Critical Path Analysis (CPA)

Slides:



Advertisements
Similar presentations
Lecture Network Analysis
Advertisements

Copyright 2006 – Biz/ed Critical Path Analysis.
Estimating, scheduling and budgeting
PROJECT MANAGEMENT Network or Critical Path Analysis
Having Fun with Gantt PERT &.
Welcome to your final year at school! Introductions.
5.8 Project Management Chapter 37 HL - Only.
Operations Management
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Lecture Network Analysis
CRITICAL PATH ANALYSIS aka NETWORK PATH ANALYSIS DESIGNED to help managers who are planning complex projects that involve many interrelated tasks The idea.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
Project Management Project Planning Estimating Scheduling.
A brief summary of Critical Path (or network) Analysis Critical Path Analysis is a way of planning complex projects. It allows one to find those parts.
IB Business and Management 5.8 Project Management (Critical Path Analysis)
Topic 5.8 ( only HL ) IB Business & Management Project Management Mr L Greenbank 1.
O PERATIONAL S TRATEGIES O PERATIONAL S TRATEGIES : L EAN P RODUCTION “Do not wait; the time will never be just right” Napoleon Hill “The clock not the.
Project Management Chapter 16. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities Products & Processes.
Critical Path Analysis. Planning and Monitoring Tool.
PROJECT MANAGEMENT Approaches
Operational strategies Lean production. The adoption of techniques that help to reduce waste.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
A2 Operations Management Critical Path Analysis. How long will it take? n Walls have decided to launch a new Magnum ice cream. Machine delivery will take.
INVENTION, INNOVATION AND DESIGN Invention: A new way of making a product (e.g. walkman) or process (e.g. spray painting). Inventions usually come from.
Critical Path Analysis - Worksheet
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
Net work Analysis/Critical Path Analysis (L1) Learning Objective – Understand CPA Learning Outcomes - By the end of the lesson students should be able.
Critical Path Analysis. Starter – The Big Breakfast! On Saturday, I want to cook myself a big breakfast.I want to have some toast, scrambled eggs and.
First name ??? ist auf Englisch. Critical Path Analysis.
Lean Production: Critical Path Analysis 3.15 Lean Production Objectives; Understand the key requirements of critical path analysis (CPA) Understand the.
Copyright 2006 – Biz/ed Critical Path Analysis.
A Brief intro to Project Management What can it do for you
Critical Path Analysis
Time Planning and Control Time-Scaled Network
Critical Path Method(CPM)
UNIT II Scheduling Procedures & Techniques FLOAT
Critical Path Analysis
Activity networks – Example 1
Business Decision Making
Project Scheduling Lecture # 1.
Project Management for Business
Critical Path Analysis (CPA)
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Analysing the AoA network
Welcome to your final year at school!
Project Scheduling: networks, duration estimation, and critical path
Critical Path Analysis
Time Planning and Control Time-Scaled Network
Project Scheduling Basics Activity on Node Precedence Diagrams
Software Project Management
PERT - The Program Evaluation and Review Technique
Critical Path Method Farrokh Alemi, Ph.D.
Activity on Node Approach to CPM Scheduling
Project Management (lecture)
Software Project Management 4th Edition
Software Project Management 4th Edition
Project Planning By Phaik San Liew.
Chapter 6 Activity Planning.
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
CPA – Information Sheet
Project Management (lecture)
Importance of Project Schedules
Chapter 6 Activity Planning.
Critical Path Analysis
Critical Path Analysis
CHAPTER 6 PROJECT TIME MANAGEMENT
Have a think…! What process do you need to go through to make bread or redecorate your bedroom? Are there any activities that could be done at the same.
Presentation transcript:

Critical Path Analysis (CPA) 3.3 Decision-making techniques

What you need to know a) Nature and purpose of Critical Path Analysis b) Complete and interpret simple networks to identify the critical path c) Calculate: Earliest Start Time Latest Finish Time total float d) Limitations of using Critical Path Analysis

Operations management Concept links Network Analysis Risk management Business planning Investment appraisal Operations management Contingency planning

Critical Path Analysis (“CPA”)

Why Businesses Need to Plan Complex Projects Many larger businesses get involved in projects that are complex and involve significant ________________ and ________ As the complexity and risk increases it becomes even more necessary to identify the __________________________________involved and to work out the most efficient way of completing the project

Information needed for CPA A list of all ______________required to complete the project The time (_______________) that each activity will take to completion The __________________between the activities (e.g. activity D cannot be completed until activity B&C done)

CPA calculates… The longest path of planned activities to the end of the project The ________________________________ and ______________________________time that each activity can start and finish without making the project longer Which activities are ___________(i.e. on the longest path) and which have ______________(i.e. can be delayed without making the project longer)

What is the Critical Path?

Why is the Critical Path so Important?

Drawing the network Component Description Node A circle that represents a point in time where an activity is started or finished. The node (circle) is split into three sections: The left half of the circle is the unique node (activity) number – the network diagram draws these in order The top right section shows the earliest start time (EST) that an activity can commence based on the completion of the previous activity The bottom right section shows the latest finish time (LFT) by which the previous activity must be completed Activities An activity is something that takes time. An activity is shown on the network as a line, linking the nodes (circles). A description of the activity, or a letter representing the activity, is usually shown above the relevant line Duration The length of time it takes to complete an activity – shown as a number of the relevant units (e.g. hours, days) under the activity line

The Network Diagram - Layout EST Activity 7 H 4 8 10 LFT Duration Activity

Simple project example – revising for exams Task Activity Dependent on Duration (hours) A Gather lesson notes and read through Starting activity 10 B Identify gaps in knowledge Completion of task A 3 C Research online sources Completion of task B 5 D Procrastinate and browse Facebook 30 E Write revision plan & revision notes Completion of task B & C 12 F Practice past exam papers Begin when E complete 8 G Complete last minute cramming 15

Calculating ESTs The first node will always have an EST of zero! ESTs are calculated from left to right Add the duration of an activity to the EST of a previous node If more than one activity leads to a node, the highest figure becomes the new EST

Calculating ESTs – Exam Project 1 4 18 5 30 E 12 F 8 C 5 2 10 3 13 6 43 7 58 A 10 B 3 G 15 D 30

Calculating LFTs Give the last node of the project an LFT = to the EST _________________________________ Subtract the duration of the activity from the LFT

Calculating LFTs – Exam Project 1 4 18 23 5 30 35 E 12 F 8 C 5 2 10 3 13 6 43 7 58 A 10 B 3 G 15 D 30

LFT less Activity Duration less ________ Calculating the Float The __________ is the duration an activity can be extended or postponed so that the project still finishes within the minimum time Calculated as: LFT less Activity Duration less ________

Calculated Float – Exam Project Activity LFT Duration EST Total Float A 10 B 13 3 C 23 5 D 43 30 E 35 12 18 F 8 G 58 15

Identifying the Critical Path Activities with a float of 0 (zero) _______________________________________ without delaying the ___________________ Such activities represent the ________________ On the critical path, activities have an equal EST and LFT

Identifying the critical path 1 4 18 23 5 30 35 E 12 F 8 C 5 2 10 3 13 6 43 7 58 A 10 B 3 G 15 D 30 ____________________________________________

Uses of Critical Path Analysis

Benefits and Drawbacks of CPA Advantages Disadvantages Most importantly – helps reduce the risk and costs of complex projects Reliability of CPA largely based on accurate estimates and assumptions made Encourages careful assessment of the requirements of each activity in a project CPA does not guarantee the success of a project Help spot which activities have some slack (“float”) and could therefore transfer some resources = better allocation of resources Resources may not actually be as flexible as management hope when they come to address the network float A decision-making tool and a planning tool – all in one! Too many activities may the network diagram too complicated. Activities might themselves have to be broken down into mini-projects Provides managers with a useful overview of a complex project Links well with other aspects of business planning, including cash flow forecasting and budgeting