Multi-Year Programming and Predictive Modelling

Slides:



Advertisements
Similar presentations
Institute for Road Construction and Maintenance - Vienna University of Technology ISTU O PTIMIZED P AVEMENT D ESIGN W ITH R ESPECT TO Q UALITY AND E CONOMY.
Advertisements

Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
LOW VOLUME ROAD DESIGN EMPIRICAL APPROACH.
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Perpetual Pavements Concept and History Iowa Open House
EVOLVING DEMANDS Highway Usage Increased 29% in the 1990’s Truck Traffic Increased 40% in the 1990’s Truck Traffic Will Increase 3% per year in next 20.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Calibration and Application of HDM-4 for the WSDOT Highway System Jianhua Li Steve Muench Joe Mahoney Department of Civil and Environmental Engineering.
Pavement Management Keeping Good Roads Good, Making Poor Roads Better.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Idaho Transportation Department Karen A. Strauss, P.E. Pavement Management Engineer.
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
Life Cycle Cost Analysis
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
PRIORITIZATION.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
1 Ministry of Transport, Public Works and Water Management.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Asset Management Strategies: Moving from costs to outcomes Tyrone Toole, ARRB Group Ltd South East Australian Transport Strategy Inc, Ordinary General.
Henry Kerali Lead Transport Specialist The World Bank
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Roads Economic Decision Model (RED) January 2008 Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR The World Bank.
Maintenance & Rehabilitation Strategies Lecture 5.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
HDM-4 Institutionalization. 2 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is:  sustainable,
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Road Network Evaluation Tools (RONET) Version 2.00 January, 2009 Rodrigo Archondo-Callao.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
The World Road Association Development of HDM-4 Neil Robertson PIARC ISOHDM Project Coordinator.
HDM-4 Analysis Options The World Bank Christopher R. Bennett Director - Data Collection Ltd.
Treatments and Resets. PerformanceIndex CompositeIndex Triggers Treatments PerformanceModeling ExpressionsAndFilters Costs Resets Outputs GenerateStrategiesOptimize.
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Establishing Pavement Strength HTC INFRASTRUCTURE MANAGEMENT LTD.
Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
HDM-4: Pavement Deterioration Modeling and Road User Effects
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
How does dTIMS work?.
The International Study of Highway Development and Management Tools The World Bank Dr. Christopher R Bennett Senior Transport Specialist.
Road Investment Decision Framework
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
Holistic Pavement Management – Experiences with Performance Based Pavement Management in Australia and South Africa PA Olivier – Dynatest Africa / Jeffares.
PRACTICE INTO ACTION Briefing to. About the Road Efficiency Group (REG) A collaborative initiative by the road controlling authorities of NZ Driving value.
The University of Birmingham Role of HDM-4 in Road Management Professor Henry Kerali The University of Birmingham England, UK.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Alabama Asphalt Pavement Association
Optimisation Modelling for Roads through an Outsourced Service
Data Interfacing HTC INFRASTRUCTURE MANAGEMENT LTD.
European Asphalt Pavement Warranties Scan
AN-Najah National University AN-Najah National University
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Economic Operation of Power Systems
Pavement condition index calculation
Life Cycle Cost Analysis
Infrastructure Delivery Management Toolkit: 2010 Edition
Introduction and Applications
Pavement Preservation
Closed Loop Wind Farm Control
Optimisation Modelling for Roads through an Outsourced Service
Combatant Design and Fleet Mix Assessment and Optimisation using BAEFASIP Dstl/CP Chris Brett, Dstl, UK Dr Malcolm Courts, BAE Systems Maritime,
Pavement Overlay Design
NRRA Pavement Workshop 2019
About us… Click.
Presentation transcript:

Multi-Year Programming and Predictive Modelling An Overview

Multi - Year Programming The process of applying maintenance interventions to treatment lengths across the network over the life cycle of the pavement

Requirements for Multi-Year Programming Data on road characteristics, condition, traffic etc. (RAMM) Treatments, effects, costs and trigger levels Prediction models for pavement deterioration Prediction models for road user effects Software to apply the models and prioritise alternative strategies

Selecting the Right Treatment and Applying it at the Right Time to Optimise Life Cycle Costs Predicting What Treatments and When EFFECTIVE LIFE REPLACE PROGRESSIVE ( ACCRUED ) COST OF FACILITY CASH FLOW OF ASSETS CREATE MAINTAIN DISPOSAL REFURBISH 100% VALUE / COSTS ( REAL TERMS )

Definitions Treatments Strategy A maintenance activity applied to a pavement Strategy A treatment and when it is applied SCHEDULED - regular time intervals RESPONSIVE - responds to condition

A Strategy is a series of Treatments

Predictive Modelling A tool used by Asset Managers to assist in the determination of the timing of maintenance treatments over the life cycle of the Asset Utilises a modelled rate of deterioration and economic benefits and costs to assess timing

Deterioration Management EXCELLENT ORIGINAL DECAY OPTIMAL CONDITION BAND ASSET CONDITION Maintenance Treatments OPTIMAL RENEWAL STRATEGY POOR TIME

Treatments, Triggers and Resets Decay in Condition (DETERIORATION) EXCELLENT Condition Improvement (RESET) ASSET CONDITION Minimum Acceptable Standard (TRIGGER) Treatment Applied POOR TIME

Treatment Generic Types Strengthening Reconstruction AC Reconstruction ST Thick Asphalt Overlay Thick Granular Overlay Smoothing Thin Asphalt Overlay Thin Granular Overlay Rip and Replace ST Rip and Remake AC Mill and Replace AC Resurfacing Large Chip Resurfacing Small Chip Resurfacing

Economic Considerations There are three options utilised Maximize Area under Curve Minimize Total Transportation Cost Maximize Saving in VOC

Area Under Curve (AUC) Composite Index Analysis Period Time Benefit Strategy Composite Index Salvage Do-nothing Analysis Period Time

Minimize Total Transportation Cost (TTC) Optimum Maintenance Total Transport Costs COSTS Road User Costs Maintenance Costs Construction Costs MAINTENANCE LEVEL

Maximize Saving in VOC VOC Analysis Period Time Benefit Do-nothing Strategy Analysis Period Time

Selection of Economic Analysis Method (example) Objective Function Const. Budget Poor Roads Med. Budget Poor Roads Adeq. Funding Good Roads Objective Function Area Under Curve Total Transportation Costs Vehicle Operating Costs

Selection of Strategies The efficiency frontier is used in the selection of optimum strategies Utilises the incremental benefit cost ratio to select optimum mix of strategies

Selection of Strategies (Efficiency Frontiers) Benefits Costs IBC 2 3 4 5 B A

What we do to a road now is determined by: The characteristics of the road The traffic using it The available funding The performance standards to be applied in the future

Programme Level Analysis can tell us: What budgets do we need to achieve a given set of performance standards? What treatments will be applied, when and where to meet those standards? What treatments should be applied, when and where if budgets are less than ideal? What will be the performance level of the network with constrained budgets?

Types of Analysis Performance Based Analysis Defines the budget required to meet a performance standard (Level of Service) Economic Analysis Defines a maintenance strategy designed to fit a fixed budget

Economic Analysis Defines the optimum maintenance strategy for each road section given a set of budgets for the road network Requires prediction of costs and benefits for alternative strategies for each road section Requires an optimisation procedure with an objective function e.g. minimise total transport costs Typically used by a road agency when contracting works on an annual basis

Performance Standards Analysis Defines budgets, treatment types and timing to meet a given set of performance standards Not necessary to consider road user costs Typically used by a road agency to support funding applications or contractors bidding for performance based contracts Objective of the analysis is to minimise maintenance costs while meeting the performance standards

Performance Standards can be defined in many ways: Average service levels for the whole network or broad categories of road Minimum service levels for categories of road Trigger levels for specific treatment types The way the standards are specified will affect the analysis setup

Data requirements Road Referencing Data Traffic Characteristics Pavement Properties Pavement History Road Condition Strength Data

Budget Constraints Short term budget constraints may imply increased spending in the future Important to define long term performance standards that are affordable Refine triggers in a Performance Standards analysis to fit budgets and apply these triggers in Economic analysis as long term standards

dTIMS Pavement Models Have mainly implemented modified HDM-III for Phase I Predicting Cracking Ravelling (Flushing) Potholing Roughness Texture SCRIM

Pavement Strength Can be one of the more important pavement deterioration modelling parameters Analysis uses SNP: Structural Number of the Pavement Methodologies to assess SNP are included in the project A range of options is available with varying data complexity needs

Available Methods FWD with Layer Thicknesses FWD without Layer Thicknesses CBR Layers Benkleman Beam ARRB Pavement Capacity Typical Pavement Designs