Pre-Contract Cost Control

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
ROOM DATA SHEETS For Medical Projects using the data available from the NHS Activity Database (ADB) © Workface Solutions 2004.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
PPT-Lecture Example Here below is a short example how I use Powerpoint for lecture presentation. Sometimes music and animation are used to invoke a better.
Kaj Jørgensen, Aalborg University, Department of Production and Jørn Skauge, School of Architecture Aarhus, Department of Architectural Design Building.
7 Set of Floor Plans Primary Considerations
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
Topic C1 Superstructures - walls
Tackling the Assignment GROUP 3 – B.J. DAYAL, F.A. GRADINARU, P.I. IPIPI-AMANI, R.J. MANNING, M.S. ROBERTS, M. VAHORA.
What are the Main ARCHITECTURAL PLANS/ DOCUMENTS
HVACR116 – Trade Skills Mechanical Drawings.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 11 Improvement Analysis.
Building Codes and Interior Design
drawings DRAWINGS DIFFERENT TYPES ? Architects working drawings Block Plan Site Plan General Location Plan Detail Drawing component part drawing.
ELEMENTAL COST ANALYSIS (ECA)
ARC 810: Building Climatology Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 810: Building Climatology Department of.
Types of Buildings for Explosives Storage MA02 Slide 1.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
PRELIMINARY DRAFT EXCERPT RECOMMENDATIONS ON MEASUREMENT AND VERIFICATION METHODS IN THE FRAMEWORK OF DIRECTIVE 2006/32/EC ON ENERGY END-USE EFFICIENCY.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
Architecture Supported by:
Fundamentals of Construction
“kicking on to the finish”
The Design Team Carl James.
Major Steps In Building a SFR
How Completed Interiors Are Achieved: Designing & Building
Heating Ventilation and Air Conditioning
Architecture, Interior and Project management consultant
Construction Documents
Curriculum for Excellence
RIBA Plan of Work 2013.
Energy Efficiency for Ashton Hayes
Earthquake effects on health care facilities
ACOUSTIC DESIGN OF BUILDINGS
Fundamentals of Construction GTT – Unit 7 – Green Architecture
COST PLANNING AND ESTIMATION
COST PLANNING AND ESTIMATION
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-Contract Cost Control
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Designing the tiny house
PREPARATION FOR WINTER
INTD 405 Modern Practices in Interior Design PLANS
INTD 405 Modern Practices in Interior Design PLANS
Chapter 19 Electrical Plans.
Building Construction I Sofia Sebastian 1
How & When to Get Permits for Work in Your Home
Building Drawings.
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
The Asset Management Journey for Building Assets
Introduction.
Value of contract: Length of contract: Contract start date:
Quantities and Price.
Quantities and Price.
Value of contract: Length of contract: Contract start date:
14 Crow Hill Rise, Mansfield
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
Poswillow Suite, Children's Dental Unit
Eaton MEDC, Sutton-In-Ashfield
Wbs, CONTRACTORS & GIVING A BID
RIBA Plan of Work 2013.
RIBA Plan Tom Robinson sir david Swindells Vii
Value of contract: Length of contract: Contract start date:
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Advancd Measurement and Contract Administration
Presentation transcript:

Pre-Contract Cost Control Building Cost Information Service Analyses are compiled from tendered works across the UK Database – The largest single source of data presented in elemental format Elemental breakdown of submitted information Includes EUR – Element Unit Rate and EUQ – Element Unit Quantity figures May include design and drawing information

Factors to consider in selecting a historic cost data Pre-Contract Cost Control Factors to consider in selecting a historic cost data Building function (e.g. residential, factory, hospital, etc) Type of work (e.g. new build, extension, refurbishment) Number of storeys (1, 2, …10 storeys?) Location Date Type of analysis (group or detailed elemental analysis)

Adjusting the historic cost data for time, location, etc: Pre-Contract Cost Control Adjusting the historic cost data for time, location, etc:

Adjusting the historic cost data for time, location, etc: Pre-Contract Cost Control Adjusting the historic cost data for time, location, etc:

Pre-Contract Cost Control Detailed Elemental Cost Plan It aims at setting cost targets for the respective elements to guide decision making during the detail design stage It provides the client with an awareness of the cost implications of all design decisions Where a cost check reveals differences in the elemental cost targets, either of the following actions may have to be undertaken: Redesign the element to meet the target cost Approve the change but redistribute costs of other elements by re-examining other cost saving methods Approve the change and accept that the total cost of the project will increase It helps in highlighting any discrepancies in the tenders for the project

The elemental costs may be expressed in 3 ways The total cost Pre-Contract Cost Control Detailed Elemental Cost Plan The elemental costs may be expressed in 3 ways The total cost Cost per sq meter of GIFA The element unit rate Ref attached sample from Ashworth A. (1999) pg 292 It is imperative to adjust the detailed elemental cost plan to reflect Design and specification variables in terms of: Quantity Quality

Detailed Elements Substructure Superstructure Pre-Contract Cost Control Detailed Elements Substructure Works up to the underside of lowest floor finish including damp proof course (dpc) Superstructure Frame Upper floors Roof Stairs External walls Windows and external doors

Internal finishes Detailed Elements Superstructure Pre-Contract Cost Control Detailed Elements Superstructure Internal walls and partitions Internal doors Internal finishes Wall finishes Floor finishes Ceiling finishes Fittings and furnishings Fittings, fixtures and furniture Soft furniture Works of art equipment

Detailed Elements Services Sanitary appliances Services equipment Pre-Contract Cost Control Detailed Elements Services Sanitary appliances Services equipment Disposal installations Water installations Heat source Space heating and air treatment Ventilating systems Electrical installations Gas installations Lift and conveyor installations Protective installations Communication installations

Detailed Elements External works Pre-Contract Cost Control Site works Drainage External services Minor building works

Where TPI is the tender price index Pre-Contract Cost Control Adjusting the historic data: E.g. Adjusting for Time (Inflation) Current TPI Base cost/m2 Current cost/m2 TPI at Base Date = x Where TPI is the tender price index

Where TPI is the tender price index Pre-Contract Cost Control Adjusting the historic data: E.g. Adjusting for Time (Inflation) Alternatively Current TPI TPI at Base Date Base cost/m2 Current cost/m2 - = x Where TPI is the tender price index Base cost/m2 +

Pre-Contract Cost Control Recommended reading Ferry D J, Brandon P S & Ferry J D (1999) Cost Planning of Buildings, Blackwell Publishing – chapter 16 Aqua Group (2003) Pre-contract practice and Contract Administration – chapter 4 Jagger et al (2002) Building Design Cost Management, Blackwell Science - chapters 6 – 10 Seeley I H (1996) Building Economics – chapters 6- 10