June 21, 2000Trigger Meeting 1 L1 SciFi Trigger (CTT/CPS/FPS) Commissioning System overview status of components (Fred's) plans for installation software.

Slides:



Advertisements
Similar presentations
Gründlich durchgecheckt steht sie da Thoroughly checked over she stands there und wartet auf den Start alles klar And waits on the start…All is clear.
Advertisements

Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Bob Hirosky, UVa 7/27/01  Level 2 Processor Status  Bob Hirosky The University of Virginia 
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
SEQUENCER DELAY PLD By ANTON H.C. SMITH ELECTRICAL ENGINEERING UNIVERSITY OF SOUTH CAROLINA.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
Standard electronics for CLIC module. Sébastien Vilalte CTC
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Update on CSC Endcap Muon Port Card
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
DCM II DCM II system Status Chain test Schedule.
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Presentation transcript:

June 21, 2000Trigger Meeting 1 L1 SciFi Trigger (CTT/CPS/FPS) Commissioning System overview status of components (Fred's) plans for installation software needs commissioning Was ist der Mensch, daß er Pläne macht ! Brief des Lord Chandos an Francis Bacon, Hugo von Hofmannsthal

June 21, 2000Trigger Meeting 2 Overview SciFi & Preshower Trigger System Basic scheme: –Analog front-end –Mixer crate –Digital front-end w/ controller –Collector/Broadcaster system (octant/sextant/quadrant) –Trigger Term (singlet) board –(Muon) trigger manager Links: –Internal all LVDS –Serial copper (AMCC) for 80 sector links to muon –Serial fiber (g-link) to L2, L3

June 21, 2000Trigger Meeting 3 The Digital Board Digital Board daughtercards are application-dependent: –Axial trigger (DFE) –Collector ('octet') –Concentrator ('singlet') –Roman pot trigger DFE Daughtercard

June 21, 2000Trigger Meeting 4 L1 SciFi HW/FW status Hardware/firmware status: –common DFE/COL/BRC/TT motherboard: prototype working. –DFE daughtercard: prototype working. –special 'datapump' I/O board: working with DFE. –other daughtercards: firmware well advanced (except for STT broadcaster), but no hardware prototypes yet adapt firmware to DFE card for 'first chain' milestone ??? Probably not. –Crates, backplanes & power supplies: prototype working; only one DFE type crate needed for 'first chain' milestone. –Master clock interface: SCL-AFE-DFE this part of AFE still needs to be tested. –cables: SVX/Sequencer on hand (not needed for DFE-and-up chain). optical fibers on hand (L1-L3 and L1-L2 paths). LVDS: prototypes on hand; sufficient for 'first chain' test ? CTT-internal Hardware/firmware tests: for detailed description see notes by Fred; loopback tests with varying number of boards in loop; DFE-only test is implemented and running. Ja, mach nur einen Plan Sei nur ein grosses Licht! Und mach dann noch'nen zweiten Plan Gehn tun sie beide nicht Aus dem Lied von der Unzulaenglichkeit menschlichen Strebens, Dreigroschenoper, Bert Brecht

June 21, 2000Trigger Meeting 5 L1 SciFi Trigger Installation crates: as needed over the next few months: –Platform: 7 DFE, 1 Mixer, 1 MTM (PC03, PC04, PC19, PC20, PW02, PW03). –MCH: VRB crate; MTM L3 R/O crate power supplies: ditto; need to adapt some old muon PS. boards: as they become available; usefulness of adapting other firmware to run on DFE daughtercard just for August 1 milestone questionable. cables: bulk (long haul fiber optics, AFE-Sequencer) during next month, internal LVDS after crates are populated. Ein perfekter Plan, so perfekt, daß eine nichtige Komplikation genügte, um ihn platzen zu lassen. Wenn ein Reisender in einer Winternacht, Italo Calvino

June 21, 2000Trigger Meeting 6 L1 SciFi Trigger Software Und allen Plänen gegenüber begleitet mich die Frage: "Was soll der Unsinn?" Eine Frage, die überhaupt ganz und gar von mir Besitz zu nehmen droht. Theodor Fontane

June 21, 2000Trigger Meeting 7 L1 SciFi Trigger Commissioning I was in a warm bed, and suddenly I'm part of a plan. Shadows and Fog, Woody Allen Now until August: First Step(s): closed loops of various sizes; minimal needs beyond JTAG firmware download: datapump + PC control August: Minimal DØ-integrated solution for 'first chain' test: download and init DFE-type boards via JTAG; special firmware for DFE's to generate static trigger pattern; need working Muon TriggerManager - Framework communication we will share the existing MTM prototype with the Muon system. assuming that VRB software (download, control, R/O to buffer for Examine) can be 'borrowed' (adapted) from SciFi waveguide commissioning. Install production boards and enlarge system under test as boards become available. Mid-September: If sufficient (pre)production quantities of AFE's available: try to setup simple cosmic trigger ? Difficult without mixer crate. Probably SciFi cosmics for detector commissioning need to rely on Muon trigger. switch over to our own Trigger Manager crate. November: Cassette + AFE + Mixer systems complete: finish hookup, implement SciFi cosmic trigger with special DFE firmware.

June 21, 2000Trigger Meeting 8 L1 SciFi Trigger Integration Integration with Muon L1 and CTT L2: –cables: 80 Muon sector cables: could go in early (July ?); preferred after DFE are in place. CTT/CPS/FPS L2: optical fibers; to be installed soon. –protocols: are defined. –Test pattern generation: with special DFE firmware. –Test pattern verification: needs special software (Muon/L2) ? –Cosmic running: ditto Integration with Trigger Framework: –all upstream communication through Muon Trigger Manager ('plug and play' - Fred B.) –SCL interface through AFE. Integration into Readout to L3: –protocol/data patterns are specified. –VRB control: hopefully not so different from other readout tasks. –L3 unpacking: needs to be done. –Monitoring: needs to be written. "Ihr werdet schon sehen, wenn ihr im Leben steht, ohne Organisieren kommt ihr nicht weiter" Die gerettete Zunge, Elias Canetti