Realising the SMP 1. Safe Machine Parameters Overview

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Code as Communication Programming Studio Spring 2015.
Legacy Remote I/O Upgrade to Ethernet
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
Technion – Israel Institute of Technology Department of Electrical Engineering High Speed Digital Systems Lab Spring 2009.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Test and Monitor with the CIBT.
Green Emotion WP 4 – Grid Evolution, Task 1 - Functional and Design Requirements of Infrastructure Presented by: Philip LeGoy ESB ecars 3rd Stakeholder.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Control Systems Design Part: FS Slovak University of Technology Faculty of Material Science and Technology in Trnava 2007.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
B. Todd et al. 25 th August 2009 Observations Since v1.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Signal Integrity Electro-Magnetic Compatibility Dependability.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
The Engineering Design Process
Beam Interlock System Dependability Study RSWG – 31 st January 2005.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
BT AB/CO/MI 18 th September 2007 Safe Machine Parameters Chassis.
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
FGClite Feedback from BE-CO & SUWG(Smooth Upgrades)
Combining safety and conventional interfaces for interlock PLCs
0v1.
A monitoring system for the beam-based feedbacks in the LHC
LBDS TSU & AS-I failure report (Sept. 2016)
Procurement, Measurement and Installation of 2 Octupoles for ATF
Dependability Requirements of the LBDS and their Design Implications
Realising the SMP 1. Safe Machine Parameters Overview
Installation of an Instrument on a CERN machine
Overview of CERN BIS and Communication Hardware
Injectors BLM system: PS Ring installation at EYETS
Status of the Beam Phase and Intensity Monitor for LHCb
The ELENA BPM System. Status and Plans.
Not a BIS expert, not even working on BIS but I’m going to try to present it as completely as possible.
Introduction SMP = Safe Machine Parameters
the CERN Electrical network protection system
Safe mode transmission
Commissioning and Testing the LHC Beam Interlock System
0v1.
Updating Capital Asset Records
Introduction Example: model train controller..
Maintaining Data Integrity in Programmable Logic in Atmospheric Environments through Error Detection Joel Seely Technical Marketing Manager Military &
IOT (Internet Of Things) Solutions For OEE & OPE for Phase - III
CONSOLIDATION CPS-BL SYSTEM
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
1v1.
Report from the LHC BLM System Audit1
Operation of Target Safety System (TSS)
Presentation transcript:

Realising the SMP 1. Safe Machine Parameters Overview Basics Piggy-Back on GMT 2. Evolution to the Proposal Basic Architecture Enhanced Architecture 3. Electrical Architecture Failure Modes, Effects and Criticality Analysis (FMECA) Electro-Magnetic Compatibility Signal Integrity Safe Machine Parameters System

Realising the SMP 1. Safe Machine Parameters Overview Basics Piggy-Back on GMT 2. Evolution to the Proposal Basic Architecture Enhanced Architecture 3. Electrical Architecture Failure Modes, Effects and Criticality Analysis (FMECA) Electro-Magnetic Compatibility Signal Integrity Safe Machine Parameters System

Safe Machine Parameters Several Safety Critical flags and values are needed around the LHC (see Bruno) -Initially a dedicated high-dependability communications system was proposed -it became clear that this would be a huge system having lots of infrastructure to maintain -finally it was decided to send these signals through the CERN General Machine Timing (GMT) The signals are generated externally and pushed into the GMT generator (CTG) … They are queued… They are sent… They are received all around the machine… (in a CTRV or CTRP) Safe Machine Parameters System

Good motivation for GMT Comms Errors Data given to GMT could be wrong GMT could corrupt data Front-End could corrupt data Safe Machine Parameters System

Good motivation for GMT Comms Errors Data given to GMT could be wrong Make a dependable source Bit Error Rate of GMT can be calculated Mean Time to Fail estimated Failure Mode estimated GMT could corrupt data Front-End could corrupt data Read-back and compare to source Safe Machine Parameters System

Realising the SMP 1. Safe Machine Parameters Overview Basics Piggy-Back on GMT 2. Evolution to the Proposal Basic Architecture Enhanced Architecture 3. Electrical Architecture Failure Modes, Effects and Criticality Analysis (FMECA) Electro-Magnetic Compatibility Signal Integrity Safe Machine Parameters System

The most fundamental SMP… Safe Machine Parameters System

The first step is to accommodate multiple data sources to increase dependability… Safe Machine Parameters System

… simplify the critical part… Safe Machine Parameters System

… duplicate the critical part… Safe Machine Parameters System

… cross-check the critical part… Safe Machine Parameters System

… allow the flags to drive Beam Interlock equipment… Safe Machine Parameters System

… verify that the machine parameters transmitted match those received… Safe Machine Parameters System

Safe Machine Parameters Several Safety Critical flags and values are needed around the LHC A modular system can be designed -lots of work, can be split -can come online piece by piece in order of importance -each piece can be tested independantly Let’s see about Bruno’s proposal: Safe Machine Parameters System

Realising the SMP 1. Safe Machine Parameters Overview Basics Piggy-Back on GMT 2. Evolution to the Proposal Basic Architecture Enhanced Architecture 3. Electrical Architecture Failure Modes, Effects and Criticality Analysis (FMECA) Electro-Magnetic Compatibility Signal Integrity Safe Machine Parameters System

Phase I Architecture Safe Machine Parameters System

Phase II Architecture Safe Machine Parameters System

Phase III Architecture Safe Machine Parameters System

Discussion Phase I – Deadline October / November 2007 Specify I/O of Chassis Specify Internal Layout of Chassis Specify Electrical Level Architecture for Whole Chassis Build simple Prototype based in the LAB Phase II – Deadline February / March 2008 Expand Prototype to include redundancy Develop Fail-safe, Monitoring and Test Mode in the LAB and SPS Phase III – Deadline Summer 2008 Include all Safety Aspects Include all FESA type Monitoring In the LAB, SPS and when completed roll out to LHC Safe Machine Parameters System

Discussion Several PCBs will be needed rely on existing technology and ideas. Don’t reinvent the wheel! See 1. Diagnosis and Monitoring needed Test modes needed System will be in one location, no need for remote update System will be built twice (plus spares) manufacturability NOT hugely critical CPLD / FPGA technology = good VHDL/Schematic Entry = good Displays / debugging access = good Elegant design, robust and ergonomic = good PCAD = good Design office = not so good 12b. Documentation is very very good. Safe Machine Parameters System

Discussion Your mission, should you choose to accept, is to participate in the realisation of the safe machine parameters system Ambitious, I know BUT… I know you guys want a challenge First thing is to digest the documentation Bruno has… It’s all preliminary 2 weeks: chassis sketches and electrical architectures Leading to several projects  Safe Machine Parameters System

FIN Safe Machine Parameters System