Muon Ionisation Cooling Experiment Overview

Slides:



Advertisements
Similar presentations
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
The MICE demonstration of ionization cooling J. Pasternak #, V. Blackmore, C. Hunt, J-B. Lagrange, K. Long, Imperial College, London, UK Alain Blondel,
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
Executive Board Meeting Roy Preece 23rd May 2014
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE hydrogen review Introduction to MICE. After the LHC… Many open questions in physics: Gravity & standard model Matter-antimatter imbalance Dark matter.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Muon Ionization Cooling Experiment - MICE HEPTech - Grenoble 4-5 th June 2015 Tom Bradshaw STFC, Rutherford Appleton Laboratory.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Status of the MICE Construction Project
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
The Muon Ionization Cooling Experiment: Controls and Monitoring
Report on EUCARD WP6: MICE Transnational Access (TA)
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
The Detector System of the MICE Experiment
Presentation transcript:

Muon Ionisation Cooling Experiment Overview Roy Preece Particle Physics Department, STFC Compact Muon Sources Workshop 12th January 2015

Content Overview Charge Ionisation Cooling Test Facility (ICTF) MICE MICE Current Status Step IV Cooling Demonstration Milestones

Charge for MICE MICE MICE approved to: Design, build, commission and operate a realistic section of cooling channel Measure its performance in a variety of modes of operation and beam conditions Results will allow Neutrino Factory [and Muon Collider] complex to be optimised Requirements: Normalised transverse emittance: 0.1% Requires selection of 99.9% pure muon sample MICE

ICTF : Ionisation Cooling Test Facility Beamline The Ionisation Cooling Test Facility (ICTF) comprises a specially developed target and beam-line at the ISIS proton synchrotron (800 MeV) at STFC’s Rutherford Appleton Laboratory. The beam-line provides µ, p, π, e at 100 MeV/c to 400 MeV/c. It has been operational for several years, though intensity continues to increase. The ICTF beam and infrastructure have been designed for the study of ionisation cooling, and meet the requirements of the Muon Ionisation Cooling Experiment (MICE), which is installed at the ICTF.

ICTF : Ionisation Cooling Test Facility Beamline EuCARD-2 WP8 Through the EuCARD-2 project WP8, travel and subsistence is available for groups to work at the ICTF during installation and operation of equipment placed on the beamline. Applications for access can be submitted to the MICE Admin for beam time. Application deadlines are every 6 months and allocations are granted for up to 18 month periods Applications are deliberated by the allocations panel every 6 months. Experimental schedules and space availabilities are deliberated and prioritised. Space available for experiments is limited due to the MICE experiment installation Particle identification style detector system could have the scope to fit into the current installation and schedule http://eucard2.web.cern.ch

“MICE Step IV”; data taking 2015/16 Optimised for the study of material properties that affect cooling Liquid Hydrogen will be the primary material investigated. Liquid Hydrogen will only be used at this step. Lithium Hydride will be used during Step IV and the Cooling Demonstration

MICE cooling demonstration Transmission MICE: demonstration of ionization cooling

MICE Update Cooling Demonstration Designs for the RF amplification module exist and all magnet systems are at RAL. Initial design for the partial return yoke extension is underway.

MICE Update Spectrometer Solenoid Magnets Tracking detectors installed Diffuser installed to the Upstream magnet Focus Coil Magnets Second Focus Coil magnet has been successfully tested to full operation currents Magnetic Mitigation JFE material shipped to USA West wall structure complete Compressors installed to the west wall Vacuum Manifold Main manifold line is installed Roughing pumps are in place and ready for use.

MICE Update Partial Return Yoke Under floor structures are being installed Set of frame legs will arrive later this month The main JFE material plates are bing machined 2 Stage Pulse tube cooler compressors installed Tracking detectors installed to the Spectrometer Solenoids. Cryostates cooling and ready for data taking Hydrogen tower fully installed. Final review this month.

Milestones and Schedule Milestones agreed with the MICE Project Board The installation of the Step IV arrangement will be early June. Commissioning of the lattice will start. This is a high risk area of the project with three magnets operating in clos proximity To enable work to commence unhindered the data taking for Step IV must end June 2016. Construction of the cooling Demonstration arrangement will be completed toward the end of March 2017 Commissioning of the magnets and RF acceleration modules complete early May 2017 Data taking on these milestones are set to completed end of UK FY2017/18. Discussion and funding application will be needed to operate through following years

Conclusions ICTF: Available through application through EuCARD-2 Travel and Subsistence available MICE: Will prove the essential ionization-cooling technique Study of the factors that affect ionization cooling (Step IV): Construction complete: Spring 2015 Data taking: Summer 2015—June 2016 Demonstration of ionization cooling: Construction complete: Early 2017 Data taking start: Spring 2017 Poised to deliver the demonstration of ionization cooling