KENDRIYA VIDYALAYA DUNGARPUR (RAJASTHAN)

Slides:



Advertisements
Similar presentations
X Y 1. Forces Table/Ramp Earth Fe on b Fe on b x Fe on b y Ft on b Fx = Fe on b x Fy = Fe on by + Ft on b.
Advertisements

Samanthas Performing Arts Centre By Sam. Why Create a Performing Arts Center? The reason that we need a Performing Arts Centre at Dio, is because we are.
RICHVIEW LIBRARY- Ground Floor Interior Renovation TABLE OF CONTENTS Submission for OLA Library Building Award 2012 Richview Library – Ground Floor Interior.
Unit 1 (Part A) The first day at school.
Chapter 6, Book 2A Places in the park.
St Andrews School A Tour Of The School By Daniella.
Classroom 1. Mission San Luis Rey.
Environment club: preparing the land to plant vegetables and flowers to embellish our dear school FBG!!!
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review.
Welcome to Gladstone Primary School. We are a large school set over two sites… Juniors Infants & Nursery.
Government of the Republic of Montenegro The Ministry of Education and Science Directorate of Public Works SECONDARY SCHOOL OF MEDICINE.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Centerville Elem. School Beverly, MA Front entrance.
SCHOOL MAPPI NG PRESENTATION BY SATISH GIROTRA Senior Consultant, TSG, EDCIL.
Senior Architect (WZ)I C.P.W.D.Mumbai MULTIPURPOSE HALL FOR SPORTS AUTHORITY OF INDIA GANDHINAGAR.
WE OFFER RESIDENTIAL AREA WELL-EQUIPPED FACILITIES WITH ALL THE AMENITIES YOU NEED TO BECOME AN IDEAL PLACE FOR YOUR SUMMER CAMP AND TO STAY AT THE.
2013 Edgewater Survey Analysis. Question Analysis SatisfiedDissatisfied Don't Use/No Opinion Value received for your Edgewater Owners Association 2012.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
TAKE EXIT 38 FROM I-84 Westbound TAKE EXIT 39 FROM I-84 Eastbound.
Forms of Housing Common housing options in Australia
We introduce … Gymnázium, Praha 8, Ústavní 400 Appearance of our school Our school is located in a courtyard type building in a large area surrounded.
KENDRIYA VIDYALAYA IIM JOKA. OUR SCHOOL Located in Indian Institute of Management - Joka – KOLKATA Students Strength:-1010 Staff Strength:-44 Class :-
THE TURKISH REPUBLIC GAZİ UNIVERSITY - FACULTY OF TECHNICAL TRAINING DEPARTMENT OF MACHINERY THE TURKISH REPUBLIC GAZİ UNIVERSITY - FACULTY OF TECHNICAL.
PRESENTAION ON MY VIDYALAYA
In Partnership with Palangoy Gospel Church ETWF Church and Training Centre.
________________________________________________________________________________________________________________________________________________________.
KENDRIYA VIDYALAYA BHU,CAMPUS Varanasi Established in 1965.
The Primary School in Lubenia
Focus Areas Safe and secure buildings and grounds Learning environments that meet the needs of today’s learners Preserve, maintain, and/or improve current.
Learning, Health, and Safety Capital Project Alternates and Change Order
PROVIEW CONSTRUCTION LTD SAI SHARNAM Pictorial walkthrough.
SIZE - Top SERVER ROOM Designed by – openbox |
The New Leavelle McCampbell Middle School Design Development Presentation.
WELCOMETOWELCOMETO We are here! How do you get our school? C/ Ángel Luis de la Herrán, – MADRID Buses: 9, 72, 73, 107, 112, 120, 125, 153,
Can you learn in the classroom?. Learn in the classroom, learn in the classroom. Can you learn in the classroom? Yes, … yes, you can.
This is our school in early spring on a sunny autumn day.
Birds Eye view of the Vidyalaya. Entrance of the Vidyalaya.
Library as Classroom activity in Primary Education
My school. Unit 1 My school Places in my school This is the classroom.
Route 1 Route 2 Route 3 Open Day 2016 Tours Route 4.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
What do we have at school?
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
VISITOR’S SITE INDUCTION Kings Yard Energy Centre
Goding Elementary Existing Conditions Presentation February 13, 2013.
Master Plan of School of Health Science
PROVIEW CONSTRUCTION LTD
Gérard Philipe Middle School
Kendriya Vidyalaya, AFS Bihta
East Doncaster Secondary College
,
2007 Bond Issue Capital Improvement Program
Furniture Project Interior Design 2.
What’s there in the living room? There is/are… music room computer room art room playground classroom library.
Primary Longman Elect 2A Chapter 1 There is Is there …?
Where …? Unit 2 Open Day.
BY HERBER.
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Joint Excon meeting Cum training
ROOM 125b 10:00-12:00 Tides: Science & Cultural Impact of Waves
North Augusta High School – Phase 2A and 2B
Mrs. B’s Classroom Layout
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
“An outstanding learning centre at the heart of the community”.
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
The New Leavelle McCampbell Middle School
A. Write the correct numbers !
Presentation transcript:

KENDRIYA VIDYALAYA DUNGARPUR (RAJASTHAN) Photographs of Existing Infrastructure (Temporary Building) & KVs Under Construction (Permanent Bulding)

Front View of Temporary Building

Rear View of Temporary Building

Parking View in Temporary Building

Ground’s View in Temporary Building

Table-Tennis Game’s room in Temporary Building

Prayer’s Ground View in Temporary Building

Music Room in Temporary Building

Library in Temporary Building

Display Board in Temporary Building

Science Laboratory in Temporary Building

Computer Laboratory in Temporary Building

Classroom in Temporary Building

Classroom in Temporary Building

Classroom in Temporary Building

Classroom in Temporary Building

Top View of Permanent New Building

Quarter’s Side View in Permanent New Building

Main-Gate’s View in Permanent New Building

Front View of Quarters in Permanent New Building

Parking View in Permanent New Building

Side View of Permanent New Building

Front View of Permanent New Building

Admin Block’s Entrance in Permanent New Building

Stairs in Permanent New Building

Ramp Facility in Permanent New Building

Rear view of Permanent New Building

Ground’s Construction view in Permanent New Building

Primary Wing in Permanent New Building

Admin Block’s Outside View in Permanent New Building

Botanical Garden’s Construction View in Permanent New Building

Pathways’ Construction View in Permanent New Building

Thanks!