Oak Ridge National Laboratory

Slides:



Advertisements
Similar presentations
Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska.
Advertisements

eQuest Quick Energy Simulation Tool
Heating, Ventilating, and Air-Conditioning
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Geothermal Heat Pumps in residential and commercial HVAC systems Dan Winters 4/18/11.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
District Energy Corporation Sustainable Project SW 40 th Thermal Energy Facility To Serve the New Lancaster County Adult Detention Facility April 2011.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
Important variables Water: Air: Conversion:
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
Name of Building(s) or Project Speaker(s) Organization(s)
1 Lamp operating factor Published lumen output is based on laboratory conditions Voltage  Rated at line voltage of 115V Standard reactor ballast  Electromagnetic.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Class Project Report Sustainable Air Quality, EECE 449/549, Spring 2009 Washington University, St. Louis, MO The Energy Analysis and Carbon Footprint of.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Energy Plus & Open Studio Class
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Geothermal Heating and Cooling Applications Rachel Kerekgyarto.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
Domestic Hot Water Recirculation Design
January 12, 2017.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Harley-Davidson Museum
The Data Center Challenge
Objectives Talk about the final projects Discuss HW2 and HW3 problems
Grunenwald Science and Technology Building
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Energy Efficiency in District Coiling System
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
HCB 3-Chap 19A: All-Air Systems_Single Zone
Abbas Shirian, PE Certified GeoExchange Designer
Case Study: Marks & Spencer Oxford Street
Lecture Objectives: Discuss HW4 parts
Calibrated Energy Models: One New Change
Objective Revie the Cooling Cycle Learn about air distribution systems
Michigan Energy Summit | April 25, 2019
Heat Pumps Reference: BSRIA BG7 / 2009.
Presentation transcript:

Oak Ridge National Laboratory Comparative Analysis of the Life Cycle Costs of Geothermal Heat Pumps and Three Conventional HVAC Systems for an Elementary School in Lincoln, Nebraska John A. Shonder Michaela A. Martin Patrick J. Hughes Oak Ridge National Laboratory

Project Background Four new, identical 69,000 ft2 elementary schools were built in 1995 in Lincoln, Nebraska The decision to use geothermal heat pumps based on life cycle cost comparison using another school in the district Pre-construction estimates contain a great deal of uncertainty. Would actual performance would bear out the initial assumptions, and confirm the technology selection?

Objectives of the study Use site-monitored energy use data to develop a calibrated simulation model of one of the schools Implement GHPs and three alternative HVAC systems to determine annual energy and water use Use maintenance data from the school district to estimate annual maintenance cost for each alternative Develop estimates of installed costs for each alternative Determine life cycle cost of each alternative

Maxey Elementary School

Floorplan of the School

GHP System Design Total of 54 GHP units 200 tons total nominal cooling capacity Peak block loads: 150 tons / 940,000 Btu/hr Two 15-ton units provide pre-conditioned OA (ASHRAE 16-1989) with HW coil for cold days Gymnasium, cafeteria also introduce OA (40-45%) Remaining units (1.4 - 4.5 tons) draw return air from corridors, and supply classrooms, offices, etc. Unit heaters in corridors with HW coils Four 333,000 BTU/hr gas-fired boilers; gas DHW

Borefield Details 120 vertical loops using 1 in. HDPE pipe 12 by 10 pattern located under soccer field 20 ft. center-to-center spacing between bores Bore depth 240 feet (~140 ft/ton) Backfilled with fine gravel, bentonite plug top 10 ft. Designed for year-round occupation 22% (by volume) propylene glycol solution Variable speed pump

Extensive 10-min Interval Data Were Available from EMS/Utility Total building electrical use HVAC electrical use Compressor, reversing valve, and fan status for each of the heat pumps Flow rate, supply/return temperatures for borefield Zone temperatures, outdoor air temperatures Monthly natural gas use All in varying stages of completeness

Maintenance Data Available Lincoln school district provided access to complete maintenance database (preventive and unplanned) 18 schools selected (all with > 70% cooled floorspace) 4 categories of heating/cooling plants 4 Geothermal heat pumps (GHP) 2 Air-cooled chiller/gas-fired HW boiler (ACC/GHWB) 12 Water-cooled chiller/gas-fired HW boiler (WCC/GHWB) of which 9 were VAV Ages of cooling plants: 3 to 32 years Ages of heating plants: 3 to 70 years Analysis of this data presented in two ASHRAE papers

Study is based on a calibrated simulation Developed simulation model beginning with as-built construction plans Estimated internal loads from occupancy, fixture counts Developed occupancy schedule based on school calendar “Tweaked” the model (adjusting infiltration) until performance matched site-monitored data (daily electrical use, monthly gas use)

Simulated and monitored daily HVAC electrical use

Simulated and monitored monthly total natural gas use

Predicted and Monitored Minimum Monthly EWT

Predicted and Monitored Maximum Monthly EWT

Alternative systems were dictated by available maintenance data Air-cooled chiller, VAV air handling system, gas-fired hot water boiler Water-cooled chiller, VAV air handling system, gas-fired hot water boiler Water-cooled chiller, constant volume air handling system, gas-fired hot water boiler (unlikely to be installed in a new school)

Comparison of total energy use

Comparison of HVAC energy use

Estimating maintenance costs was somewhat problematic Wanted to determine first-year maintenance cost and rate of cost increase for each alternative Only 18 systems in database (4 GHP, 2 ACC/VAV, 3 WCC/VAV, 9 WCC/CV) Not enough data to perform a statistically significant analysis Alternative sources generally unreliable

Data for most numerous system type (WCC/CV)

Values appeared reasonable

How maintenance costs were estimated Assumed maintenance costs for all systems rose by 1.5% per year Calculated initial year maintenance cost on this basis GHP: 9.0 ¢/ft2 ACC/VAV: 9.5 ¢/ft2 WCC/CV: 16.6 ¢/ft2 WCC/VAV: 9.7 ¢/ft2

Developed independent cost estimates for each system Capital costs were estimated for each system by staff estimators, without reference to actual installed cost Estimates then given a “reality check” by an experienced estimator familiar with school HVAC systems (including geothermal) Estimates also compared to published square foot cost estimating guides

Capital cost estimates for the four systems

Things to note about the capital cost estimates Based on published figures for schools, the estimates appear reasonable Excluding the constant volume system, geothermal has the lowest first cost A cost of $9.45 per square foot was published for the geothermal systems. We were unable to determine what was included in this estimate School district’s accounting system does not separate out the cost of HVAC from the entire school cost.

Inputs for the life cycle cost analysis Energy use for each system based on calibrated simulation models Local Lincoln, Nebraska rates (gas, electric and water) used to calculate utility costs Maintenance costs based on Lincoln School District database  first year + annual escalation Capital costs of HVAC systems based on estimates performed by staff cost estimators Real discount rate of 3.1%, DOE energy cost projections, 20 year equipment life

Comparison of life cycle costs

Results of the analysis Lincoln school district made the correct decision in installing GHPs in these four schools Over 20 year life, GHPs have the lowest life cycle cost -- about $230,000 less than the next most economical technology First cost is the most important factor in the analysis, followed by energy costs and maintenance costs. Maintenance costs of GHPs in this district are marginally lower (about 6%) than the cost of maintaining VAV chiller/boiler systems.

Results of the analysis GHPs have the lowest annual operating costs Of the system types commonly installed in schools, GHPs also have the lowest first cost Reduced energy use reduces emission of greenhouse gases and other pollutants

Conclusions Obviously, these results apply only to the school examined They confirm that GHPs can cause significant reductions in energy use (17%) and energy costs (24%) They also counter some of the myths about GHPs: No “cost premium” in this case. GHPs have lower first cost Maintenance costs comparable with other common technologies