Review Questions Chapter 5

Slides:



Advertisements
Similar presentations
An Introduction To Marine Steam Propulsion Plant [Source: US Navy]
Advertisements

Main Condensate & Feed Systems
CONTROLS OF SUPER CRITICAL BOILERS
Steam and Water Accessories
OFF DESIGN PERFORMANCE PREDICTION OF STEAM TURBINES
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Main Steam Cycle Let the fun begin….
Rankine Cycle Figures from Cengel and Boles, Thermodynamics, An Engineering Approach, 6th ed., McGraw Hill, 2008.
Mountings & Accessories
Circulating Water System
Superheaters.
Reliable Rankine Cycle : One OFWH & Many CFWHS…. A truly Concurrent Design …… P M V Subbarao Professor Mechanical Engineering Department I I T Delhi.
Reading: Cengel & Boles, Chapter 9
2008 January1 CANDU Control Programs & Process Systems B. Rouben McMaster University EP 4P03/6P Jan-Apr.
9 CHAPTER Vapor and Combined Power Cycles.
Chapter 1 VAPOR AND COMBINED POWER CYCLES
Steam Power Plant.
2 July Turbine Condensate System
Main Condensate & Feed Systems
POWER PLANT.
Thermal_Power_Plant_2 Prepared by: NMG
Irreversible Flow from Turbine Exit to Condenser
Lesson 7 Steam Power Plant.
TURBINE & COOLING SYSTEM Presented By – AVIJEET PRATAP 07ME12 IET AGRA
ACADs (08-006) Covered Keywords Description Supporting Material
Vapor and Combined Power Cycles (2)
STUDY OF BOILER’S ACCESSORIES
Lesson 8 SECOND LAW OF THERMODYNAMICS
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
Chapter 10 Vapor and Combined Power Cycles Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 7th edition by Yunus.
STEAM POWER PLANTS.
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
ENGR 2213 Thermodynamics F. C. Lai School of Aerospace and Mechanical Engineering University of Oklahoma.
BOILER MOUNTINGS & ACCESSORIES
Presentation on Steam Power Plants R.C.Chaturvedi
Refrigeration Systems
© Copyright 2016 OGF - Review – Fluid Statics and Dynamics Thermodynamics Fluid Statics/Dynamics.
Generator Operation. Video of Generator synchronizing.
Lesson 7 Steam Power Plant.
Chapter No-5 STEAM CONDENSERS AND COOLING TOWERS Marks-16
EP4P03 Nuclear Power Plant Systems and Operation
 II THE ADVANTAGES OF ELECTRICITY
Fluid Statics/Dynamics
Chapter 10 VAPOR AND COMBINED POWER CYCLES
Chapter 10 VAPOR AND COMBINED POWER CYCLES
Feedwater System Overview IUFW PV340 (NO) Call up desktop display for BFPs and panel 5 bottom. Again, before we look at the simplified Feedwater flowsheets,
Objectives Evaluate the performance of gas power cycles for which the working fluid remains a gas throughout the entire cycle. Analyze vapor power.
EP4P03 Nuclear Plant Systems and Operation
Thermodynamics Thermal Hydraulics.
VARIABLE EFFECTING EFFICIENCY OF RANKINE,REHEAT,REGENERATIVE CYCLE
Thermodynamics Cycles.
Thermodynamics Processes.
Lecture Objectives: Answer question related to Project 1 assignment
Simple Thermal Power Plant
Power and Refrigeration Systems
VAPOR & COMBINED POWER CYCLES
DELTAK HEAT RECOVERY STEAM GENERATOR
Power Plant Technology Steam and Gas Cycle Power Plant (Assignment 1)
POWER PLANT THERMAL POWER STATION.
Pressurized Water Reactor
A Train of Closed Feed Water Heaters
PRODUCTS (POWER PLANT)
9 CHAPTER Vapor and Combined Power Cycles.
Working with Phases and Properties of Substances
The Second Law of Thermodynamics
STEAM CONDENSERS AND COOLING TOWERS Marks-16
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
Generation of Most Eligible Steam for Rankine Cycle
Boiler Safety Valve Regulations
Presentation transcript:

Review Questions Chapter 5 This material is provided for the sole use of students in the 2017 Winter Semester course EP4P03 Nuclear Plant Systems and Operation. This material is not to be copied or shared in either electronic or paper form.

True or False 5A.1-a Because the Steam and Feedwater systems form the normal heat sink for the energy produced by the Reactor, the reliable operation of the Steam and Feedwater systems is important for reactor safety.

True 5A.1-a Because the Steam and Feedwater systems form the normal heat sink for the energy produced by the Reactor, the reliable operation of the Steam and Feedwater systems is important for reactor safety.

True or False 5A.1-b If the turbine is not available, all the steam flow bypasses the turbine and goes directly to the condenser.

False 5A.1-b If the turbine is not available, while most of the steam by-passing the turbine will flow to the Condenser, some of the steam may be released through the Atmospheric Steam Discharge valves.

True or False 5A.2-a The steam-water mixture at the top of the steam generator tube bundle consists of about 90% steam and 10% water.

False 5A.2-a The steam-water mixture at the top of the steam generator tube bundle consists of about 10% steam and 90% water.

True or False 5A.2-b The temperature of the incoming feedwater is raised to the saturation point in the integral Preheater, and the amount of water cycling through the tube bundle and the Downcomer is typically ten times as much as feedwater entering the boiler.

True 5A.2-b The temperature of the incoming feedwater is raised to the saturation point in the integral Preheater, and the amount of water cycling through the tube bundle and the Downcomer is typically ten times as much as feedwater entering the boiler.

True or False 5A.3-a If steam pressure rises above predetermined limits, the Atmospheric and Condenser Steam Discharge Valves can be opened by the Steam Generator Pressure Control System. If steam pressure continues to rise, Safety Valves installed on top of the steam generators protect the steam system from over pressure.

True 5A.3-a If steam pressure rises above predetermined limits, the Atmospheric and Condenser Steam Discharge Valves can be opened by the Steam Generator Pressure Control System. If steam pressure continues to rise, Safety Valves installed on top of the steam generators protect the steam system from over pressure.

True or False 5A.3-b The quick closure of the Emergency Stop valves is sufficient to prevent the turbine from overspeeding.

False 5A.3-b In addition to closing the Emergency Stop Valves (which stop the steam flow to the High Pressure Turbine cylinder), it is also necessary to close the Intercept Valves leading to the Low Pressure Turbine cylinders, and to open the Release Valves, to by-pass the steam in the piping, the Separator and the Reheater, to the Condenser.

True or False 5A.4-a In the high pressure turbine the latent heat of the steam is converted to rotational energy, and in this process the moisture content of the steam increases to about 10%. The steam outlet from the HP Turbine stage passes to the Moisture Separator which removes the moisture in the steam without changing its temperature and pressure.

True 5A.4-a In the high pressure turbine the latent heat of the steam is converted to rotational energy, and in this process the moisture content of the steam increases to about 10%. The steam outlet from the HP Turbine stage passes to the Moisture Separator which removes the moisture in the steam without changing its temperature and pressure.

True or False 5A.4-b All the steam that passes through the Low Pressure Turbine is exhausted to one Condenser at approximately 5 kPa(a), 35C and 10% moisture content.

False 5A.4-b Each low pressure turbine cylinder has its own condenser, i.e. the steam from the LP turbine is exhausted to three separate condensers.

True or False 5A.5-a Atmospheric Steam Discharge Valves are opened by the steam pressure control program in proportion to the pressure error, normally with an offset of 70 kPa in the steam pressure setpoint. Under normal operating conditions the steam generator pressure will need to rise 100kPa above its setpoint before the CSDVs begin to open.

True 5A.5-a Atmospheric Steam Discharge Valves are opened by the steam pressure control program in proportion to the pressure error, normally with an offset of 70 kPa in the steam pressure setpoint. Under normal operating conditions the steam generator pressure will need to rise 100kPa above its setpoint before the CSDVs begin to open.

True or False 5A.5-b There are 12 CSDVs in a typical CANDU unit, connected in such a way that all the valves discharge steam to one condenser shell.

False 5A.5-b The 12 CSDVs are connected so that each valve discharges steam into one half of one condenser shell. (i.e. each condenser half has two CSDVs connected to it).

True or False 5A.6-a The Condensate Extraction Pump (CEP) pumps the water from the Condenser Hotwell through the Low Pressure Heaters into the Deaerator. The LP feedheaters use extraction steam from the LP turbines as their heating medium; the extraction steam condenses in the shell of the heater, and is pumped back to the condenser hotwell.

True 5A.6-a The Condensate Extraction Pump (CEP) pumps the water from the Condenser Hotwell through the Low Pressure Heaters into the Deaerator. The LP feedheaters use extraction steam from the LP turbines as their heating medium; the extraction steam condenses in the shell of the heater, and is pumped back to the condenser hotwell.

True or False 5A.6-b The feedwater system raises the temperature of the feedwater flowing from the condenser to the steam generators by heating it. This heating is done in the Low Pressure and High Pressure Heaters.

False 5A.6-b The Deaerator also adds a significant amount of heat to raise the temperature of the feedwater between the condensers and the steam generators.

True or False 5A.7-a Two 50% capacity (or three 33.3% capacity) steam generator feed pumps are required to supply the necessary flow to the steam generators above 25% full power. The steam generator feed pumps take their suction from the Deaerator Storage Tank and raise the feedwater pressure to between 4 and 7 MPa.

True 5A.7-a Two 50% capacity (or three 33.3% capacity) steam generator feed pumps are required to supply the necessary flow to the steam generators above 25% full power. The steam generator feed pumps take their suction from the Deaerator Storage Tank and raise the feedwater pressure to between 4 and 7 MPa.

True or False 5A.7-b The High Pressure Feedheaters use Extraction Steam from the High Pressure Turbine to raise the pressure of the feedwater above the pressure produced by the steam generator feed pumps.

False 5A.7-b The High Pressure Feedheaters raise the temperature of the feedwater, not is pressure.

True or False 5A.8-a Changes in the size of the steam bubbles as a function of steam generator pressure, steam and feedwater flows help to keep the measured level constant.

False 5A.8-a Changes in the size of the steam bubbles can result in significant changes in the measured (and actual) steam generator level, although the inventory of water in the steam generator remains essentially constant.

True or False 5A.8-b The steam generators are the normal heat sinks for the reactor, so in order to ensure cooling of the fuel, an adequate volume of water needs to be maintained in the steam generators. The volume of water in the steam generators is kept constant at all power levels by varying the steam generator level setpoint as a function of reactor power.

True 5A.8-b The steam generators are the normal heat sinks for the reactor, so in order to ensure cooling of the fuel, an adequate volume of water needs to be maintained in the steam generators. The volume of water in the steam generators is kept constant at all power levels by varying the steam generator level setpoint as a function of reactor power.