ATLAS Internal ID Service Integration

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Modularity in the Phase II Upgrade of the ATLAS Strip Tracker Ian Wilmut.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Paul Barclay SCT COOLING PRR DESIGN PERAMETERS a)ACTIVE LENGTH TO MATCH Q.M.U.L PROTOTYPE b)GENERAL LAYOUT OF HEAT EXCHANGERS.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Stave Tooling & Plans for Future Stave-building (Tim)
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
EC: 7 DISK concept Preliminary considerations
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
LBNF CAD models, Drawings and Component list
Update of MVD services and requests
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
WP4 – Plans for next 6 months
Services Layout – Update
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Chamber Design and Integration RE3/1 and RE4/1
update on UT cooling system
MicroMegas Mechanical Meeting --- Cern April 2014
CO2 cooling requirements for the IBL
ATL-IC-ES new version available - approval starts
Presentation transcript:

ATLAS Internal ID Service Integration An update on service layout proposals by the UK John Hill

Recent Developments Detailed schemes and layouts produced at RAL Prototype manufacture of components. Duct, covers and connector block Dummy assembly of ‘Service Module’ progressing. Dummy cooling pipes added to assembly Schemes and progress presented to CERN Integration Group. Much interest shown in the design, positive feedback with some comments mainly on manifold layout and electrical connectors Successful interaction of ID information with CERN and Valencia. Some areas require further development and study. Gas sealing, thermal transition of cooling, grounding and component location

ID Service Module Component Update Service Module duct Assembly End View – cover off and connector block End View – Cover off ELECTRICAL SERVICES COOLING PIPES PATHWAY SERVICE MODULE COOLING FITTINGS (AT CONN. BLOCK) CONNECTOR BLOCK MANIFOLDS COOLING PIPES PATHWAY FO CONNECTORS FIBRE OPTICS PATHWAY Connector Block Proposed service segmentation

SERVICES POTENTIAL ACCESS FOR COOLING MANIFOLDS Section showing Service Module and PP location at end of ID (figures based on Strawman Spt 2009)

With the Service module partially constructed and using the full size mock up at RAL we can now adopt this structure to investigate Inner Detector fitting and further optimise cooling pipe layouts to staves Construction of service module Cooling Pip ‘Tree’ Another view of manual Fitting of SM Connector block end (PP) Manual Fitting of SM

(Showing cooling pipe pathway) Recent Developments – prototype development of cooling pipes and manifolds End of Duct (Showing cooling pipe pathway) Current Manifold layout Service Module (with cooling pipes)

Alternative connector solutions have also been modelled and can be investigated further on ID Mock Up Layouts using alternative ‘Fischer’ connectors, separating DCS and Power services (these are hermetically sealed units) Hermetic seal made here Layouts using CERN Axon connector (mounted on PCB) and fitted onto connector panel

Modelling area of Thermal Transition (SM to PP) It is planned to make dummy components for SM prototype at RAL using ‘Insulating’ material backed with c-f sheet

SIDE VIEWS OF ID AND SINGLE SM SERVICE MODULE COMPLETE AND TESTED SERVICE MODULE INSERTED INTO ID CYLINDER SERVICE MODULE FIXED, PIPES WELDED/TESTED REMAINING SERVICES CONNECTED AND TESTED SIDE VIEWS OF ID AND SINGLE SM

Future work plans Development work to continue on the SM prototype and integration on to ID mock up at RAL Complete cooling layout to progress with welding trials on ID mock up Potential to weld up a section of cooling with manifold to undertake pressure tests Look at alternatives to manifold layout within SM Maintain Service Module documentation for future reviews Failure and risk analysis, list and document for service module design Continue to develop service and design links, exchange ideas with CERN and Valencia