Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
CHAPTER 17 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
pert and cpm ch 9 Learning objectives:
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 Operations Management Lesson 5 Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Operations Management
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Project Management. Maintenance and Reliability 14 Aug 2001.
BA 333 Operations Management
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
PROJECT MANAGEMENT PART SIX Chapter Eighteen Project Management.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Project Management © Wiley 2007.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
Operations Management
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
CHAPTER EIGHTEEN Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
18-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2.
Chapter 16 – Project Management
Chapter 5: Project Management
Project Management Chapter 8.
Project Management.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management Chapter Topics
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PART SIX PROJECT MANAGEMENT Chapter Eighteen Project Management.
Project Planning & Scheduling
17 Project Management.
Chapter 5: Project Management
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
17 Project Management.
Project Planning and Budgeting
Stevenson 17 Project Management.
Project Management Chapter 17
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Presentation transcript:

Project Management (專案管理) Introduction Project management differs from management of more traditional activities mainly because of its limited time framework and the unique set of activities involved, which gives rise to a host of rather unique problems. Time The human resources The work sequence Project Manager Communication Cost Quality

Project Management (專案管理) Project Life Cycle Termination Execution Planning Feasibility Analysis Concept

Project Management (專案管理) Work Breakdown Schedule Developing a work breakdown structure (WBS) to estimate how long it will take to complete the various elements of the project and how much it it will cost. Level 1 Project Level 2 Major Elements Major Supporting Activities Level 3 Level 4 Activities

Project Management (專案管理) Planning and Scheduling with Gantt Charts - For Simple Project Start 2 4 6 8 10 12 14 16 18 20 Locate new facility Interview prospective staff Hire and train staff Select and order furniture Remodel and install phones Furniture received and setup Move in / startup

Project Management (專案管理) Program Evaluation and Review Technique (PERT) And Critical Path Method (CPM) - For Large Scale Projects By using PERT and CPM, managers are able to obtain 1. A graphical display of project activities. 2. An estimate of how long the project will take. 3. An indication of which activities are the most critical to timely project completion. 4. An indication of how long any activity can be delayed without lengthening the project

Project Management (專案管理) PERT And CPM PERT Used in a high uncertainty environment. Developed by Lockheed Aircraft, U.S. Navy, and other consulting firms in an effort to speed up Polaris missile project CPM Developed by Du Pont to plan and coordinate maintenance projects in chemical plants Developed for much less uncertainty environment

Project Management (專案管理) The Network Diagram Example Order Furniture 4 2 Locate Facilities Furniture Setup Remodel 1 5 6 Move In Interview Hire and Train 3

Project Management (專案管理) The Network Diagram Activity-on-arrow: Network diagram convention in which arrows designate activities Activity-on-node: Network diagram convention in which nodes designate activities Activities: Project steps that consume resources and/or time Events: The starting and finishing of activities. Path: A sequence of activities that leads from the starting node to the finishing node Critical Path: The longest path Critical Activities: Activities on the critical path Slack: Allowable slippage for a path

Project Management (專案管理) The Network Conventions a b c a c b b a c

Project Management (專案管理) The Network Conventions c a b d a c Dummy Activity b

Project Management (專案管理) Deterministic Time Estimates Ex: 6 weeks 3 weeks 8 weeks 11 weeks 1 week 4 weeks 9 weeks The length of each path? The Critical path? The expected length of the project? Amount of slack time for each path?

Project Management (專案管理) Deterministic Time Estimates - A Computing Algorithm LS LF ES t EF ES: the earliest time activity can start EF: the earliest time activity can finish LS: the latest time activity can start and not delay the project LF: the latest time activity can finish and not delay the project t: activity time

Project Management (專案管理) Deterministic Time Estimates - A Computing Algorithm Step 1: Determine and place in the brackets for each activity, the earliest starting time, ES, and the earliest finishing time, EF. Do this for all activities , beginning at the left side of the precedence diagram and moving into the right side. ES + t = EF Step 2: Setting the LF time of the last activity equal to the EF of that activity. Obtain the LS time by subjecting the activity time, t, from the LF time. Do this for all activities , beginning at the right side of the precedence diagram and moving into the left side. LS = LF - t Slack Time for each activity = LS - ES or LF - EF. The critical path using this computing algorithm is denoted by activities with zero slack time.

Project Management (專案管理) Probabilistic Time Estimates The probabilistic approach involves three time estimates for each activity instead of one: 1. Optimistic time (o) : The length of time required under optimum conditions. 2. Pessimistic time (p) : The length of time required under the worst conditions. 3. Most likely time (m) : The most probable amount of time required. The Beta distribution is generally used to describe the inherent variability in time estimates. For a Beta distribution, the following approximation for the mean and variance can be used

Project Management (專案管理) Probabilistic Time Estimates PERT makes the simplifying assumption that the mean and variance of project duration, Te and VT, are the sum of the means and variances of duration of activities along the critical path. (requires assumption of independent activity times) From central limit theory (CLT) we deduce that the distribution of the sum of n independent activities approaches the normal distribution as n growth large.

Project Management (專案管理) Probabilistic Time Estimates Ex: For the critical path (a) Calculate the probability of project completion by 47 days. (b) What is the 95% CI of the expect project completion date? Sol: (a) (b)

Project Management (專案管理) Time-Cost Trade-Offs Total Cost Cost Expected Indirect Cost Shorten Direct Expense Optimum Project Length

Project Management (專案管理) Time-Cost Trade-Offs Ex:Using the following information, develop the optimal time-cost solution. Assume that indirect project costs are $1000 per day. 6 10 2 a b f 5 9 c e 4 d