AIDA st annual meeting DESY, 27/01/2016

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Taikan Suehara, 13 May 2014 page 1 Status of SiW-ECAL development for ILD Taikan Suehara (Kyushu University) on behalf of ILD SiW-ECAL development.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
ECAL silicon- tungsten status
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
1 1 - To test the performance 2 - To optimise the detector 3 – To use the relevant variable Software and jet energy measurement On the importance to understand.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
14.4. Readout systems for innovative calorimeters
Analysis of LumiCal data from the 2010 testbeam
Beam test of Silicon-Tungsten Calorimeter Prototype
Test Beam Request for the Semi-Digital Hadronic Calorimeter
FCAL R&D towards a prototype of very compact calorimeter
SiD Calorimeter R&D Collaboration
CALICE Meeting Tokyo University, 26/09/2017
Status of Ecal(s) for ILD
Tracking System at CERN 06 and 07 test beams
Panagiotis Kokkas Univ. of Ioannina
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
BT2017 Analysis meeting LAL, 30/11/2017
CALICE Collaboration Meeting KEK/Japan – April 2015
ScECAL+AHCAL+TCMT Combined Beam FNAL
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Michele Faucci Giannelli
Status of CEPC HCAL Optimization Study in Simulation LIU Bing On behalf the CEPC Calorimeter working group.
LC Calorimeter Testbeam Requirements
Presentation transcript:

AIDA-2020 1st annual meeting DESY, 27/01/2016 Activities in Task 14.3.1 Test infrastructure for innovative calorimeters with semiconductor readout Vincent Boudry École polytechnique, Palaiseau on behalf of the WP14.3.1 task participants AIDA-2020 1st annual meeting DESY, 27/01/2016 Part I TNA support + WP14

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 Task 14.3 Test infrastructure for innovative calorimeters with semiconductor readout (CERN, CNRS- LLR, CNRS-LPNHE, CNRS-LAL, DESY, TAU, AGH-UST) Assembly and QA chain for silicon-based Ecals Development of an assembly line for highly granular calorimeters with semiconductor readout Test benches for individual silicon wafers and PCB for quality assurance and to study alternatives Development of a test station to determine signal characteristics in highly irradiated silicon sensors Validation of a compact calorimeter prototype including flexible precision mechanics and readout Calorimeters with pixelated Si wafers allow for an excellent particle separation. After an extensive R&D activity supported by EUDET and AIDA, the next step is the development of tools for construction and quality assurance of large-scale prototypes for an ILC-like detector. This starts with the production of test benches for Si wafers and interface boards. These components are glued together into a detection unit of the order of 20×20 cm² using a robotic system. Up to 10 units will be assembled into detector layers using automated tools. Such a calorimeter could be also a viable option in a hadron collider environment, such as CMS. A dedicated test set-up is needed to test the signal characteristics of irradiated Si wafers operated at temperature at or below -35 degrees C. This talk Marcello Marek Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 Document for MS14 Slightly late Proof reading by WP coordinators → SC coordinator Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

SLAB Assembly: full chain Copper (cooling) Shielding R&D for “mass production” and QA Quality tests & preparation of large production Modularity → ASU & SLABs Choice of square wafers (≠ from hex: SiD, CMS HGCAL) Numbers (RECAL = 1,8 m, |ZEndcaps|=2,35m) (likely to be reduced by 30–40%) Barrel modules: 40 (as of today all identical) Endcap Modules: 24 (3 types) Slabs = 6000 (B) + 3600 (EC) = 9600 many ≠ lengths ASUs = ~75,000 Wafers ~ 300,000 (2500 m²) VFE chips ~ 1,200,000 Channels: 77Mch PCB (FeV) ASU Wafer (4) Adapter board (SMB) Carbon+W U layout of a short slab Now we have 10 ! U layout of a long slab Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Full assembly chain resp: R. Cornat + L. Lavergne ⚠ Simplified view ⚠ Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

PCB Metrology by D. Lacour Development of an automatic process using a coordinate measuring machine (tri-dim machine) Before cabling : Squaring, Parallel edges , Size Thickness (flatness in depression) Flatness After cabling : flatness and thickness Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 PCB Metrology results 40 PCB controlled Criteria (measurements before cabling) Planarity tol.0.4 mm Size : 180.20 to 180.30 mm Thickness: 1.55 to 1.70 mm Squaring: tol. 0.05 mm Edge parallelism tol.0.05 mm Rejection yield : ~40% (essentially due to a too large size for alveola) Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

ASU Setup“4 wafers without glue” Mickael Frotin @ Annecy  The goal: 2.0 – Setup option with support of test electric probes for connecting WAFER to FEV - Realize an assembly with removable wafer in order to acquire cosmic data. This assembly will test the entire acquisition chain (Wafer-FEV-SMBV4-DIF-GDCC-CCC-PC-Software) before the wafer gluing operation. The first test was realized last week Hv Kapton WAFER FEV SMBV4 Dif Mechanical support for 1024 Test Probes PCB shielding Thanks to Marc Louzir Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Test plates: noise reconstruction With single glued ASU: Noise determination Prelimary cosmics measurements → Testbeam measurement Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Measurement and Gluing Test Bench Several test with fake (glass ASU) 10 ASU glued and in test Quality procedure to be consolidated Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

First step : one wafer glued per PCB The parameters of the gluing robot have been optimized to glue a silicon sensor (18×18 pads) on a PCB Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Second step : 4 wafers per PCB Deposit of glue on the PCB 256 × 4 = 1024 dots Move the plate with the 4 wafers on the PCB The alignment is fundamental : PCB = 180.3 mm maximum Wafer = 90 mm Possible improvement: optical measurement of planarity Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Electrical tests results Measurement after gluing onto the PCB 10 ASU tested, all functional (no short cut). I(V) measurement for each wafer before gluing – leakage current 150 nA @ 200 volts ASU 23 33 34 42 I total (µA)@140V 1.9 11 15 5 Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Assembly of SiW ECAL layers (LAL) ~ 13 steps for assembly, 8 élements! Tests done: Soldering: ✔ Electrical test: ✔ Readout test: ✔ 10 Slabs produced and tested QA procedure to be consolidated Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 Production of SLAB’s Prod between LLR + LPNHE + LAL Supervision done by Rémi Cornat → production for next TB ~3 batches of production All critical material available (ASIC’s, Wafers) ~Now August Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 Beam Tests Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Beam test at CERN 2015 2–16th of November Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

CERN 2015: Running conditions & program Masking : 2.2% of all channels in TRIGGER only Muon beam spots (X-Y distribution of N triggers, requiring ADC-pedestal>10) from typical muon run (361 as example) DAQ & config: very smooth (1 single crash due to unchecked physicist scripting) Adjust threshold by progressive noisy cell masking Many data taken (but “only” ~85 GB) Beam structure + ACQ for ILC (bursts of 50 ms × 4Hz) Muons runs Calibration first @ high threshold variation of threshold, and angles (49°, 90°) Electrons of 15, 30, 50, 100, 150 GeV with 8.5 X0 with mini-cal option this WE Pions of 50 and 150 GeV with 1.75 λ Check non unconventional events Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 CERN 2015: Analyses 1st : verification of behaviour with simple events SK2 response ⇐ was a priority for SK2A prod Filtering Noise and establishing clean events 2nd : check of collective response Correlation between plates Modelling of shower response G4 MC being written by A. Psallidas (National Taiwan University, CMS) Examples given here analyses from V. Balagura, K. Shpak First analysis of efficiency Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 CERN 2015: Annoyances Good news !!! Re-triggering! Masking verification: some issues Data corruption in case readout time wasn’t sufficient corrected by DAQ settings Negative signal (ADC=4) located near the DIF connectors Pedestal stability Slow drift after power-on on long period Spilt and delayed triggers “High intensity” signal delays trigger Chip full events Non-operationnal chips if SCA=15 in ACQ-1 Pedestal width: S(MIP) / RMS(pedestal) =17..18. Good even for short spills with “real” power pulsing and drift effects For 100M ch ECAL, with a Thr @ mip/3 = 5–6 σ ⇒ p(noise/cell) = 6×10-7–2×10-9 ⇔ 60–0.2 hits/BX Most corrected in SK2A Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Efficiency from tracks (prelim.) by V. Balagura Space Using tracks extrapolation from 2 planes onto the 3rd one very clean samples of tracks 1 hit/ layer adc-ped > 40. no constrain on studied layer Time : BX±1 Track maps (layer 3) Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Efficiency map of triggering on mips (prelim.) by V. Balagura ε vs ch per chip ε vs Memory (SCA) ~ Time ⟨ε⟩CHIP> 97%; ⟨ε⟩LAYER ≥ 98.3 % Single inefficient chip (in 48) Small dependence (also in pedestals) but for faulty chip – High mip detection efficiency – mandatory for PFA – is reached – Low fraction of non-triggering zone (~2%) + 2% as faulty chip. – Re-triggering occurrence in BX±1 ≤0.5% Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

OMEGA SKIROC2A by S. Callier, C. de la Taille 400 SK2A chips delivered. Power OK Production possible through CMS-HGCAL collaboration Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 BT in 2016 and beyond Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 Beam test June 2016, 7–22 preparation by R. Cornat, F. Magniette, J. Nanni Real calorimetric tests with 10 SLAB’s in coordination with SDHCAL 10 slabs (no more test plates) 3 JIT + 1 repaired but 1 lost due to a brutal general power cut @ CERN expected improved S/N ratio, robustness Flexible structure to accommodate variable number of SLAB’s be in “real conditions” for PFA tests: 24 X0 of W + 3 7 cm gap before SDHCAL Goals: ⇒ Instrumental characterisation of SLABs ⇒ test of PFA tools R. Cornat Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

Commissioning by R. Cornat, F. Magniette, J. Nanni Beam ≥ 10/06 but Power Cut on 11/06 → damages SDHCAL (5 layers) + ECAL (1 slab) DAQ running in common with SDHCAL (SC, spill, Control) Synchronous data storage ✔ Data Exchange unstable ✘ (for online) Commissioning Noise scan (High Gain) → threshold high (270 ~ 85% mpv)! Noise issue tracked to limited PS on Sunday (+effect of power cut ?) Plans: Strengthen PS ✔ update DAQ for exchange (today) Common Runs 16–22... Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016

WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016 Conclusions Production of 2 small batches well on tracks 10 slabs working! (but for CERN PS) Some procedural defects corrected Spin-off for ATLAS HGTD 3×3 mm³ pads gluing Quality procedure to be consolidated (e.g. centralized) SiW-ECAL detector units: Fine at low E (mips) Some issues with ASICs ⇒ to be corrected in next version High Energy behaviour to be tested. Activity on time... MS report almost through (~2M late) Vincent.Boudry@in2p3.fr WP14.3.1 report | 1st Annual meeting | DESY, 15/06/2016