2008 Hurricane Season Preparations

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Storm Preparedness Workshop Verizon Florida, LLC May 23, 2007.
Electric Infrastructure Workshop January 23, 2005 Florida Public Utilities Company.
Lee County Electric Cooperative 2006 Hurricane Preparedness Plan.
Hurricane Season Preparedness Briefing Gulf Power Company June 5, 2006.
Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
Florida Public Service Commission Internal Affairs Hurricane Season Preparation Paul Davis, Director Energy Control Center June 5, 2006.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
FPL Hurricane Assessment Operating Committee January 25, 2005.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
Learning Forum: Regulatory Issues Affecting Contracts and Operations in the Near Term Presented to the SEE Joint Use Committee by Charles A. Zdebski Troutman.
Dynamic Modeling of Components on the Electrical Grid Bailey Young Wofford College Dr. Steven Fernandez and Dr. Olufemi Omitaomu Computational Sciences.
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Rapid Assessment A quick evaluation of a disaster/emergency impacted area.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Florida Power & Light 2006 Hurricane Preparedness Plan June 5, 2006 Presented by: Geisha Williams.
Storm Hardening Workshop Docket No Verizon Florida, Inc. July 13, 2006.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
Automated Capacitor Control Program at TXU Electric Delivery SWEDE May 1, 2006.
C o n f i d e n t i a l Human Resource Planning Unit- 3.
1 Example of Audit Committee Package Company Source: Protiviti KnowledgeLeader Audit Plan by Division Proposed Plan.
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
1 © AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Florida Public Service Commission’s.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
Public Power in Florida Mutual Aid and Storm Readiness Barry Moline Executive Director Florida Municipal Electric Association ,
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
May 6, STORM PREPAREDNESS EMBARQ – FLORIDA, INC. Sandra Khazraee – Regulatory Manager.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 1, 2008.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
James Lee Witt Associates Emergency Management & Damage Mitigation Florida Public Service Commission Electric Utility Infrastructure Workshop January 23,
Maryland Public Service Commission 2006 Summer Reliability Status Conference May 16, 2006 Baltimore, MD.
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
Utility Needs and Smart Grid for Major Storm Events
Impact of Hurricane Ike on
Florida Public Service Commission’s 2007 Storm Preparedness Workshop
Public Power in Florida Mutual Aid and Storm Readiness
Florida Public Service Commission
EMBARQ – FLORIDA, INC STORM PREPAREDNESS May 1, 2008
Hurricane Preparedness Plan 2008
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Pacific Power Seismic Preparedness Update
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
Cybersecurity Special Public Meeting/Commission Workshop for Natural Gas Utilities September 27, 2018.
2007 Hurricane Season Preparations
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
2007 Hurricane Season Preparedness Briefing
Rebuilding Puerto Rico after Maria
Presentation transcript:

2008 Hurricane Season Preparations Florida Public Utilities Company May 1,2008

Florida Public Utilities Company Description Small Investor Owned Electric Utility Approximately 28,000 Customers Small Service Territory Northeast Florida Division - Amelia Island and Fernandina Beach Northwest Florida Division – Parts of Jackson, Calhoun and Liberty Counties

Hurricane Season Preparations Vegetation Management – Focus on Main Feeders and Areas with Reliability Issues Pole Replacements – Focus on Replacements of Deteriorated Poles Beach Inspections – Replaced Deteriorated Hardware along the Beach. Review Emergency Procedures Substation Inspections and Corrections

Hurricane Season Preparations Inventory Needs Evaluated to Ensure Adequate Supplies Continued Involvement with Mutual Assistance Groups Additional Manpower And Resources have been identified GIS and SCADA System Completed In Northwest Florida Division GIS Completed In Northeast Florida Division

Storm Hardening Initiatives Issues included in Docket #070304-EI and Docket #070300-EI were resolved on April 22, 2008 Initiatives for Vegetation Management and Transmission Storm Hardening will be revised based on the final decisions. Implementation of other initiatives will begin during the second or third quarter of 2008.

Storm Hardening Initiatives Pole Inspections – Visual Inspections of approximately 2800 poles completed in 2007. Detailed inspections in accordance with Storm Plan to begin in July 2008. Transmission Inspections – Visual Inspections Completed in 2007. Climbing Inspections in accordance with Storm Plan to begin during 2008. Vegetation Management – Emphasis on moving to a 3/6 year cycle with existing crews. Areas with reliability issues will be addressed. Joint Use Audits will begin during 2008 with poles loading issues identified. Company Personnel will be located at EOC’s in order to enhance communications with local governments. Forensics Data Collections procedure in being completed with contractor to be identified prior to September 2008.

Storm Hardening Projects During 2007, two projects were completed that included EWL standards in the design. During 2008, two projects to include the EWL standards will be completed. These include approximately 82 poles that provide service to critical infrastructure (Hospital and Sewer Treatment Plant)

Conclusion FPUC is adequately prepared for the 2008 Hurricane Season Decisions from recent Dockets provide the ability for the FPUC to address the initiatives and projects in an effective and productive manner. Questions???