MODELLING THE CRUDE OIL STORAGE MANAGEMENT

Slides:



Advertisements
Similar presentations
Status of bitumen supplies
Advertisements

Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Capacity Planning ABI301.
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Strategic Decisions (Part II)
Part IV MANUFACTURING SYSTEMS
Book 2: Chapter 2 Economic Planning for New Pipelines.
MBA (Trimester) Term V Module Title : Project Finance and Management
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
INDUSTRIAL & SYSTEMS ENGINEERING
Operations Management
Course Objectives Define Capacity
EKT214 - ANALOG ELECTRONIC CIRCUIT II
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
Systems Engineering of Software-Intensive Systems 1.
Water Storage, Transport & Distribution. Water Storage, Transport and Distribution WATSAN M15 ERU 2 Contents 1.Needs 2.Crucial principles 3.Storage 4.Transport.
Dr. Fatma Ashour. After the preliminary oil-field refining, the crude oil is transported to the refinery. The most common methods of transportation are.
Production planning and control is the organization and planning of the manufacturing process. It co-ordinates supply and movement of materials and labor,
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
Lecture 1 Water Distribution Systems
Transportation—Managing the Flow of the Supply Chain Lecture 8.
ΕΦΑΡΜΟΓΕΣ ΕΠΙΧΕΙΡΗΣΙΑΚΗΣ ΕΡΕΥΝΑΣ Ενότητα 2: Scheduling of Loading and Unloading of Crude oil in a Refinery Γεώργιος Κ.Δ. Σαχαρίδης Τμήμα Μηχανολόγων Μηχανικών.
California Issues - Expanded Use of Ethanol and Alkylates LLNL Workshop Oakland, Ca April 10-11, 2001 Gordon Schremp California Energy Commission.
Supply and Demand. Law of Demand The rule people will buy more at lower prices than at higher prices if all other factors are constant You must be able,
Chapter 2: The Economizing Problem
SENIOR DESIGN PROJECT- 2 MARINE SHIP “OIL TANKER” MECHATRONICS SPECIALIZATION FINAL EXTERNAL PRESENTATION PREPARED BY:- 1)SAUD AHMED NIZAMI(4558) 2)SAQIB.
1 8. A DVANCED R ESOURCE M ANAGEMENT Objective: To develop new perspectives of space as resources, that will enable it to be more readily integrated with.
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
SUBJECT CODE NAME OF SUBJECT TOPIC :::::: FLUID POWER ENGINEERING CENTRIFUGAL PUMP Parul Institute of Engineering & Technology.
Ethanol Plants What affect are they having on our existing infrastructure? Ethanol Plants What affect are they having on our existing infrastructure?
Introduction Transportation is necessary to:
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
PROCESS COSTING CHAPTER - 1. Chapter outcomes  Meaning and nature of process costing  Application of process costing  Fundamental principles of process.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Learning Curves Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
The main function of a business is to produce goods and services which are desired by their customers.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
LINEAR PROGRAMMING. Linear Programming Linear programming is a mathematical technique. This technique is applied for choosing the best alternative from.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
California Refinery Overview and Fuel Use Transportation Fuel Supply Reliability Due to Reduced Natural Gas Availability San Pedro, CA June 17, 2016 Gordon.
Production Planning and control – ME 1009 Unit 1 Introduction.
Simulation Modeling.
ENTREPRENEURSHIP DEVELOPMENT
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
GENESYS Redevelopment Strawman Proposal
For Products and Services
Lorenzo Ros Mª Victoria de la Fuente Norina Szander
Cellular Layouts Cellular Production Group Technology
PRESENTATION OF MONTENEGRO
CHAPTER 5 TECHNICAL ANALYSIS.
Transportation.
Graduation Project (II): Operations Improvement at Mhanna Factory
Flexible Forward Contracts for Renewable Energy Generators
2nd JANAF’s Conference Challenges of crude oil diversification,
Transportation.
Manufacturing system design (MSD)
Computer Integrated Manufacturing ( CIM). Chapter One 1.1 Introduction 1.2 Types of Manufacturing 1.3 CIM Hardware and CIM Software 1.4 Nature and Role.
LNG terminals of tomorrow
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
Smita Vijayakumar Qian Zhu Gagan Agrawal
MANUFACTURING SYSTEMS
M.V. de la Fuente; D. Ros; M.A. Ferrrer; J. Suardíaz;
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
A Business Simulation for Corporate Finance Courses
Module 4: Storage and Dispensing Locations
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

MODELLING THE CRUDE OIL STORAGE MANAGEMENT SOR 2015 Lorenzo Ros McDonnell María Victoria de la Fuente Aragón

Frame of the work presented The supply of raw materials needed to develop the refining activity is performed by tankers or pipelines. These are the two basic means by which Spain get crude oil from producing countries. Crude oil storage is done in specially designed tanks. The importance of this operation is critical for refining, it must properly operate with the storage capacity of these facilities, in order to enable supply of charge to distillation units, to fulfill the safety stock, and to optimize the storage capacity, ensuring the raw material supply and a proper stock rotation, to avoid the freezing of oil for long periods time. Therefore, the refinery tries to meet the market needs thorough a comprehensive planning and a proper stock management. The operator of the system does this process manually, with possible errors associated to the human factor.

Diagram of the crude oil storage system in a Spanish refinery

Storage elements involved Storage Tanks (Ti): there are 20 floating roof tanks with a usable storage capacity of 92,477 m3/tank (total usable volume of 1,849,540 m3) Pipeline: allows pumping crude to facilities located within the country. It has a large capacity (12,000-25,000 ton/day). In this study it has been considered a variable pumping stream S= [500 - 1000] m3/h. Distillation unit (CDU): where the first stage of refining crude oil occurs. In the present work, the distillation unit loads crude from the storage tanks fed from the oil terminal, which receives the discharge of the tanker. Usually it works with a variable load stream S = [500-750] m3/h.

Element & Constraint Strategic storage - Ci - (CORES): Compulsory volume of crude oil, as strategic stock. The strategic quantity of oil, according to Spanish Law 34/1998 and European Directive 2009/119/EC, will be at least equal to 90 days of the country consumption. This situation forces the refinery having immobilized 5 tanks from the set of 20 tanks, with a approximate capacity of 500,000 m3. The short-term oil refinery-scheduling problem is one of the most challenging problems in operational research due to the complexity of the refinery operations and the corresponding process models (Pinto et al, 2000).

Issues to be considered: Safety Stock: Volume which keeps the distillation unit operative for almost 45 days. (approx. 810.000m3), reaching a volume level near this amount, the refinery should be planned future purchases of crude oil. Product mix: The refinery has established a group of crudes for purchase, so that there are no problems regarding their possible blending All Ti tanks are eligible for loading and supplying to CDU and Pipeline, and the movement of crude among them is allowed. Ci tanks are immobilized (strategic stock) and will not participate in the loading/unloading operations. Only once a year, the movement of crude among Ci and Ti is made for maintaining them and to avoid problems with raw material in Ci.

input data for the study of the storage Ti tanks levels

Simulation results of crude oil storage until the arrival In the presented study case in the paper, it is scheduled a tanker unloading: Tanker GENMAR SPYRIDON, ready to download 94,000 m3 of crude oil type "Castilla". Then, the initial conditions of the storage system is fixed as shown in Table 1. After that, we have study the evolution of the stock in the set of Ti and Ci tanks, results obtained from the simulation of the modelled system. We have established appropriate time sequences, in this case has set a time-window of 24h (that includes the full unloading of the tanker - approx. 12h).

Simulated evolution of crude oil stocks in the Spanish refinery

Conclusions As a real improvement, and in the way of optimizing the loading/ unloading process of tanks, was proposed a division of the set of 20 tanks into three groups: Group 1: CORES (Ci) tanks for the storage of strategic reserves. Group 2: storage tanks for pumping to pipeline, P1- P7 (seven tanks) Group 3: storage tanks for loading the distillation unit (CDU), T1-T8 (eight tanks). “All storage tanks can receive load from tankers, and crude oil movements are permitted among all storage tanks”. This proposal seems to reduce the operational flexibility of the system (facilities), because each tank will se assigned to exclusive uses, but the benefits, which will be achieved in the short-medium term of the system operation, are: Simplicity in facility circuits, with greater clarity in the system operation. Reduction of set-up times, operation and maintenance. Higher control and safer facilities (system).