Long-Term Planning Presented by: APP Site Visit Don Untch

Slides:



Advertisements
Similar presentations
BA240: Operations Management Overview Manufacturing & Services Process Mapping The Role of Technology POM Software Demo Measuring Productivity Exercises.
Advertisements

Traci L. Bender Nebraska Public Power District APPA Business & Financial Conference September 15, 2009 Risk Analysis.
Foundations and Evolutions
Eugene Water & Electric Board 2014 Annual Conference Making Risk-based Decisions for Hydro Infrastructure February 19, 2014 Roger M. Kline – Generation.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
A World of Solutions Duke Energy Strategic Energy Management Planning (SEMP).
The Times 100 Business Case Studies
Aust. AM Collaborative Group (AAMCOG) An introduction to ISO “What to do” guide 20th October 2014.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Thomson Business & Professional Publishing. All rights reserved.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Chapter 1 The role of Purchasing in the Value Chain
Workforce Planning Business Unit Planning Tool Kit (draft)
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Sustainability and Total Cost of Ownership Strategies for Higher Education.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
ADTRAN: The Network Access Company. 2 Telecommunications u Multi-billion dollar industry u Voice and digital data transmission u Carrier and End User.
PURCHASING & STORAGE MANAGEMENT Instructor Abdel Fatah Afifi 2 nd Semester 90/10.
Energy Industry Country Industry Forecast Service ( CIF ) Global Econometric Modeling group, India Energy Industry Country Industry Forecast Service (
Chemicals Country Industry Forecast Service Country Industry Forecast (CIF) Group Chemicals Country Industry Forecast Service Country Industry Forecast.
Resident Directed Living Choice Dining Development STRATEGIC OBJECTIVES – TACTICAL IMPLEMENTATION Resident Directed Living © Choice Dining Development.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
International Life Cycle Partnership To bring science-based life cycle approaches into practice worldwide UNEP/SETAC Life-Cycle Initiative Life Cycle Management.
The Business Plan: Creating and Starting the Venture
NCOP PRESENTATION OF THE MINERAL RESOURCES 2010 / 11 BUDGET DATE 12 MAY 2010 DEPARTMENT OF MINERAL RESOURCES.
VP Quarterly Report on Strategies Q3 – 2015/16 VP: Carol Klassen – Knowledge & Technology Services Multi-year Plans: - IT/IM/Equipment Multi-year Plan.
10 W EEK P ROJECT S COPE OF S ERVICES March 13th, 2014.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
Foundations and Evolutions
Procurement Transformation Project Stakeholder Update.
E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Maricopa Association of Governments (MAG) February 5, 2003.
1 Fleet Sourcing Project Presented to the City Council By Wayne Corum, Director Equipment Services Department (ESD) November 17, 2009.
BONDING & ACCESS TO CAPITAL SMALL CONTRACTORS INITIATIVE.
Eric Rinearson Director, Facilities Maintenance Services
Draft - Enterprise Risk Management Risk Universe
Operations as a Competitive Weapon
Challenges and opportunities for the CFO
Planning for Information System
Chapter 8: The Master Budget
Implementing Effective Energy O&M Strategies on a Limited Budget
Review From the previous chapter, we understand that maintenance policy stream down from corporate strategy. It has to be integrated with management so.
LOGISTICS NETWORK.
Asset Management Accountability Framework - Guidance
Finance Training for Governors
SEEA CF research agenda
Introduction to Operations Management
Strategy and Human Resources Planning
Next Steps: Analyzing Energy Costs and Performance Benchmarking
Work-force planning involves two major activities
Enron Energy Services Energy Management Outsourcing Overview
Chapter 5: Workforce Planning
City of Guelph HR Annual Report April 7, 2011.
Operations Management Introduction to operations Management 1.
ADTRAN: The Network Access Company
progress of the water reform in bulgaria
Long Range Facilities Plan
Program Review Workshop
Capital Improvement Plans
Cash Flow and Financial Planning
Presentation to the Portfolio Committee - Labour
Cash Flow and Financial Planning
KEY INITIATIVE Financial Data and Analytics
Chapter 6 The Master Budget and Responsibility accounting
Kay Higby Responsible Care Superintendent ISO Management Representative Akzo Nobel Functional Chemicals, LLC.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Kathleen Frankford > NEXTFactor Enterprises
Presentation transcript:

Long-Term Planning Presented by: APP Site Visit Don Untch Lead Long Range Asset Planner APP Site Visit October 30 – November 4, 2006

Strategic Tactical LONG-TERM PLANNING or Fossil & Hydro Generation (F&HG) long-term planning can be either: Strategic or Tactical

LONG-TERM PLANNING FLOW HIGH LEVEL OVERVIEW

STRATEGIC PLANNING F&HG Ten Year Strategic Plan: Develops an Asset Management Philosophy Lays the Foundation for a Working Plan that will Evolve with the Changes Associated with Our Industry Is Comprehensive, Giving Consideration to all Known Factors and Variables Incorporates a Environmental Compliance Plan Helps Improve Fleet Operational Performance Considers Yearly Fleet Expenditures Addresses Demographic Concerns with a Workforce Plan Suggests a Potential Fleet Portfolio

STRATEGIC PLAN CONTENTS Summary of Fleet Historical Trends Performance Trends Energy Value and Contribution Equivalent Availability EFOR (Equivalent Forced Outage Rate) Maintenance and Forced Outage Summary Capital and O&M Spending Trends Workforce Plan (Demographics) Future Major Operating Liabilities Environmental Compliance Strategy Long Term Fleet Portfolio

STRATEGIC PLANNING PROCESS EXAMPLE WORKFORCE PLAN PRIMARY GOALS SECONDARY GOALS INITIATIVES LABOR RELATIONS ISSUES DETERMINE OPERATIONAL ROLE OF THE PLANT DETERMINE OPTIMAL STAFFING LEVELS FOR THE PLANTS Review Results from Financial Models & Strategic Long Term Plan Determine Role of Shared Resources Review “Outsourcing” Review Layoff Allowance Consider Strike Impact on Staffing Benchmark Against Other Plants & Utilities “Outsourcing” Layoff & Recall Contract Provisions Layoff Allowance Policy Transferring Employees Between Plants

STRATEGIC PLAN – PROGRESSION Follow-up Meetings with the Various Organizations to Continue Development of Strategic Long Term Plan Fuel Procurement & Fuel Logistics Human Resources Information Technology Market Operations Corporate Communications Environmental Regulatory Services

LONG TERM “TACTICAL” PLANNING F&HG Ten Year Tactical Plan: Focuses on Details Focuses on Action Incorporated into an Executable Schedule or Timeline Focuses on Implementation Focuses on Results Tightly Integrated with the Annual Budget Process Turns Strategy into Reality

TACTICAL PLAN – TYPICAL YEARLY MEETING DISCUSSIONS TOPICS Unit Role Environmental Compliance Market & Commercial Operation Objectives & Shortfalls Fuel Procurement & Handling Financial & Budget External Benchmarking Data Unit Value Assessment Study (if Applicable) Equipment Liabilities by Engineering Discipline Engineering Facility Health Report Health Reports from Previous Business Plans Equipment “GAP” Program (Expectation Shortfalls) Engineering Input & Comments Long Term Planned Outage Frequency and Scheduling

TACTICAL PLAN – OUTPUT & RESULTS Long Term Planned Outage Schedule for each Unit Long Term Turbine, Generator, Boiler Feed Pump & Transformer Inspection Schedule with Spare Part Flow Basis for Input into: Financial Analysis Budgeting Systems Business Planning Process Long Term Plan Unit Long Term Liability Grid Sheet Summary Assigned Action Item List Meeting Minutes

TACTICAL PLAN – LONG TERM PLANNED OUTAGE SUMMARY - EXAMPLE

TACTICAL PLAN – LONG TERM MAJOR EQUIPMENT REPAIR SCHEDULE - EXAMPLE

TACTICAL PLAN – GOING FORWARD Improve Long Term Plan Information Exchange All Fragmented & Pertinent Information Located in One Place Information is Very Accessible to Multiple Users Comprehensive Plan Used to Facilitate the Decision Making Process

Appendix

SIMPLIFIED LONG TERM FLOW PROCESS

TACTICAL PLAN – LONG TERM SPARE PART FLOW - EXAMPLE

TACTICAL PLAN – LIABILITY SUMMARY EXAMPLE FOR 2006 Liability Codes Defined Next Slide

TACTICAL PLAN – LIABILITY CODES