PBN development in France

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
ICAO EUR/NAT PBN Regional Implementation
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Overview of Continental En-route Navigation Specifications
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Javier Perez Diestro Air Navigation International Director
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
PBN Plan Development Aviation Industry Forum 18 November 2009.
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
Area Nav: RNP Evolution
PBN IMPLEMENTATION IN THE SAM REGION
Performance Based Navigation
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Regional PBN Policy Len Wicks Regional Officer ATM, Asia and Pacific Office International Civil Aviation Organization (ICAO) PBN Seminar 8-10 June 2015,
Performance Based Navigation Aviation Industry Forum 18 November 2009.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
1 IATA / Airline Views on Performance Based Navigation Theo van de Ven/KLMAnthony van der Veldt/IATA Senior Manager Strategy & User ChargesAsst Dir Safety.
EUROCONTROL European Organisation for the Safety of Air Navigation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
1 Dave VanNess Implementation and Resource Development Coordinator Performance Based Navigation Programme ICAO, Montreal Dave VanNess Implementation and.
UK Performance-based Navigation (PBN) Implementation Status
PBN Performance Based Navigation
FAA NAVAID Rationalization / Resiliency Overview
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
PlaneWrong AGM Thursday 13th October
Introduction to Navigation Specifications
Overview of Continental En-route Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Workshop on preparations for ANConf/12 − ASBU methodology
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Regional RAIM Prediction System – Progress Report
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Workshop on preparations for ANConf/12 − ASBU methodology
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
EGNOS Implementation status in Europe
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
RNAV and RNP Strategy in Japan
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
LSSIP Objective AOP03.
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

PBN development in France Introduction Situation in a pre-PBN context DGAC adherence to the PBN applications Future developments to be considered Conclusion

PBN development in France Introduction (1/3) Development of RNAV procedures based on operational needs but, sometimes, not fully standardised principles Implementation of RNAV procedures in Paris TMA (since 1992 with RWY28 eastbound SIDs in Charles de Gaulle… MOSUD arrival in 1997…DOMUS and VASPO arrivals) Reinforcement of RNAV procedures in Paris TMA in 2001 (predicated on “B-RNAV+”), then in Montpellier, Lyon.

PBN development in France Montpellier departures 13L/31R (B-RNAV+)

PBN development in France Introduction (3/3) Procedures developed as “B-RNAV+” applications BRNAV + additional requirements (temporary provisions included in AIP GEN 1.5-2 and ENR 1.5-4/ October 2001), « B-RNAV+ » procedures must be above MRVA and developed in a radar environment Operational directive issued by our flights standards (N° 2001/1 5 September 2001) wrt « Basic Area navigation (B-RNAV) in terminal area». Regulatory framework well defined... But French In order to prevent this kind of situation, integrated initiative driven by Eurocontrol for standardisation of RNAV in TMA The PBN offers a general, global and awaited standardisation for RNAV operations Avant-dernier point : Regulation changed to prevent development of thos not standardised

PBN development in France DGAC adherence to the PBN applications (1/7) – En-route and TMA En-route : RNAV 5 (B-RNAV) One of the applications described and standardised a long time ago B-RNAV in ECAC since 23d April 1998 (FL245 then FL115 in France) Great benefits provided extension questioned TMA : RNAV 1 (P-RNAV) Safety (harmonisation being one of the objectives) Noise abatement… Possible applications below MSA/AMSR Possible applications above MSA/AMSR Conventional Procedures (non RNAV) OR Conventional Procedures (non RNAV) OR RNAV procedures with P-RNAV capability P-RNAV capability OR RNAV procedures (en-route-criteria design) with B-RNAV capability

Nice departures 04L/R P-RNAV SID INITIAL P-RNAV SID VISUAL APPROACH (helicopters)

PBN development in France DGAC adherence to the PBN applications (3/7) – En-route and TMA Approach French decree dated July, 24th, 2007 already refers PBN applications (RNP 4, Basic-RNP 1, RNP APCH and RNP AR APCH, RNAV 10, RNAV 5, RNAV 1 and 2). Once AMC20-16 available, transition to PBN terms Implementation plans (AIC) : LOCATION IMPLEMENTATION DATE DETAILS Nice Côte d’Azur (LFMN) March 2008 Departures Montpellier Méditerranée (LFMT) 2d quarter of 2008 - Replacement of “B-RNAV+” - Later, modification of RWY13 arrival Lyon-Saint Exupéry (LFLL) 2d or 3d quarter of 2008 Beauvais-Tillé (LFOB) South departures Figari Sud Corse (LFKF) Departure to LFKB Toulouse-Blagnac (LFBO) Between last quarter of 2008 and first half of 2009 SID 32, STAR14 Paris (LFPG, LFPO, LFPB)

PBN development in France DGAC adherence to the PBN applications (4/7) – Approach RNP APCH : Paris CDG assessment by Air France Lateral and vertical deviations at A/P disconnection 95 % box Vertical deviation (°) Assessment since 2002 with more than 7000 approaches Lateral deviation (m) RNP 0.1 Data provided by Air France

PBN development in France DGAC adherence to the PBN applications (5/7) – Approach RNP APCH Published procedures Saint Pierre RWY08 et RWY26 Lyon-Bron RWY12 Lille-Lesquin RWY08 Cayenne RWY08 et 26 Limoges RWY04 Brest RWY08 Hyeres RWY05 Melun RWY29 Biarritz RWY09 Calvi RWY18 Procedures being or yet studied (to be published) Perpignan RWY15 - Fort de France RWY27 et 09… Besançon (Hélicopters) - Clermont-Ferrand RWY26 Saint Denis Gillot RWY12 et 30 - Deauville RWY12 Saint Pierre Pierrefonds RWY15 Nuku Hiva Tikehau Rangiroa Pointe-à-Pitre le Raizet RWY29 Figari RWY23 et 05

PBN development in France DGAC adherence to the PBN applications (6/7) – Approach Other developments foreseen : RNP APCH with baro VNAV and RNP AR RNP APCH with baro VNAV : implication of DCS (Flight standards) in the development of the future Acceptable Means of Compliance (AMC 20 XX) Revision of the vertical navigation performance specification of the PBN possibly needed ESARR 4 compliant safety case to be concluded this year by Eurocontrol? Working group to begin studies with DCS and DAST (regulator) after validation of the French ANSP, DSNA, of its involvement for this application In line with the European Convergence Implementation Plan (ECIP) and navigation strategy RNP AR Flight Operational Safety Assessment under the auspices of Eurocontrol DGAC, Eurocontrol, Air France, Airbus, Thales involved Objective is to demonstrate the TLS Perform an overall analysis : aircraft + crew procedures + design Analysis will focus on Normal, abnormal procedures, aircraft outages (FMS, A/P…), possible crew errors (altimeter setting), infrastructure outages,…

PBN development in France DGAC adherence to the PBN applications (7/7) – Approach Other developments foreseen : RNP APCH with baro VNAV and RNP AR RNP APCH with baro VNAV : Bastia as the assessment aerodrome (Current procedure below)

PBN development in France Future developments to be considered (1/1) Other developments will be necessary PBN to standardise GNSS approaches with vertical guidance APV/SBAS based on EGNOS of particular interest for France Systematic publication of APV/EGNOS approaches where RNP APCH are or are to be implemented (ECIP objective) Very important in a the challenging context of the 36th ICAO assembly decisions (July 2007) “all instrument runway ends should have an approach procedure with vertical guidance (APV), either as the primary approach or as a back-up for precision approaches by 2016 with intermediate milestones as follows: 30 per cent by 2010, 70 per cent by 2014.”

PBN development in France Conclusion DGAC in line with the will to standardise RNAV applications through the PBN PBN implementation plan in place by 2009 Some PBN applications already implemented Consistent with Eurocontrol navigation strategy DGAC, through its experts, to support future developments of PBN