Community Meeting, July 18, 2016 Update Designs and Phasing

Slides:



Advertisements
Similar presentations
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Advertisements

February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
Glenvar High School Renovations School Board Presentation
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
Houston Independent School District James A. Berry Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS Berry Elementary is an environmental sciences magnet.
BECOMING GREEN Santa Margarita High School Academic Building.
21 st Century School Design Building and Designing Schools For Tomorrow’s CMCSS!
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
Learning by Design Using LEED to enhance teaching and learning.
Houston Independent School District Robert L. Frost Elementary School PROJECT PROFILE PROJECT DESCRIPTION Frost Elementary is a new replacement school.
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
Long Range Facility Planning assisted by Silver Falls School District.
School district April 2013 Vision117 Community Presentation PHASE II Vision117.com school district.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
ENVELOPE. LIGHTING.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
Engineering, Sustainability, and the Geosciences Course-level Examples of Geoscience in “Mechanical” Engineering Kevin Amende, P.E. March 7 th, 2013.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Forest View Elementary School Everett, Washington Elementary School Project of Distinction DYKEMAN 2008 Exhibition of School Planning and Architecture.
Eastgate Elementary School Bellevue, Washington Elementary School Design Concept Awards – Projects in the Design Phase NAC|Architecture 2008 Exhibition.
don r. roberts elementary school
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
The importance of process in high performance building design.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
Wahoo Public School District Facility Planning Update April 18, 2016.
White Pigeon Community Schools
Sustainability Assessment of Family House - Case Study
Community Meeting, July 18, 2016
Sustainable Efforts in Housing
High School study space committee report
Fun Facts: James M. Bennett High School
A10.01 Project Description:
Cornwall Central School District
UPDATE: 8/8/2011 Batavia City School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Announcements Final Project Submission Tuesday, May 12th (anytime)
Draft Indoor Recreation Facilities Master Plan
21st Century School Design
College Park Elementary School & Turnbull Learning Center
ESPLOST I REVIEW.
21st Century School Buildings Plan
Community Meeting, July 18, 2016
MIRACOSTA COMMUNITY COLLEGE DISTRICT
A10.01 Project Description:
Iron Forge Educational Center: U. S
UNION GROVE ELEMENTARY REFERENDUM
Wauwatosa School District
Superintendent’s Advisory Committee
Capital Outlay Workshop
Superintendent’s Advisory Committee
Friday 8 am St. Edward's University
Chimacum District Facility & Program Plan
EAST PENNSBORO AREA SCHOOL DISTRICT
Bensalem Township School District Feasibility Study
Presentation transcript:

Community Meeting, July 18, 2016 Update Designs and Phasing Need other company logos involved to place on cover.

PUBLIC VS PRIVATE ZONES OF SCHOOL GRADE HOUSES 01 02 03 04 05 06 07 08 DESIGN OPTIONS SITE INVESTIGATION OPTION DEVELOPMENT PUBLIC VS PRIVATE ZONES OF SCHOOL GRADE HOUSES PUBLIC SPACE (CORE PROGRAM) SUSTAINABILITY PHASING NOTE: THE NUMBERS IN THE RIGHTHAND CORNER ARE DONE IN PPT. FEEL FREE TO CHANGE AS NEEDED.

Updated Preliminary Design Options – Ground Rules Current building size. Current student enrollment. Incorporate community, zoning, land development, administration and board committee comments. Radio Park ES Houserville ES Corl ES The design team continues to explore additional building size, configuration options and attendance area analysis pending results of demographic study and municipal planning efforts. DESIGN OPTIONS

Investigation of Site Conditions is occurring at Radio Park, Houserville and Corl Street Schools Site Surveys Zoning & Municipality Requirements Geotechnical Bore Investigation (Is there rock or substandard soil at locations of Building Designs?) Geothermal Conductivity ( Is ground conducive to geothermal HVAC systems. Geothermal Conductivity Testing Geotech Bore Locations Site Investigation

Design team is investigating preliminary plans and developing educational program of spaces for elementary schools at this time with school district. This includes one and two story building plans (No plans have been finalized at this time). Discussions of classroom program, security, STEM (Science, Technology, Engineering and Math) and core program (Media Center, Gym, Large Group Instruction, Art & Music and additional shared program.) Anticipate this will evolve over the following 3 months. Corl St. ES- One Story Option Corl St. ES- Two Story Option Option Development

Public versus Private Zones of Schools Radio Park ES All school designs are being developed to create clear public/community and student zones. Grade Houses Shared Public/ Community Space Public versus Private Zones of Schools

Early Discussion of Classroom Pods/ Grade Houses Dedicated Zones for K-1, 2/3 & 4/5 Grade Structures Each Grade House typically includes 2 Grades Locations of Grade Houses are designed to create identity and are entered from main public spaces. Grade Houses include 2 Grades Structures Open Classroom for Informal Breakout Instruction Special Education Small Group Instruction (SGI) Close Proximity of Support Space Faculty Rm, Storage, Toilets Ability to quickly move between formal classroom and breakout work whether in a SGI, open classroom or support. (Maximize Educational Time) Corl ES Radio Park ES Houserville ES Grade Houses (School within a School)

Open Classrooms Open Classroom (Center of Grade House) Direct Adjacency to Classroom Instruction Opportunity for Formal & Informal Instruction Visual Connection to Classrooms (Acoustically Separated) Multiple Classroom Instruction, Small Group Instruction, Individual Each Grade House typically includes 2 Grades Locations of Grade Houses are designed to create identity and are entered from main public spaces. Open Classroom (Center of Grade House)

Shared Building Program Each Grade House Shares Core Building Program that includes Administration/ Nurse Kitchen/ Cafeteria Gymnasium Media Center Large Group Instruction Art Classroom Music Classroom Shared Program is also designed to be used as community space after school hours. Ability to limit access to entire building. Houserville ES Public Space (Core Program)

Early Discussions Sustainability Energy Efficiency Heating/Air Conditioning System Selection High R-Value Thermal Exterior Envelope LED Lighting Building Commissioning Daylight Sensoring Investigation of Potential Use of Solar Water Use Reduction Low-Emitting VOC Materials Indoor Air Quality Monitoring During & After Construction Thermal Comfort Acoustics Daylighting and Exterior Views Stormwater Run-off Reduction School as a Teaching Tool Opportunity Sustainability

Heating & Air Conditioning System Selection Geothermal Displacement Ventilation Thermal Storage- Minimize daytime use of electricity Chilled Beam Preliminary Discussion of efficient mechanical systems are being investigated. Site & Building Design may create advantages for certain mechanical systems. Heating & Air Conditioning System Selection

Key Elements of Phasing Seperation of Students and Construction Phase 1 (Red Highlighted Areas) Construction of new classrooms to allow existing building to be renovated. 18 months of construction (Anticipate 3 phases of construction) Radio Park ES Houserville ES Corl ES At this time it appears 3 buildings can effectively phase additions and renovation to the existing buildings. It is anticipated this will evolve with school district, design and construction team input. Construction Phasing