Business, Cost Estimating & Financial Management Considerations

Slides:



Advertisements
Similar presentations
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Advertisements

DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Lesson Objective Summarize the relationship between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Product Support Strategy Demonstrated Performance
New Space Systems Acquisition Policy
Workshop Schedule Welcome and Workshop Overview
DAG CH 3 Figure 11: Weapon System Development Life Cycle
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
A B C Solution Analysis Technology Maturation & Risk Reduction
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Product Support Strategy
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
Product Support Strategy Demonstrated Performance
The Department of Defense Acquisition Process
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Business, Cost Estimating & Financial Management Considerations CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA Business, Cost Estimating & Financial Management Considerations BCEFM Activities Receive AoA guidance from CAPE Participate in AoA Create affordability assessment for MS A Justify full funding in FYDP by MS A Complete 2366A determination (MDAP only) Budget request vetted in PPBE process Budget request vetted in Congressional enactment process Establish TMRR RDT&E PE Prepare CARD Prepare Service cost position Prepare ICE or sufficiency review or EA (IS systems) Update affordability assessment for MS B Full funding in FYDP by MS B 2366B certification by MS B (MDAP only) Establish EMD RDT&E PE Develop/update program funding reports Update budget documents (e.g., R forms) Develop Spend Plan (O&E Forecast) Complete LCCE Update cost estimate Execute should cost program Full funding in FYDP Establish procurement budget line item Establish sustainment funding line item Update affordability assessment Update budget documents (e.g., P&R forms) Update LCCE Update procurement budget line item Update sustainment funding line item Update budget documents (e.g., P&O forms) Trades Studies may include: Training Systems Requirements Analysis Training Situation Analysis Manpower Estimates Economic Analysis Documentation and Reviews Acquisition Strategy Draft CDD Initial inputs to PPP, SEP, TEMP, & LCSP Inputs to RFP Mid-year Review Year-End Close-Out CDD Update PPP, SEP, TEMP, LCSP SAR/MAR (as appropriate) RAM-C Report PDR, ILA, IPA CPD CDR, ILA, IPA ISR PIR

AoA: Analysis of Alternatives CAPE: Cost Analysis & Program Evaluation CARD: Cost Analysis Requirements Description CDD: Capability Development Document CDR: Critical Design Review CPD: Capability Production Document DEF: Defense Exportability Features EA: Economic Analysis EOA: Early Operational Assessment FOC: Final Operational Capability FOT&E: Follow-on Test & Evaluation FRP: Full Rate Production FYDP: Future Years Defense Program ICD: Initial Capabilities Document PE: Program Element PIR: Post-implementation Review PPBE: Planning, Programming, Budgeting, & Execution PPP: Program Protection Plan RDT&E: Research, Development, Test & Evaluation RAM-C: Reliability, Availability, Maintenance-Cost RFP: Request for Proposal SAR: Selected Acquisition Report SEP: System Engineering Plan TEMP: Test and Evaluation Master Plan ILA: Independent Logistics Assessment IOC: Initial Operational Capability IOT&E: Initial Operational Test & Evaluation ICE: Independent Cost Estimate IPS: Integrated Product Support LCCE: Life Cycle Cost Estimate LCSP: Life-Cycle Sustainment Plan MAIS: Major Automated Information System MAR: MAIS Annual Report MDAP: Major Defense Acquisition Program MDD: Materiel Development Decision O&E: Obligations and Expenditures OA: Operational Assessment PDR: Preliminary Design Review