1 SWS @ Goding Elementary
Existing Conditions Presentation February 13, 2013

2 Location Plan Logan Annex Goding 10th & F St. NE Peabody E.S.

3 Vicinity Plan Sherwood Rec. Center Parking Lot Goding E.S.
Property Line Parking Lot Goding E.S.

4 View from corner of 10th & F St.

5 View from 9th St.

6 By the Numbers

7 First Floor Plan Classrooms Health Suite Admin. Suite

8 Interior Photos First floor, entrance vestibule

9 Interior Photos First floor, auditorium

10 Interior Photos First floor, administrative area and health suite

11 Ground Floor Plan

12 Interior Photos Cafeteria and kitchen

13 Second Floor Plan Science Lab Kitchen

14 Interior Photos Typical classrooms

15 Interior Photos Group instructional areas: science lab, kitchen

16 Third Floor Plan Library

17 Interior Photos Library

18 Fourth Floor Plan

19 Interior Photos Corridors and stairs

20 Interior Photos Student bathrooms

21 Milestones Late March: Confirmation of Summer 2013 construction scope with DCPS May: Design presentation to SWS community June 20: Last day of school June 21 - August 14: Projected construction at Goding E.S. August 15-18: Projected SWS move-in at Goding E.S. August 19: Teachers’ first day of school August 26: Students’ first day of school Summer, 2014: Goding E.S. scheduled for Phase 1 Modernization


Download ppt "SWS @ Goding Elementary Existing Conditions Presentation February 13, 2013."