WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)

Slides:



Advertisements
Similar presentations
SENS-IT SENS-IT Small Electronic Network Sensor Integrity Tool Development of a Low-Cost Permanently Installed Microelectronic Wireless Monitoring System.
Advertisements

EQUIPMENT VALIDATION.
Who does what and when? Mary Rowlatt MDR Partners.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
DISTRIBUTED CRYOGENIC COOLING WITH MINIATURIZED FLUID CIRCUITS Steffen Grohmann, ETT/TT RD39 Collaboration ST Workshop 2003 CERN, April 01-03, 2003.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino – ENEA Work Package Meeting – ENEA Bologna, November 17th, 2010.
RUP Fundamentals - Instructor Notes
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino, I. Di Piazza, P. Gaggini Work Package Meeting Karlsruhe, November.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Cooling Systems Adopted For the Use in the Particle Detectors 1 V. Vacek AGENDA: What we can offer for the the AFP R&D Project: Two cooling systems (Aircooler.
SPX Data Acquisition PROBLEM DEFINITION REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
Combustor modeling in a 1D flow network tool
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.
1 1F.Bosi, M.Massa, SuperB Meeting, Isola d’Elba, May 31, 2008 Update on Thin Mechanics/Cooling R&D for the Layer 0 of the SuperB Factory F. Bosi - M.
PACMAN : technical objectives Hélène Mainaud Durand.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
WP1.4 Index and Search George Kakaletris University of Athens.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Micro channel cooling Milestones proposal. Year 1 1) Requirement system definition in operational condition. Technology constraints for DRIE on chip design.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Piero Belforte, HDT, MERITA project 2000: objectives, activities and results by Carla GIACHINO .
Piero Belforte, HDT. Year 2000, RISIP Project : objectives, activities and results by Razvan Ene.
Technology Readiness Assessment (TRA)
CSP 25th November 2010 Technical agreement number 3: overview
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Gas system Commissioning procedures and status
Software and Systems Integration
WP8 – Improvement and equipment of irradiation beam lines
Autotest – Calibrated Leak
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
M. Battistin CERN EN/CV/DC 9th July 2009
ALICE PD group meeting Andrea Francescon.
Microfluidic devices for thermal management
WP4 – Plans for next 6 months
GE alternative and outcome
Visibility & Analytics Networks:
WG4 – Progress report R. Santoro and A. Tauro.
Mauro Morandin & Antoine Daël
Simulation of turbulent airfoil Flow Using FlowLab 1.1 (CFD PreLab 2)
Status of CO2 Cooling tests at CERN for Pixel phase 1
AM Business Model Wargame Working Team Documentation
Employer Misclassification Predictive Analytics
AM Business Model Wargame Working Team Documentation
VLT Meeting, Washington DC, August 25, 2005
Scope, Requirements Deliverables & Schedule
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
as a prototype for Super c-tau factory
System tests at CEA O. Piquet 19/03/2019
Project Coaching Steve Snelling.
Presentation transcript:

WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017) Brief news from other labs Status of Milestones and Deliverables Paolo Petagna (CERN)

News from other labs: PISA (F. Bosi) 1. Setup of a refrigerator closed circuit unit for CO2 production 2. Experimental setup for CO2 boiling study in microchannel diam hy. 500-300-200 mm 3. Prototype realization of hydraulic interface in peek material for carbon fiber microchannel ( structure section700 mmx700 mm, diam hy 300 mm) WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

News from other labs: PISA (F. Bosi) CO2 Production UNIT (closed circuit) Refrigerator Unit tested in December. Actually not running for problem on the PLC control of thermostatic valve. Repairing operation planned at end April. WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

News from other labs: PISA (F. Bosi) Experimental setup boiling study Actually in production, ready in April. Study on pyrex tube with the same hydraulic diameter of the carbon fiber microchannel tube. WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

News from other labs: PISA (F. Bosi) Recording system setup for nucleation study Microchannel in a Pyrex rod, hydraulic diam. 500 mm. For demonstration purposes, inside a wire of 25 mm as seen by the high resolution camera system able to record and stores dynamically for 40 sec the fluid flow . WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

News from other labs: PISA (F. Bosi) Hydraulic interface (manifold) First prototypes 3D printing in PEEK material of manifold suitable for microchannel carbon fiber structure not good due to the extreme miniaturization. Used a special noozle of about 160 micron in diameter but problem during the melting process In progress further test and prototypes WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

News from other labs: PISA (F. Bosi) Hydraulic interface (manifold) WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

News from other labs: OXFORD (G. Viehhauser, P. Coe) Air flow cooling setup Good progress with air cooling rig: commissioning to start in April Confirmed funding from UK funding agencies (total 205k£) for: Medium sized (for up to 1.5m long objects) climate chamber 8-line Frequency Scanning Interferometer for precision distance measurements Large optical table WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

WP9: Status of Milestones and Deliverables T 9.2 Milestones T 9.2 Deliverables   Milestone Description Beneficiary Due Date Verification MS 24 CFD models available (Preliminary models to be used for thermofluidics simulations implemented in the available software and ready to launch comparison with experimental results) CERN Jun 2016 Agenda, attendance list on Indico MS 77 Standard connectors available (Engineered design of a family of miniaturized connectors suited for both testing and final applications. Order for procurement submitted) Mar 2018 Purchase order submitted MS 82 Validated CFD models ready (Advanced models, based on subsequent improvements of the preliminary definition provided in MS24 , validated for use and ready for final phase of comparison with experimental results) Apr 2018 Report to St Com Next deadlines coming   Deliverable Description Beneficiary Due Date Type D 9.1 Station for tests on μ-channel test devices Fully engineered design of a test station available to partners, including detailed list of instruments and components, and manual of operation. One prototype test station built and in use for tests CERN Oct 2017 Other D 9.2 μ-channel prototypes μ-channel cooling devices in Si-Si and Si-Glass available to the partners for execution of the agreed test programme, including final model validation. Specifications, geometries and features previously agreed by the partners CSIC Demonstrator D 9.3 Technology recommendations for μ-channel cooling Report detailing the state-of-the-art technologies selected for the production process of μ-channel cooling devices to be installed in future HEP experiments Feb 2019 Report D 9.4 Qualification and characterisation of μ-channel cooling Report detailing the standardized procedures endorsed to qualify and characterise μ-channel cooling devices to be installed in future HEP experiments CNRS WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017

WP9: Status of Milestones and Deliverables T 9.3 Milestones T 9.3 Deliverables   Milestone Description Beneficiary Due Date Verification MS 8 Advanced Mechanical Distributed facility requirements (Report outlining the range of measurement setups and their capabilities to be installed within the Advanced Mechanical Distributed Facility) UOXF Jan 2016 Agenda, attendance list on Indico MS 99 Advanced Mechanical Distributed facility ready (Report listing experimental setups within the Facility, and their performance as demonstrated with realistic prototypes) Feb 2019 Report to St Com Report in preparation   Deliverable Description Beneficiary Due Date Type D 9.5 Advanced Mechanical facility Definition of facility requirements: Identification of parameters characterizing the performance of support structures and identification of experimental techniques which make these parameters accessible, prioritization of the need by the international community for these measurements at a central facility UOXF Jun 2016 Other D 9.6 Common test structures Identification of test structure designs which allow discriminating measurements of relevant structural performance parameter, prediction of performance by FEA, production of test structures and benchmarking results of these structures with the facility CSIC Apr 2017 D 9.7 Standard procedures for qualification and characterisation Setup of measurement facilities, operation of the facility, evaluation of measurement hardware and procedures, development of definition of standard measurement procedures at the Advanced Mechanical facility Feb 2019 Report WP9 AOB P.Petagna WP9 Parallel Meeting 04 Apr 2017