4th Assessment of Progress Against the GEOSS 2015 Strategic Targets

Slides:



Advertisements
Similar presentations
Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
Advertisements

Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Remote Sensing at the service of Natural Disasters Warning: the Contribution of the Supersites Concept Professor Stuart Marsh Co-Chair GEO Institutions.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014.
GEO Strategic Plan : Implementing GEOSS
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Session 8. GEOSS requirements, functions, architecture Session Feedback Presenter: Max Craglia.
2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
ID-01 report 17 September 2014 IDIB meeting, Enschede Michel Schouppe
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
April_2010 Partnering initiatives at country level Proposed partnering process to build a national stop tuberculosis (TB) partnership.
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
Project Management Learning Program 7-18 May 2012, Mekong Institute, Khon Kaen, Thailand Writing Project Report Multi-Purpose Reporting.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
© GEO Secretariat GEO Work Plan Overview Document 20 GEO-VIII Plenary November 2011.
Introducing the Science and Technology Roadmap 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
Science and Technology Roadmap - current progress 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
GEO’s Need for Non-space Based Observations and the GEO Vision for GD6 Osamu Ochiai GEO Secretariat November 10 Mexico City.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Reporting, Monitoring and Evaluation
Foundational Task prioritization: Outcomes of PB meeting
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
The Group on Earth Observation The water related activities Vanessa Aellen Technical Expert for Water 16 may 2017, Tuscaloosa.
5.2 Monitoring and Evaluation
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
Subgroup 2 - Foundational Tasks structure review and recommendations for the WP Francisco Chavez (POGO, lead), Ivan Petiteville (CEOS), David.
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Pics from trips Alan Pears AM
Overview of GEOSS Data Sharing Principles and Implementation GEO-XIII Plenary Side Event Towards Open Earth Observation Data Policies Wenbo Chu GEO.
Interreg V-A Romania-Bulgaria Programme
World Meteorological Organization
The GEO-6 Matrix Drafting Approach
Programme Board 6th Meeting May 2017 Craig Larlee
Capacity building coordination Mark Noort HCP International Andiswa Mlisa GEO secretariat GEO WP Symposium Geneva, Switzerland May 4th, 2016.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Session Plan Objectives & means of engagement – CBC, PSC, IDI
GEO Programme Board Report
GEO Capacity Building Coordination Capacity Building in GEO WP 2017 – 2019 Capacity Building Coordination TT GEO Programme Board Meeting 23 – 24 May.
2017 WPS Break-Out Session: Addressing Gaps
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Return to First Principles
Community Portal Interactions with GEOSS GEO-XII Plenary November 9, 2015 Ken McDonald/NOAA
GEOSS Community Portal Recommendations AIP-7 Results Session, GEO Plenary XI November 12, 2014 Ken McDonald/NOAA
UN-GGIM:Africa Meeting Objectives UN-GGIM:Africa 2018
Strategic Plan Implementation July 18, 2018
Key components of an NSDS
Summative Evaluation for GEOSS Implementation
Project Manager, EA, the REC
Presentation transcript:

4th Assessment of Progress Against the GEOSS 2015 Strategic Targets 4th Assessment of Progress Against the GEOSS 2015 Strategic Targets (Document 5) Ivan B. DeLoatch (US) Co-chair, Infrastructure Implementation Board (IIB) On behalf of IDIB, IIB, SBIB GEO-XII Plenary November 11, 2015 Mexico City, Mexico Ivan DeLoatch (US) Co-chair of the Infrastructure Implementation Board (IIB)

GEOSS Target Assessment Assessment Rationale & Process Assessment Results Lessons Learned and Recommendations Summary Presentation outline 2

Assessment Methodology In a qualitative Assessment Process, all 3 Boards used: Query tool and reports from Task Sheets, where available Presentations & discussions at GEO Work Plan Symposium Institutions & Development Invited presentations during Board Meetings Contributing activities e.g. participation in the GEO BON network, Sustainable Development Goals, etc Workshops and scientific sessions at conferences Societal Benefits Infrastructure Workshops on GEOSS future Products & Architecture Independent assessment of GCI Survey of GEOSS Data CORE awareness Testing of data access for Essential Climate Variables 3

Refer to GEO-XI Document 5 for details Assessment Rationale 1 Strategic Target 2 Demonstrated Outcomes 3 Workplan Task As in the previous years we are using the same assessment rationale for Same Structure Evolving Process Learning by doing I will not go through each of the ratings for each of the strategic targets instead will provide an overall view on the next slide Note this is part I of the Target Assessment: ftp://ftp.earthobservations.org/GEO-XII/GEO-XII_05_Summary%20Assessment%20of%20Progress%20%E2%80%93%20Targets%20and%20Tasks.pdf Not expected to be achieved without significant actions/intervention At risk of not being achieved without additional actions/intervention Expected to be achieved. Some actions/intervention may be required Refer to GEO-XI Document 5 for details

Overall Trends & Results Annual 2 4 5 8 Progress 2012-2015 Strategic Target Areas 2015 Strategic { +3 Green in 2015 Targets Positive improvement has been made over the past 4 years Over the past year 3 additional strategic targets improved On the next slide I will discuss some of the challenges that limited success for the 5 remaining strategic targets and recommendations to support future success Note this is a rollup of Part I & II of the Assessment: ftp://ftp.earthobservations.org/GEO-XII/GEO-XII_05_Summary%20Assessment%20of%20Progress%20%E2%80%93%20Targets%20and%20Tasks.pdf

Lessons Learned & Recommendations 1 2 3 4 Scope & Complexity Prioritization Dependencies & Coordination Resources Scope: Appropriately Scope Objectives recognizing scale, complexity and ability to resource Prioritize and Align Work Plan Task with a focus on those task that directly contribute to demonstrating the Strategic Objectives Dependencies: Develop a Coordination Mechanism to support Dependencies Ensure alignment and commitment for resources to ensure success of strategic objectives Develop annual measurements that facilitate prioritization and monitoring of objectives The new strategic plan provides an improved structure that align with these lessons learned & Recommendations 5 Performance Measures

Summary The assessment process and progress improved over time based on more information, better analysis tools and a better understanding of the review criteria The colour coding approach had mixed results: A Target doing better (or worse) may be the result of 1) actual improvements, 2) the assessment being more complete and better informed, or 3) both factors Many Tasks reported delays and incomplete activities due to a lack of funding and time commitments from experts The lessons learned and key recommendations were addressed in the GEO Strategic Plan 2016-2025 and the 2016 Transitional Work Programme as the result of a successful coordination effort among the IPWG, the Boards, the Monitoring and Evaluation Working Group and the Secretariat during 2014-2015 period. GEO community will work with the Program Board to develop a more effective assessment and implementation processes.

Thanks for Your Attention!