ILC Beam Instrumentation – Introduction Remarks –

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Circuit Simulation Some humbling thoughts… Manfred Wendt Fermilab.
Nick Walker KEK-DESY meeting 7 th March 2005.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
Philip Burrows BDS, LCWS08 Chicago, 17/11/081 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Thanks to: Mike Woods, Manfred.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Instrumentation and Controls ‘Global Group 2’ Update since Snowmass Thursday, December 8, 2005 Marc Ross (SLAC), for Hans Braun (CERN), Junji Urakawa (KEK),
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Fermilab Feb.5, 2007, Beijing N.Solyak -1- Main Linac Magnet Systems and Instrumentation Work Packages for EDR Nikolay Solyak, John Tompkins, Vladimir.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
2 nd ILC Accelerator Workshop (Personal Impressions of a Beam Instrumentalist) Manfred Wendt Sept. 7, 2005 Seminar on Beam Instrumentation Techniques and.
Fermilab February 1, 2007 J. Tompkins -1- Comments on the EDR and Magnet Systems JCT for the Magnet Systems Group
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
October, 2009 Internal Review Beam Instrumentation David Gassner.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
Marc Ross T9 – Snowmass 2001 Closing Plenary T9 – Diagnostics M. Ross/R. Pasquinelli Thursday, July 19 RD: 1) determine mixing between z and x/y 2) determine.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Philip Burrows BDS Kick-off Meeting, SLAC, 13/10/071 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Mike Woods SLAC Thanks.
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
September 20, 2005Margaret Votava1 ILC Controls Planning.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
The Engineering Test Facility for nLC
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
BDS Instrumentation Philip Burrows Mike Woods
In collaboration with P. N. Burrows, A. Latina and D. Schulte
ILC-Americas Regional Team Review
BDS Cryogenic System RDR Status and EDR Plans
The ILC Control Work Packages
BPM development at ATF/CLIC
M.Jonker CTC MPO-WG status
What Should We Do?.
Damping Ring EDR WP4: Instrumentation & Diagnostics
CLIC-ILC BDS & MDI work.
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
Longitudinal Diagnostics for start-up
CLIC/ILC Collaboration Meeting: Objectives & Organization
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
Progress towards nanometre level beam stabilisation
CLIC Beam Instrumentation
Introduction / Comments on instrumentation issues
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
Considerations on Beam Diagnostics Physics
Linac Diagnostics Commissioning Experience
Instrumentation, Controls and MPS
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Presentation transcript:

ILC Beam Instrumentation – Introduction Remarks – Manfred Wendt (Fermilab) 10/24/2007 ALCPG07 GDE Meeting

Past Activities BCD/RDR Instrumentation Group: BCD: RDR Marc Ross, Phil Burrows, Junji Urakawa, Hans Braun, Manfred Wendt, Graham Blair, Steve Smith, and many others. BCD: Focus on mission critical beam instrumentation systems, i.e. beam orbit, emittance, bunch length, and machine protection Summarize R&D status of ongoing developments, particular high resolution cavity BPMs. Define requirements for these core instrumentation systems. RDR Define a core set of beam instruments, and the fundamental requirements. Establish a comprehensive parametric spreadsheet, along areas and instruments for a complete cost analyzes. 10/24/2007 ALCPG07 GDE Meeting

RDR Instrumentation Summary 10/24/2007 ALCPG07 GDE Meeting

RDR Costing Beam Instrumentation: Pickup detectors (mostly vacuum components), e.g. BPMs, toroids, screen monitors, WCMs, F-Cups, etc., also BLMs Read-out, control, timing, and other common hard- and software, NOT: racks, PS, CPU, control interface, etc. Cables Complex integrated instruments, e.g. Laser-wire, DMC, FB, etc. Cost drivers: BPMs, Laser-wires, and DMC Total costs: (no IP instrumentation) ~93 M$ M&S ~ 257 manyears (FTE) 10/24/2007 ALCPG07 GDE Meeting

Area “Common” Instruments Beam Instrumentation has to: measure beam (bunch) parameters (Intensity, orbit, tr. & long. emittance, phase, etc.) within areas, and at the transition between areas! provide detectors for machine protection and feedback systems. be based on a limited set of common, exchangeable instruments to optimize costs, R&D efficiency, maintenance, etc. among accelerator areas. Examples of “common” beam instruments: Toroids (intensity), button and warm cavity BPMs (orbit), screen monitors & ODR (emittance), EOS & DMC (bunch length), read-out hardware, components and subsystems (digitizers, etc.) Examples of area specific beam instrumentation: Cold BPMs, IP instrumentation, fast IP FB. 10/24/2007 ALCPG07 GDE Meeting

EDR Activities & Issues Needs to follow up the RDR instrumentation lists for each area, refine the requirements, look to cost saving alternatives, define R&D needs, etc. Spread instrumentation WPs for international contribution, but also keep the “common” aspect in mind throughout the accelerator areas (coordination?). Clear definition on the WP deliverables! Beam Instrumentation R&D is linked to active groups and test facilities providing beam time, e.g. ATF, ESA, TTF, (NML),… it is NOT just a management exercise! Test facility instrumentation needs and R&D interests may not always follow GDE WPs! 10/24/2007 ALCPG07 GDE Meeting