Gerald I. Forstater, PE, PSP, CET and Daniel H. Broughton, EIT

Slides:



Advertisements
Similar presentations
1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
Advertisements

 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
Basic Fire & Life Safety for Radiation Safety Professionals Robert Emery, DrPH, CHP, CIH, CSP, RBP, CHMM, CPP, ARM Vice President for Safety, Health, Environment,
© Siemens Industry, Inc Confidential / Drive Your Business Forward Ignite the Power of New Products and Partnerships Siemens Fire Partner Summit.
Site Planning and Layout  In the design phase of a facility, fire protection requirements are considered in the site layout  Water supply, traffic and.
AUTOMATIC SPRINKLERS.
Copyright © Center for Systems Security and Information Assurance Lesson Seven Physical Security.
Conversion of energy from one form to another Creating useful energy for a certain task Can use any type of energy.
3-1 NFIRS 3 Structure Fire Module. 3-2 ObjectivesObjectives The participants will be able to: –describe when the Structure Fire Module is to be used.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
Fire Protection Engineering and Building Code Analysis Presented By: Harold D. Hicks P.E. President Use space bar or left mouse button to move through.
Physical Security Chapter 9.
Hazard - Inadequate Wiring
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
OVERVIEW COMBUSTIBLE DUST QUIZ: Management Level Produced under OSHA Susan Harwood Grant SH
Control Rooms  Serve as operations centers for the control and monitoring of a service or process  Flight control rooms  Power generation control rooms.
RP-2000 Series Deluge & Agent Releasing Panels
Technology in Architecture Lecture 12 Electrical Equipment Electrical Power Management Fire Protection Systems Lecture 12 Electrical Equipment Electrical.
Patrick Thornton, SNS/FPE June 9, 2008
CXS490 Carbon Dioxide Systems
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
1 CXS490 - Pre-Engineered Fire Protection Systems Off-Road Vehicle Systems.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Fire Protection Systems Chapter 6. Fire Protection Systems Most of the time you will work with an electrical engineer or fire-protection designer to coordinate.
Air Blast Circuit Breaker
Electricity Notes 5 Electric Power – the rate at which _______________________ the rate at which _____________________ is converted into another form of.
What is Mechatronics? The portmanteau "Mechatronics" was first coined by Mr. Tetsuro Mori, a senior engineer of the Japanese company Yaskawa, in 1969.
Chapter 6 ID 234 Building Codes Fire Suppression.
1 © 2015 Eaton. All Rights Reserved.. Suggestion on How to Use Industry Trainers are encouraged to use this material in their sessions Download the presentation.
Sprinkler Loads on Trusses
Transducers – changing one form of energy to another Piezoelectric Microphone Ultrasound Motors/Generators Switches Solenoids Relays EAPs Overview.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Technology in Architecture Lecture 18 Fire & Life Safety Fire Protection Systems Lecture 18 Fire & Life Safety Fire Protection Systems.
Chapter 6 ID 234 Building Codes Fire Suppression.
  The traditional molded-case circuit breaker uses electromechanical (thermal magnetic) trip units that may be fixed or interchangeable.  An MCCB provides.
Water Mist Systems Chapter 6. Objectives Evaluate water mist as a potential halon replacement Discuss the applications for water mist systems Compare.
Louisiana AFAA Quarterly Meeting State Fire Marshal Questions
Fire Extinguishers & Basic Safety
PROTECTION AGAINST INDIRECT CONTACT
“Portable Fire Extinguishers Safety”
FIRE PROTECTION & SECURITY in ELI Beamlines
Electric & Mechanic work
2011+ NEC Article Arc Energy Reduction. Where the highest continuous current trip setting for which the actual overcurrent device installed.
Technology in Architecture
NICET Fire Alarm Tech Level 1 Practice Test
GOVERNMENT ENGINEERING COLLEGE DAHOD
Energy Storage System Guide for Compliance with Safety Codes and Standards Gene Eckhart November 2, 2016.
Shipboard Electrical Distribution
ID 234 Building Codes Fall 2008 Fire Suppression Chapter 5.
Fire Alarm Systems for Emergency Operations of Elevators
AUTOMATIC SPRINKLERS.
“ Highlighting the risks and challenges presented by modern data-center cooling systems in fire detection and suppression applications. “ Dave Boyack Sales.
Outlet Branch Circuit Arc Fault Circuit Interrupter (OBC AFCI)
ELECTRICAL POWER-II Electrical engineering sixth semester
Effect of Earthquake on Fire Protection Systems
EET 323 – Electrical System Design Lecture 4: Wiring Devices
Overcurrent Protection— Fuses and Circuit Breakers
NFIRS 3 Structure Fire Module
EE-4TH SEMESTER ESTIMATING AND COSTING.
Safety Meeting Topics Standby Generator Safety
Click anywhere to get started…
Electrical components and systems
0 Air Blast Circuit Breaker under the guidance of:- Presented By:- Mr. B.R.Reddy Anuj Kumar Pandey EN-3 rd year Roll No Unrestricted.
Substation Equipment's
2019 ECR Presentation “HOT SKIN”
Presentation transcript:

Gerald I. Forstater, PE, PSP, CET and Daniel H. Broughton, EIT Fire Protection of mission critical 13kv Redundant Switchgear in buildings Gerald I. Forstater, PE, PSP, CET and Daniel H. Broughton, EIT

Defining the Problem Dual redundant switchgear 12.47 kV each side 1600 amps per phase – 4800 amps total Enclosed in building Business continuity

Codes, standards & References IBC – International Building Code, 2012 IFC – International Fire Code, 2012 NFPA – Pamphlet 13 Automatic Sprinkler Systems, 2010 NFPA – 2001 Non-Halogenated Gas Systems, 2010 NEC – 70 Electrical Code, 2010 NFPA – 72 Fire Alarm and Signaling Systems, 2010

NSA's Data Center Electrical Problems Aren't That Shocking By Tekla Perry Posted 16 Oct 2013 | 18:01 GMT   Last week, the Wall Street Journal reported that arc-fault failures – electrical problems that exceed the protective capabilities of circuit breakers and cause metal to melt and go flying – are delaying completion of the NSA’s controversial new Utah data-storage center. "A circuit breaker tries to open up, but the amperage is higher than it can handle, so when the contacts open it doesn’t break the circuit. Instead, you have an arc that is moving around between the contacts; it has huge magnetic forces to it, and it can’t be easily extinguished. You end up with molten metal flying around which is extremely dangerous."

arcing

Potential Heat Release Rates Three phase Fault – 20 MW One phase fault – 6.67 MW

Transformer Failure

Internal Arc

BUILDING FIRE PROTECTION ANALYSIS

BUILDING FIRE detection Pre-action actuation ANALYSIS

Detector Response Time Anticipated detector activation sequence upon fault: Linear heat detector Incipient smoke Spot Heat detector Smoke detector Sprinkler head element Many additional variables Enclosure gasketing Rain guards Ceiling slope Ventilation Calculations based on heat from fire not electrical

NFPA 2001 over 480 volts Covers the use of clean agent for Class C fires under 480 Over 480 volts subject to testing if equipment is to stay energized during and after discharge Recommends the minimum design concentration for Class C fires be 1.35 times the Class A concentration Class A: 4.5% concentration for most products Class C: 6% Other considerations Low leakage building Pressure testing Redundant agent supply No occupancy during discharge Post discharge purge

AHJ’s, Testing & Acceptance Conversation with Mr. Rivers of 3M about NOVEC Multiple tests at 6% concentration Madrid, Spain South America No formal test data available AHJ must accept these international tests to proceed with design Physical testing of a similar design at same concentration needed to confirm design

Final recommendations Suppression Sprinklers to protect building Pre-action with double interlock Detection Incipient smoke detection Linear heat detection Ion/photo smoke detectors Spot/compensated heat detectors Cross zoning

questions PROFESSIONAL SYSTEMS ENGINEERING, LLC 30 YEARS + STRATEGY + SPECIFICATIONS + TECHNOLOGY

Next study phase Temperature Set Points Real world Investigation Actual Test

THANK YOU! PROFESSIONAL SYSTEMS ENGINEERING, LLC 30 YEARS + STRATEGY + SPECIFICATIONS + TECHNOLOGY