Final CALICE OsC meeting: Status and summary of project

Slides:



Advertisements
Similar presentations
R Frey SiD at SLAC 16Dec DBD Planning: ECal LOI section still a good starting point Guiding principles based on optimizing physics performance constrained.
Advertisements

23 Jul 2008Paul Dauncey1 TPAC 1.1 vs TPAC2.0 vs TPAC2.1 Paul Dauncey.
UK CALICE plans Birmingham, Cambridge, Imperial, Manchester,RAL,RHUL,UCL.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Snowmass 25 AugustMark Thomson 1 PFA Progress and Priorities Mark Thomson (for Steve Magill, Felix Sefkow, Mark Thomson and Graham Wilson)  Progress at.
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
David Ward/Nigel WatsonCalice UK, 10-Nov-2004 Future Simulation Scope  The deliverables after 3 years will include 1.Published analysis of electron test.
7 Sept 2007Paul Dauncey - Calorimetry1 UK Opportunities in SiD Calorimetry Paul Dauncey Imperial College London.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
M. Tyndel, SPIDER proposal 1Aug 7 th, phone Schedule and resources  SPIDER has been streamlined to cover:  1) 1 submission ‘small pixel’ ISIS (vertexing/tracking.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Introduction Multi-jets final states are of major interest for the LC Physics EFlow : An essential test to design the foreseen detector Software (Algorithms)
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
16 Sep 2009Paul Dauncey1 DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups: Birmingham, Bristol, Imperial, Oxford, RAL.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
18 Jan 2009Paul Dauncey1 Guesswork on the future MAPS programme Paul Dauncey.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Calice-UK, Cambridge, 09-Sep-2005Nigel Watson / Birmingham Planning for Simulation and Physics  Review plans as per proposal  Evaluate scope/schedule/effort.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Sohail Amjad, Roman Pöschl LAL Orsay Guard ring studies for SiW Ecal of ILD CALICE Collaboration Meeting Cambridge/UK Sept
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Marcel Stanitzki Rutherford Appleton Laboratory
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
14.4. Readout systems for innovative calorimeters
CALICE Oversight Committee
Test Beam Request for the Semi-Digital Hadronic Calorimeter
WBS 1.03 Readout Systems Scope, Cost and Schedule
SiD Calorimeter R&D Collaboration
PROJECT LIFE CYCLE AND EFFORT ESTIMATION
CALICE News The 2007 beam tests have started!
Status of Ecal(s) for ILD
(My personal) CALICE Report
ECAL project in the future 2-3 years
C. de La Taille IN2P3/LAL Orsay
CALICE/EUDET Electronics in 2007
ILD Optimisation: towards 2012 University of Cambridge
Vishnu V. Zutshi For the NICADD team.
Post CALICE thoughts Paul Dauncey 28 Apr 2004 Paul Dauncey.
Technical Board – DCAL Software
DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups:
CALICE: News Since May Paul Dauncey Three main items: Beam test status
CALICE: Major Items Since September
A High Intensity Neutrino Oscillation Facility in Europe
CALICE: Options for the future
Proposal Organisation
Calice Tile-HCal and Tail-catcher/Muon Tracker
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Paul Dauncey Imperial College London
Upcoming CALICE meetings
Presentation transcript:

Final CALICE OsC meeting: Status and summary of project Paul Dauncey 29 Sep 2008 Paul Dauncey

Brief update since report Completed Sept FNAL run with Sc-W ECAL Integration with AHCAL went very smoothly ~ 107 events Should allow direct comparison with Si-W ECAL Next few journal papers getting closer Si-W ECAL first analysis paper now in collaboration-wide review AHCAL hardware paper now in collaboration internal review Second round sensor back from fabrication at RAL Gluing and wirebonding starting today 29 Sep 2008 Paul Dauncey

UK WP status: where we are For each WP, will give some idea of What we have achieved and hope to achieve in the remaining six months What we had to cut short What we are trying to carry forward Usual progress of a project is Design, do, document Termination of the grant in the final year has had, and will have, a major impact on the last Direct cutting of posts reduced the RA effort significantly People are looking for alternatives Significant risk of not producing conference talks and papers before the end of the grant UK slower to get the basic science payback for the investment 29 Sep 2008 Paul Dauncey

WP1: Beam tests Regarded as extremely successful More data than we expected ~108 events for the Si-W ECAL and the AHCAL UK provided significant roles Leadership of analysis work Leadership and delivery of DAQ Run coordinator for CERN Analysis of data, including primary author of first CALICE paper Termination has resulted in Possible loss of leadership in analysis Restricted travel, and hence much reduced efficiency, for DAQ support Reduced analysis effort; now concentrating on hadronic interactions in ECAL This work will not be supported by any of the future proposals Any non-academic effort will disappear by March at the latest Academic effort restricted to analysis coordination and DAQ support as “good citizens” but with no travel funding 29 Sep 2008 Paul Dauncey

WP2: DAQ Large amount of progress UK is dominating this effort Working versions of full DAQ hardware chain EUDET collaboration gives testbed for concepts/hardware UK is dominating this effort No other groups within Europe at this level; possibly true worldwide Will complete EUDET DAQ hardware system by end of March EUDET funded RA will continue DAQ software effort after this Termination has resulted in Significant loss of RA effort for software and testing Loss of some tasks, e.g. ECAL ASIC testing Lack of funds to procure enough components for EUDET tests, pushing costs onto collaborators and giving the UK a reputation as an unreliable partner EUDET funding has mitigated this to some extent DAQ proposal submitted to continue aspects of this work Would provide funding to allow UK to deliver DAQ for technical prototypes UK would remain leader in LC (and other) DAQ studies 29 Sep 2008 Paul Dauncey

WP3: MAPS Gone some distance towards establishing digital ECAL as a technique First sensor designed, fabricated and tested Digital ECAL performance estimated based on results Second small sensor designed and fabricated Next step is to study real EM showers at high granularity Use second sensor in DESY beam test, hopefully early 2009 Do statistical study of hit densities with various converter thicknesses Termination has resulted in Significant loss of RA testing and simulation effort Reduction of scope from large second sensor to small one Major goal of fully reconstructing EM showers not possible Proof-of-principle cannot now be done with available sensors Sensor proposal submitted which includes completion of these studies Significant part is to design a large-size sensor and assemble an ECAL stack Would allow direct resolution measurement of EM showers Existence proof that digital ECAL is feasible 29 Sep 2008 Paul Dauncey

WP4: Mechanics Established techniques for large scale module assembly Glue properties and QA Module assembly using scalable methods Will complete the current studies by the end of March Bring project to a sensible conclusion Document what has been achieved Termination has resulted in Reduction in effort due to people leaving Dropping of studies of the ECAL end-of-module mechanics Dropping of any further thermal flow studies Dropping any significant studies on ECAL endcap design This work will not be supported by any of the future proposals Will continue within CALICE/EUDET but outside of the UK Loss of UK leadership following investment 29 Sep 2008 Paul Dauncey

WP5: Physics studies UK has made major contribution Best performing PFA worldwide; benchmark for evaluating all others Optimisation studies for ILC detector concepts Physics sensitivity studies Major goal by end of grant is detector concept LoIs LoIs are to be submitted in March 2009 UK will provide sections to both ILD (DAQ, PFA, physics studies) and SiD (MAPS, PFA) Termination has resulted in Reduced RA effort throughout all aspects of this work Major impact on morale as seen to be “least generic” area of work Only students, RAL and academic effort remaining Proposal submitted to continue PFA work Already approved by PPRP before ILC cuts but stalled If not approved, only academic effort on PFA will continue, at some low level 29 Sep 2008 Paul Dauncey