland.
Bi-2212 cable transverse pressure tests in Twente A. Godeke, J. Jiang, E.E. Hellstrom, D.C. Larbalestier – MS&T & ASC – NHMFL - FSU L.D. Cooley, T. Shen.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
HTS Roebel cables for the EuCARD2 “Future Magnets”
Strand striation for reducing AC losses in Roebel cables: is it a viable solution? A. Kario 1, A. Kling 1, R. Nast 1, M. Vojenciak 2, A. Godfrin 1, B.
CHATS-AS 2011clam1 Integrated analysis of quench propagation in a system of magnetically coupled solenoids CHATS-AS 2011 Claudio Marinucci, Luca Bottura,
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
Characterization of REBCO Tape and Roebel Cable at CERN
CORC®: Results and Perspectives Danko van der Laan and Jeremy Weiss
Outline Many researchers active on theoritical superconductivity physics MaNEP Network & many others Applied research, I will mention.
L. Bottura and C. Senatore on behalf of WP10.2 February 7th, 2017
Status of RACC- Cables: Roebel Assembled Coated Conductor cable
Winding tests on Roebel cables
Lucio Rossi (CERN) WP10 coordinator
CSP 25th November 2010 Technical agreement number 3: overview
WP-7 / Task 4 Very high field magnet
C. J. Kovacs, M. Majoros, M. D. Sumption, E. Collings
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN Conductor and Cable Development for the 11T Dipole
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Roebel cables for EuCARD²: experience and options.
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Naoyuki Amemiya Kyoto University
Kyoto meeting.
the MDP High Field Dipole Demonstrator
EuCARD2 WP 10.2 HTS Conductor
Using the code QP3 to calculate quench thresholds for the MB
Presentation transcript:

EuCARD2 WP10.2 main results and open issues L. Bottura and C. Senatore on behalf of WP10.2 February 15th, 2017

Initial targets (kick-off on 14 June 2013) parameter units targets JE (20 T, 4.2 K) (A/mm2) 600 s (IC) within a unit length (%) 10 M(1.5 T, 10 mT/s) (mT) 300 Range of stransverse (MPa) 100 Range of elongitudinal ±0.3 Unit length (m) Tape parameter units targets IC (20T, 4.2 K) (kA) 10 Provisional width (mm) Provisional thickness 1.5 Effective contact resistance (mW) 5 Cable

Record results 12 mm tapes 20 to 30 m processed unit length 90m tape production unit length Courtesy of A. Usoskin, Bruker-HTS

Good homogeneity demonstrated ± 7% 30 m Courtesy of A. Usoskin, Bruker-HTS

PLD-300 Courtesy of A. Usoskin, Bruker-HTS

Status of work - tape Total 850 m of cable produced by partner Bruker-HTS, this completes the EuCARD2 contractual obligations, and with very good performance (exceeding largely the targets set in 2012) CERN has procured 800 m of tapes procured from alternative sources (A. Ballarino) 200 m SuperOx (June 2015) – 100 m cabled 100 m Sunam (July 2015) – cabled 300 m Fujikura (December 2015) – attempted cabling 200 m (15% Zr) SuperPower (June 2016) – 100 m cabled Nearly 2 km of tape produced/procured Next step: CERN is procuring of a total of 3.1 km of tape (A. Ballarino)

Cable dummies (April 2014) Courtesy of A. Kario, KIT; image CERN

Cable dummies (April 2014) Courtesy of A. Kario, KIT; image CERN

Cable technology Punch-and-coat Burrs and delaminations Dog-boning

Cable technology New punching tool Optimized tool Optimal Cu-coating

Baseline cable designs (October 2015) Skinny Roebel (AB) (out of 0.1 mm tapes) Number of tapes (-) 15 Width (mm) 12 Thickness 0.9±0.1 Transposition pitch 300 Critical current (4.2 K, 20 T perpendicular) (kA) ≥ 4.8 Fat Roebel (CT+AB) (out of 0.14 mm tapes) Number of tapes (-) 13 Width (mm) 12 Thickness 1.1±0.1 Transposition pitch 300 Critical current (4.2 K, 20 T perpendicular) (kA) ≥ 5.8

Final (and first) full length (January 2017) Courtesy of A. Kario, KIT

Status of work - cable Cable production on-going at KIT (A. Kario) All Feather.M0 lengths produced and delivered First Feather.M2 UL delivered to CERN Short length for Ic test in FRESCA produced Second Feather.M2 UL in production (March 2017) CERN has procured 32 m of Roebel cable from SuperOx (Sunam tape) (A. Ballarino) and 60 m of dummy from GCS Next step: production of additional UL’s using optimized tooling at KIT (4 UL’s, A. Kario), as well as SuperOx lengths (2 UL’s, A. Ballarino)

Further activities Ic surface characterization (C. Senatore) Ic measurement on Roebel cables (J. Fleiter) Transverse pressure experiment on Roebel cable (M. Dhalle) AC loss, magnetizatin and Rc measurement and analysis (M. Dhalle, Y. Yang) Quench experiment (M. Dhalle, Y. Yang) BSCCO cable test (LBNL, NHMFL, M. Dhalle)

Ic(B,T,a) Samples delivered by Bruker-HTS, relatively small amount of material (we need to prepare more) Measurements have started at University of Geneva Very important measurement, it will provide a benchmark value for the EuCARD2 tape (not available at present) INSTITUTE  [°] B [T] T [K] KIT 0-360 0.5 70, 77 UTWENTE 0.5, 1, 2 4.2, 10, 20, 30, 40 INPG CNRS 0, (15), 30, 60, 90 up to 25 4.2 UNIGE up to 19 4.2, 20, 40, 60 Reference person: C. Senatore, U. Geneva

Ic measurement on Roebel cables SuperOx cable, 15 strands, provided as a short sample for testing Bruker-HTS/KIT cable has arrived at CERN Courtesy of J. Fleiter, CERN

Ic vs. transverse pressure Program approaching completion of initial scope: Cable I: SuperPower tape, Lp=126 mm, KIT impregnation Cable II: SuperPower tape, Lp=226 mm, KIT impregnation Cable III: SuperPower tape, Lp=226 mm, CERN impregnation Cable IV: Bruker-HTS tape, Lp=226 mm, CERN impregnation Courtesy of M. Dhalle, U. Twente

Open issue: degradation ? Significant loss of Ic observed after a thermal cycle Is this a problem with the sample ? Is this a problem with the insulation system ? Courtesy of M. Dhalle, U. Twente

AC loss/Magnetization/Rc First measurement performed at U. Twente Surprisingly “low” Rc values observed Courtesy of M. Dhalle, U. Twente

AC loss/Magnetization/Rc 4 to 5 mW Liquid Nitrogen Measurement current 2A Potential referenced at strand 15 NOTE: measurements at 4.2 K show a reduction to 2 mW By courtesy of M. Dhalle, U. Twente

Quench experiment 2-mm tape length (Cu-coated) at Twente (measurements in Spring 2017) (M. Dhalle) 2m length of “Frankenstein” cable (E2B-15/5.5-003) shipped to Southampton to attempt a cable quench measurement at high temperature (self field) (Y. Yang) Reference person: M. Dhalle, U. Twente and Y. Yang, U. Southampton

Roebel Pancake Coil for Quench Measurements G10 former with inner current injection terminal Inner current contact to a whole turn, CNC machined to fit cable thickness Soldering cable to contact and then start winding with fibre-glass insulation tape Instrumentation/Heater attached during winding Solder the outer contact to a whole turn Attached outer terminal at the same time Epoxy impregnation Courtesy of Y. Yang, U. Southampton

Bi-2212 cable test Activities restarted, thanks to D. Larbalestier, E. Hellstrom, E. Bosque, (A. Godeke) (NHMFL) and T. Shen (LBNL) Cable HT on CERN sample holder, shipped to U. Twente for measurement

Other items (outside the scope) Test of Feather.M0 in SULTAN to profit from (unique) variable temperature and field conditions Variable temperature insert in construction and commissioning at EPFL/SPC, Villigen PSI

Achievements ✔ ✔ ✔ ✔ ✔ ✔ parameter units targets JE (20 T, 4.2 K) (A/mm2) 600 s (IC) within a unit length (%) 10 M(1.5 T, 10 mT/s) (mT) 300 Range of stransverse (MPa) 100 Range of elongitudinal ±0.3 Unit length (m) ✔ ✔ Tape ✔ ✔ parameter units targets IC (20T, 4.2 K) (kA) 10 Provisional width (mm) Provisional thickness 1.5 Effective contact resistance (mW) 5 ✔ 12 Cable 0.9…1.4 ✔

What is left to do ? Procure more material, tapes and cables to feed the magnet program (see later presentations) Complete the validation of the final cable geometry Ic test in FRESCA Feather.M2 Thermal cycles and check degradation Quench detection and protection experiment Measure temperatures (?), propagation speed and voltage waveforms Magnetization values (effect on field quality) and control Effect of striation (?!?) Measurement of Bi-2212 cable Longitudinal strain limits for winding and operation

WP10.2