Civil Construction in the US Chris Laughton, Fermilab

Slides:



Advertisements
Similar presentations
Managing a Successful Mechanical System project Following design – what next?
Advertisements

Design Parameters.
Laughton, March 2004Theta 13 San Luis Obispo Workshop 1 Civil Construction in the US Chris Laughton, Fermilab.
15 March 2004Cal Poly Meeting Status of Midwest  13 Effort Status of Braidwood site General strategy and layout of experiment Civil construction estimate.
Laughton, February 2004Draft - Basis of Estimate for Review 1 Theta 13 Midwest Site Basis of Estimate for Underground Construction Input based on Preliminary.
Partial Underground Analysis– TRTP Project Project Segment 8A Corridor October 29, 2011.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Braidwood Status Report Jonathan Link Columbia University APS Study, Reactor Working Group February 7&8, 2004.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
CSM/CNA UNO R&D Proposal Lee Petersen –CNA Consulting Engineers Mark Kuchta –Colorado School of Mines Requested budget: $200k/year for two years Cavern.
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Preparing Foundations for Cylinders & ASME Tanks
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Environmental Toolbox. Technical Module Introduction.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
DIAPHRAGM WALLS.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
LAGUNA Design of a pan- European Infrastructure for Large Apparatus studying Grand Unification and Neutrino Astrophysics Guido Nuijten.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
An Introduction to Procurement
Experimental Hall in Mountain Regions
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
Chapter 3 Project Management. Chapter 3 Project Management.
Fort Stanwix National Monument Energy Audit Contract
Faculty Of Civil engineering department BMCET,SURAT.
CLIC Civil Engineering Update
Experimental hall design in Japanese site
October 2004 Through September 2005
Americas KlyCluster Cost Analysis Overview
$150K Chicago/ANL seed funding for Braidwood site investigation
Architecture, Interior and Project management consultant
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
5th FCC Infrastructure & Operation meeting
Visit for more Learning Resources
Detector hall in mountain regions
(Additional materials)
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF TUNNEL PROJECTS
Arch205 Materials and building construction 1 foundation
Wood Structures Topic 8 Quality Workmanship
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Arch205 building construction foundation
Drill cuts used in underground mines
REVISION 1 1. Foundations.
Detector hall in mountain regions
Extract from today’s talk given to DCB
Engineering Geology I (GED355) S
Far Experimental Hall Hutches Civil Construction
P ROJECT M ANAGEMENT Skills.
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall - Hutches
Construction Considerations
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Department Of Energy Review Linac Coherent Light Source Project
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Life Cycle Costing.
Presentation transcript:

Civil Construction in the US Chris Laughton, Fermilab Theta 13 San Luis Obispo Workshop

Theta 13 San Luis Obispo Workshop Outline Sites Under Consideration West Coast Midwest Scope Cost & Schedule Contingency Next Steps Theta 13 San Luis Obispo Workshop

Sites Under Consideration West Coast Diablo Canyon* Midwest Braidwood* Byron ~ overburden requirements would place detector halls in weak sandstone. Dolomite and sandstone tunnels would be below the water table. LaSalle ~ similar site conditions to Braidwood. Wolf Creek ~ sited in shales and limestones. Diablo Canyon-Type Portal Entrance * Scoped and Estimated Theta 13 San Luis Obispo Workshop

Scope Underground Construction Braidwood 2 Vertical Shafts - 10m Ø & 120m deep 1 Tunnel - 300m long 8m span horseshoe tunnel. Uniform 1% tunnel gradient to shaft. Firewall-Isolated Excavations accessed from the Running Tunnel/Shafts 3 Detector Rooms 1 x Near Detector Room - 32 m long 12 m span 2 x Far Detector Rooms with 8 m span access tunnels - 16 m long x 12 m span 1 Underground Emergency Refuge (at end of tunnel) 6 m long 4m span separately ventilation 2-hour fire rated wall Utility/Sump Room 4 m horseshoe nominal 8m length Diablo Canyon 1 Portal Entrance -10 m long 1 Tunnel - 850m long 6m span horseshoe tunnel. Uniform 1% tunnel gradient to portal. Firewall-Isolated Excavations accessed from the Running Tunnel 2 Detector Rooms 2 x 40m long 10m span chambers 1 Underground Emergency Refuge Nominal 6 m long 4m span Equipped with 2-hour fire rated wall and self-rescuers Theta 13 San Luis Obispo Workshop

Scope “Finish-Out” - Similar for Both Sites Single continuous concrete floor Hilman roller rails embedded (except in refuge) Cable Trays Pipe Stands Utilities in place at beneficial occupancy at both sites light string, ventilation ducting and fans refuge firewall At Braidwood Flood barrier at Far Detector site (1 m high concrete blocks) Pumps (Goodman quote) Elevators (Alimak quote) Shotcrete Finish Walls & Crown Theta 13 San Luis Obispo Workshop

Scope Ground Conditions (assumptions pending site investigation) Braidwood Soils ~ 20 m of saturated soils Rock (Various Units) Coal measure strata Limestone with shale (NuMI - Fort Atkinson) Shale (NuMI - Scales) Galena Platteville (Dolomitic Limestone or Dolostone) Notable question marks relating to: Deep water table elevation? In situ stress levels? Swelling potential of rock units containing clay minerals? Etc.. Diablo Canyon Minimal Soil/Weathered Rock Rock (Mainly Dolomitic Sandstone) Heavily deformed geologic structure (folded/faulted) Inter/Intra-bedded volcanic sills (altered basalt, tuffs..) Surface rock samples have tested to ~ “high strength” Thin chert stringers present (highly abrasive micro-silica) Notable question marks relating too: Structure at depth- what’s where? Abrasive cherts - roadheader impact Blocky rock behavior at depth Altered basalt behavior at depth Etc.. Theta 13 San Luis Obispo Workshop

Scope Excavation Methods & Means Braidwood Drill and Blast appears to be the preferred excavation method - short tunnels of varying cross-sections sited in relatively strong rock units Permanent Tunnel/Room Support Rock Bolts Reinforced Shotcrete Permanent Shaft Support provided by cast-in-place concrete lining Diablo Canyon Drill and Blast used for initial estimate - based on high strengths of surface-gathered samples (Viability of mechanical excavation will be reviewed after a modicum of site investigation has been performed) Permanent Tunnel/Room Support Rock Bolts, Lattice Girders Reinforced Shotcrete Shotcrete Scoop Tram Drill Rig Theta 13 San Luis Obispo Workshop

Cost & Schedule The Estimating Process Proposal should be based on a reliable cost estimate. “The only kind of estimate that is worth anything is the one that is clearly defined on paper and bears the signature of the author.” J.S.Redpath, (1980). Theta 13 has underground estimates that are: Well-documented and site-specific - developed “from the bottom up” Estimated independently by an experienced, tunneling professional. Reviewed independently by experienced, tunneling professionals. Underground estimate scopes include: Underground Structural Shell and Utilities Utilities left in place (power, ventilation, water, air lines, communication..). Permanent facilities installed (groundwater pumps, elevators and refuge firewall, surface water treatment facilities). Estimates exclude: Engineering, Design, Inspection and Administration (EDIA), Surface Buildings, Technical Installations, Life Cycle Costs Theta 13 San Luis Obispo Workshop

Cost & Schedule Aims of the Estimating Process Objectives Reduce uncertainty in cost/schedule data collected/reported in early work. Deliver a schedule and estimate by Mid-March. Outcome Consulted directly with tunnel estimators to obtain site-specific products, that met the deadlines at a relatively low unit cost: ~ $10k Tunnel Cost Estimating Consultants (Hilton, Sperry & Wightman) vs. ~ $15-20k Outside Tunnel Design Companies (CNA, HMM & Jacobs Ass.) & ~ $40k In-House Engineering Group Established Solid Basis for Future Planning Experimental scoping and proposal development Reviews (Constructability, Value Engineering, Contract Strategies) Site investigation work Minimize potential for claims of “low-balling” - that may have surfaced if “ball-park” numbers had been used Cost better understood -> Can plan with more confidence Theta 13 San Luis Obispo Workshop

Cost & Schedule Review of the Unit Cost Data Sets Sources: tunnel contractors, designers and consultants Re-sorted for sub-horizontal, 4 - 8m span rock tunnels Mined in last ten years by TBM, D&B or RH methodology Hard abrasive or very soft host rocks eliminated Cost “as reported/quoted” as a final cost per linear distance (auxiliary structures included) Wide Range of unit costs $3k to $12k/linear foot Average of 27 case histories ~ $5k/linear foot Lowest unit costs in longer TBM tunnels (uniform mining/ground conditions/”good” TBM-systems, ref. Fermilab-Robbins R&D) Highest unit costs in shorter drill and blast/roadheader tunnels (variable mining/ground conditions poor systems) Theta 13 San Luis Obispo Workshop

Cost & Schedule Need for a Site-Specific Estimate Wide range in unit prices underlines need for a site-specific estimate Costs ƒ(wage rates, craft skills, craft availability, infrastructure, support services, taxes, climate, local customs and methods, local support/opposition to the project, etc…) Costs ƒ(ground conditions….) In tunneling a trend noted towards fewer bids/less competition: Contractors are leaving the business -> too risky Contractors are working at full capacity -> too busy Contractors are joint venturing -> too risky Nowadays expect fewer bids Unit prices are Site-Specific & Time Specific - Braidwood & Diablo Canyon unit pricing can be used for the sites but should not be used on other sites and should be checked periodically. Theta 13 San Luis Obispo Workshop

Cost & Schedule Bottoms-up Estimates’ Bottom-lines Braidwood Duration 39 months “First” detector site delivered in17 or 20 months (far or near) Cost $34.6M General Mobilization ~3.3M Shafts ~ 15.9M Tunnel ~ $9.1M Detector Rooms ~ $6.0M Refuge ~$0.3M 40% contingency. Initial comments: equipment selection, crew sizing and productivity OK. Shorter shafts could use cranes. Diablo Canyon Duration 24 months Cost $23 M General Mobilization ~$2.9M Portal Cost ~$0.3M Tunnel ~ 16.5M Detector Rooms ~$3.2M Refuge ~$0.1M 30% contingency. Initial comments: equipment selection, crew sizing and productivity OK. Some relatively conservative production factors - mucking might be done more quickly. Theta 13 San Luis Obispo Workshop

Contingency Underground Construction Many ways for a tunnel project to go wrong (not just a issues of differing conditions!) Make sure cost and schedule expectations are realistic at the outset and kept that way for the duration of the project. Risks needs to be identified, mitigated and properly documented/communicated. Even if the ground is expected to be perfect early construction contingencies need to be at least 25% range. Theta 13 San Luis Obispo Workshop

Contingency Status of the US Proposals Basis of Estimate. Guesswork based on limited desk study of regional data sets. • We do not know for sure what is there because we haven’t looked yet! • Can’t mitigate what has not yet been identified! • Contingency Allocated Rock mass characterization, alignment and estimate assumptions are subject to review after site-specific investigation work is performed Localized studies and site-specific investigation is a pre-requisite to support the advancement of the underground design Theta 13 San Luis Obispo Workshop

Next Steps Site Investigation Engineering Tasking and Organization Reviews Making contact with design and contracting companies who can support the engineering, reviews - individual consultants will also be of value (notably where contracting rules are challenging!). “Natural” Tunnels (Spooner’s Cove) “Man-Made” Tunnels (Neutrinos @ Main Injector) Theta 13 San Luis Obispo Workshop

Next Steps Site Investigation Braidwood (w/Exelon) Desk Studies ISGS support - others? Field Work @ Braidwood @ Other local rock/soil sites Initial Shaft Site Selection Avoid any surface and buried obstructions etc. Drilling Campaign ~ Coreholes along shaft centerlines Diablo Canyon (w/PG&E) Desk Studies LBL Earth Science Support ~ complete Field Work @ Diablo Canyon site @ Other local rock sites Initial Tunnel Site Selection Portal Location, Tunnel Alignment Drilling Campaign ~ Directional drilling ~ Seismics @ Portal Theta 13 San Luis Obispo Workshop

Next Steps Engineering Task Definition Initial Organizational Steps Site Investigation Work package(s) Plan Engineering Tasks (Discipline:Task Matrix) Outside Support Scope/Contractor Selection/Contracting What can’t we do in-house? Who do we need to help? How do we find them? Develop some familiarity with Beavers, Groundhogs and Moles. Contracting Strategies (risks allocation/sharing) Design-Build (D-B) Engineer-Procure-Construct (E-P-C) etc.. Schedule and WBS Development Availability of other Resources Theta 13 San Luis Obispo Workshop

Theta 13 San Luis Obispo Workshop Next Steps Reviews Requirements Definition (underground site visits) Make sure we are not asking for more than we need Define “acceptable conditions” e.g. moisture/floor movement (avoid over-design & specification) Constructability Reviews Look for easier, practical ways of performing the work Value Engineering Reviews Once scope, costs and risks are well-defined investigate and estimate alternate ways of achieving the same end Theta 13 San Luis Obispo Workshop

Theta 13 San Luis Obispo Workshop Next Steps Find Reviewers, Designers & Builders (Beavers, Groundhogs & Moles) Tunnel Designers CNA* Condor Earth Technologies* Hatch Mott MacDonald* Jacobs Associates* Montgomery Watson Harza* Parsons Brinckerhoff* Parsons Engineering* URS* etc.. National Tunnel Contractors Affholder, Atkinson, Frontier-Kemper Kenny Construction, Kiewit Construction, Obayashi, Traylor Brothers, etc.. Local (Ca) Wine Cavers Alf Burtleson, California Wine Caves, Magorian, Nordby Wine Caves*, Glen Ragsdale, etc. Partial listings * SOQ Provided/Promised Theta 13 San Luis Obispo Workshop