AFC 2017 (and 2018) AFC timeline:

Slides:



Advertisements
Similar presentations
SPS New Wire Scanner Mechanics Review
Advertisements

HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Stripping Foil Test Stand in the Linac4 Transfer Line
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
1 st impedance working group meeting Christine Vollinger, Benoit Salvant Mandate Draft proposal for: Structure Procedures List of members Opening discussion.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Survey on “Chargés de Consignation” Status Update
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Linac4-PSB 160 MeV connection readiness review
ICE SECTION The coolest place to be! Elias Métral
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
BE-CO Activities for LIU-CPS and LIU-SPS
Brief Status SPS Prototype PSB Prototype Installed in LS1
EYETS David Hay EN-OSS.
LIU Wire Scanner Milestones June 2017
LIU – EVM status and next steps
LIU–PLI report LIU PSB meeting.
Looking back on 2014 and Perspectives for the MPE Group in 2015
Planning and Installation
EC Activities Status for the LIU
BE-ICS activities for LIU Project
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
M.Jonker CTC MPO-WG status
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
LIU, ABP-CWG, PBC, miscellaneous
Update on the Ethernet Network Installation Campaign
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Upgrade Strategy for the Experimental Vacuum Systems
East Hall under construction
LIU Wire Scanner Series Costs
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
HIE-ISOLDE Project: Planning & Resources
LHC External Collimation Review
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
ThomX – Commissioning Meeting – 25/01/2018
List of IPAC19 papers with reference to HL-LHC
LIU-SPS review for BI (no BWS)
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
WP13 outsourcing: Hollow Electron Lens
Status of the BI Work Package in the LIU-PSB frame
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

AFC 2017 (and 2018) AFC-2017-1 timeline: Application of candidates: closed Candidates file to department : 4 April 2017 Selection by department : end April 2017 CERN selection committee : 16 May 2017

LIU general: none in AFC-2017 and 2 in AFC-2018 Machine Supervisor Group Candidate Profile LIU AFC date Group: AFC date request Start/End date Subject BC  LIU EN-STI EN/STI T.b.d GET Fellow AFC-2018-2 PS Booster absorber/scraper (from Q3/4 2016) . o The candidate will be dedicated to the conceptual and technical design (plus prototyping and FEM calculations) of the new PS Booster absorber/scraper. - 1 FELL (replacement) starting towards end 2018 (AFC-2018-2) dedicated to PS Dump and PS Absorber/Scraper. Similarly to the configuration above, a superposition will be required with the current fellow, also to follow-up the commissioning of the device. 50% 62011 and EN/STI tbc TTE Fellow follow-up construction, mock-up validation (TIDVG5) & installation of LIU devices such as TIDVG#5, PS Internal Dump, TCDIL and PS Booster Absorber/Scraper 62011

LIU-IONS PS injectors – 1 request in 2017-2 Machine Supervisor Group Candidate Profile LIU AFC date Group: AFC date request Start/End date Subject BC  LIU-ION R.Scrivens or G.Bellodi BE/ABP T.b.d GET Fellow AFC-2017-2 AFC-2018-1 Mid 2018->mid 2020 Linac3 beam dynamics 62011 LIU-PSB and PS : 5 in AFC 2017-1 – 0 in AFC-2018 Machine Supervisor Group Candidate Profile LIU AFC date Group: AFC date request Start/End date Subject BC  LIU-PS Caterina Bertone EN/HE T.b.d GET Fellow AFC-2017-1 AFC-2016-1 Feb-March 2017 for 2 years Handling studies for LIU (PS, SPS, Ions) 62011 Serge Pittet TE/EPC TTE Fellow AFC-2016-2 07/2017-06/2019 LIU-PS injection power converter development, purchasing, tests and commissioning put LIU 62011 until they provide us with a material BC Richard Scrivens BE/ABP   Space charge studies in the PS (Serluca leaving) Thomas Kramer TE-ABT A. Ferrero Colomo July 2017 Upgrade of  Fast Pulsed Systems  within the scope of the LIU-PS project    LIU-PSB AFC-2017-2 Space charge studies in the PSB Merge the 2 BE/ABP requests into 1 and request it for AFC-2017-2 ?

LIU-SPS : 5 in AFC-2017-1 and 3 in AFC-2018 Machine Supervisor Group Candidate Profile LIU AFC date Group: AFC date request Start/End date Subject BC  LIU-SPS Richard Scrivens BE/ABP T.b.d GET Fellow AFC-2017-1 AFC-2016-2 Studies for the Q22 optics. In practice this fellow will be shared between Kevin and Hannes, and Kevin will be involved in the studies for instabilities – eg. TMCI. We also are looking for other partial support options in the group, but given the work for Q22, someone to follow up simulation and measurement full time is needed 62011 Rhodri Jones BE/BI August 2017->January 2019 fellowship on radiation hard electronics for the new SPS BPM system Standby. we keep this additional Fellow request in the LIU Fellows list and let’s make a final decision in Q1 2017, when we have all the final ones, from all the groups and LIU machines Injector BLM system commissioning and qualification. This fellow would undertake a performance analysis of the system in L4, PSB and PS and then define the thresholds to be used for machine protection. It was noted that for the moment there is little support in the PSB in particular for such detailed analysis – another reason why we believe this to be essential manpower for the BI BLM team. Thomas Kramer TE/ABT AC-2017-1 Mid-2017-mid 2019 LIU-SPS SBDS (GTP stack development, integraton, testing. PFN testin, MKDV magnet follow-up, Pspoce simulation, Specs) and CONS LBDS 50% 62011 and 50% CONS Daniel Ricci EN/EL Jul-17 Preparation / Excecution LIU-SPS activities Simone Gillardoni EN/STI AFC-2018-1 TE/VSC LIU related activities. 50% of a fellow will be funded by LIU. The LIU 50% includes vacuum support/activities for the TCDIL mainly (plus some vacuum support for PS dumps and PSB scrapers). EN/STI will look with HL-LHC for the other 50%. 50% funded by LIU. EN/STI will look with HL-LHC for the other 50%. Nov-18 Support to BPM and other LIU fibre project AFC-2018-2 Jan-19