1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January 22-24 2013.

Slides:



Advertisements
Similar presentations
Systems Engineering Breakouts George Angeli. Tuesday 11am Current Commissioning Plans – Chuck Claver Revised commissioning timeline Development plans.
Advertisements

1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
P09004 Eye Tracking. Engineering Analysis Reviewing manuals for Single Board Computer Looking at various mounting methods for cameras Preliminary.
1 LSST: Dark Energy Tony Tyson Director, LSST Project University of California, Davis Tony Tyson Director, LSST Project University of California, Davis.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Building a Framework for Data Preservation of Large-Scale Astronomical Data ADASS London, UK September 23-26, 2007 Jeffrey Kantor (LSST Corporation), Ray.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
SLAC June Gpix Camera Camera DAQ/Control System SLAC Program Review T. Schalk CCS team.
Safety Council Meeting Tucson Arizona 10 – 11 April Safety Council Meeting Tucson Arizona 10 – 11 April 2014 LSST Project Status Victor L. Krabbendam.
Introductory notes AGENDA 1)Science requirements – Stefano 2)System requirements – Andrea 3)Software requirements/Science cases - Joe/Gino/All 1)Scheduling.
Key Performance Metrics and End-to-End Testing
Control Software Integration German Schumacher T&S Software Lead.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Monday Morning J. Sebag T&S Systems Engineer. Close Past… 2 M1M3 acceptance and transportation to storage Reviews and RFPs (Dome, Software, Coating Plant,
LSST Scheduler requirements
The ALMA Software and Release Management Ruben Soto Software Operations Group & Release Manager Joint ALMA Observatory.
Telescope Integration and Tests Tuesday Afternoon.
LSST: Preparing for the Data Avalanche through Partitioning, Parallelization, and Provenance Kirk Borne (Perot Systems Corporation / NASA GSFC and George.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
The Active Optics System S. Thomas and the AO team.
Doing EPO Now. Constraints on use of MREFC (construction) funds During construction we can build infrastructure to enable EPO during operations, but not.
LSST VAO Meeting March 24, 2011 Tucson, AZ. Headquarters Site Headquarters Facility Observatory Management Science Operations Education and Public Outreach.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
LSST SLAC Office of Communications August 8, 2016 Communications Roadmap.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Status Update & Overview Charles (Chuck) Claver LSST System Scientist SAC Meeting March 5, 2017.
Large Synoptic Survey Telescope
Camera PDR/CD1 Planning 19 September 2008
Verification Matrix Process
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Education and Public Outreach goals and priorities
From LSE-30: Observatory System Spec.
Systems Engineering, Verification, and Commissioning for LSST George Z
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
Observing Modes: Nominal and Degraded
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
I&T&C Organization Chart
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
Requirements Basis Requirements of an Image Visualization System (IVS), to support the verification of the correct functioning of some components under.
What are DM folks working on?
SAFe Workshop - Oct 17 Presenter: Ray Brederode
Chuck F Claver LSST System Scientist & Commissioning Lead
OCS Scheduler Status Francisco Delgado T&S Software Manager
LDF “Highlights,” May-October 2017 (1)
HMSWeb – Handover Management System
Primary Mirror Control
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
DIGITAL LIBRARY.
OCS Scheduler Status Francisco Delgado T&S Software Manager
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Software Development Process
SLAC DOE Program Review
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Observatory Science Operations
Observatory Science Operations
Bird of Feather Session
Integration & Test Instrument Operations Coordination
Question 1: Contingency for “extra” year
Commissioning Data – Who and Why?
Presentation transcript:

1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January

2 Board Telescope & Site Tucson, Arizona July 18-20, 2011 DOE NSF WBS 1Project Management OfficeWBS 4Telescope and Site 1.00PMO Level 2 Milestones4.00T&S Level 2 Milestones 1.01LSST Program Management Office4.01Telescope System Management 1.02LSST System Engineering4.02Telescope System Engineering 1.03LSST Science4.03Summit Facilities and Infrastructure 4.04Dome WBS 2Data Management 4.05Telescope Mount 2.00DM Level 2 Milestones4.06Mirror Systems 2.01System Management4.07Wavefront and Alignment Sensing 2.02System Engineering4.08Calibration System 2.03Alert and Calibration Productions4.09Reflective Coating System 2.04Data Release Production4.10Observatory Control System 2.05Science User Interface and Analysis Tools4.11Telescope Control System 2.06Science Data Archive and Data Access Services4.12Utilities and Support Equipment 2.07Processing Middleware and Site Infrastructure4.13Base Facility and Infrastructure 2.08Communications and Base Site4.14Telescope Integration and Test 2.09Data Management System Integration and Test WBS 5Education and Public Outreach WBS 3Camera 5.00EPO Level 2 Milestones 3.00Camera Level 2 Milestones5.01System Management 3.01System Management5.02EPO Database and Data Access Services 3.02Systems Engineering and Design Integration5.03Infrastructure for Citizen Science 3.03Science Raft System5.04Classroom / Online Research Toolkit 3.04Corner Raft System5.05Visualization including Science Museums 3.05Optics5.06User Interfaces 3.06Camera Body and Mechanisms 3.07Cryostat WBS 6Commissioning 3.08Control System and DAQ6.00Commissioning Level 2 Milestones 3.09Camera System Integration and Test6.01Commissioning Management 3.10Camera Observatory Integration & Test6.02System Integration & Test 6.03Science Verification The LSST construction project WBS

3 Board Telescope & Site Tucson, Arizona July 18-20, 2011 Control Hierarchy

4 Board Telescope & Site Tucson, Arizona July 18-20, 2011 Observatory Control Components Facility Database Sensors Controllers & Devices Engineering Screens Operator Screens OCSTCS MountOpticsDome CCSDMS DDS Standard Communications Middleware Publish – Subscribe Interface / Quality of service set per topic

5 Board Telescope & Site Tucson, Arizona July 18-20, 2011 System Interfaces All dependencies represented Telescope & Site Camera Data Mgt. OCS EPO LSE-68 (images) LSE-69 (metadata) LSE-71 (control & telemetry) LSE-72 (control &. telemetry). LSE-73 (control & telemetry) telemetry command & control images LSE-74 (all telemetry) LSE-70 (all OCS protocols) LSE-75 (pointing & WCS) LSE-131 (catalogs & images) LSE-66 & LSE-67 (wavefront sensor – WFS & guider – GDS images)

6 Board Telescope & Site Tucson, Arizona July 18-20, 2011 OCS-Camera Software Interfaces in SysML LSE-71

7 Board Telescope & Site Tucson, Arizona July 18-20, 2011 Review Agenda (Preliminary) Requirements Review (GS, JS) – OCS Requirements Document – TCS Requirements Document – Presentation Architecture (GS) – Architecture Document – Presentation Communications Middleware (DM) OCS (Observatory Control System) (FD) – Design Document – Presentation TCS (Telescope Control System) (RC, GS) – Design Document – Presentation Interface Control Documents (GS, JS) – 19 Documents Resources (GS, JS) – Budget Document – Manpower Document Development Plan (GS, FD) – Software Development Tools – Schedule Document Data Management LSE-69 (LSE-68, LSE-78) LSE-75, LSE-76, LSE-77, (LSE-78) LSE-72, (LSE-70, LSE-74, LSE-78) LSE-131 Camera LSE-64, LSE-65, LSE-66, LSE-67, LSE-80, (LSE-18, LSE-68, LSE-78) LSE-71, (LSE-70, LSE-74, LSE-78) Telescope & Site LSE-73, LSE-132, (LSE-70, LSE-74, LSE-78) Observatory Control System (OCS) Education & Public Outreach (EPO) RC 2 mw FD 7 mw GS 7 mw