Breakdown Work Structure Applying Management Tools to a Project.

Slides:



Advertisements
Similar presentations
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Neil F. Albert MCR, LLC 12 May 2010.
Advertisements

S Y S T E M S E N G I N E E R I N G.
Software Quality Assurance Plan
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
© ABB AB, Corporate Research - 1 5/19/2015 abb Project Breakdown Structure Creation.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Work Breakdown Structures (WBS) Current: 14 January 2015.
Project Management Session 7
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
LSU 10/09/2007System Design1 Project Management Unit #2.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Manufacturing Engineering Department Lecture 1 - Introduction
The program work breakdown structure (WBS) establishes the essential
What is Business Analysis Planning & Monitoring?
Effective Methods for Software and Systems Integration
Work Breakdown Structure
Documenting Software Architectures
Project Management.
From Research Prototype to Production
1 Lecture 3.1: Project Planning: Work Breakdown Structure (WBS) [SEF Ch 9] Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 Lecture 5.2a: SEF Ch 8 SE Outputs Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Rational.
How the NCSX Project Does Business
Presented by: Presented By: MIL-STD 881 Update Neil F. Albert MCR, LLC 26 August 2010.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management TALS Draft Conceptual Solution February 24, 2004.
MENG 446 : Management of Engineering Projects
Project Management 6e..
Systems Development Life Cycle
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Project Management 6e..
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
IF 3507 Manajemen Proyek Perangkat Lunak
Systems Analysis and Design in a Changing World, Fourth Edition
Fundamentals of Information Systems, Sixth Edition
Modern Systems Analysis and Design Third Edition
Project Management -- Defining the Project
Work Breakdown Structure
Work Breakdown Structures (WBS)
Concepts and Definitions Work Breakdown Structures
Configuration Management and Layout Database ELENA Project
Dave Bachman DAU / CDSC September 9, 2004
PROJECT SCOPE MANAGEMENT
Defining the Activities
BSA 376 Competitive Success/snaptutorial.com
Chapter 10 Development of Multimedia Project
Work Breakdown Structure
Enabling System Elements
Modern Systems Analysis and Design Third Edition
Lockheed Martin Canada’s SMB Mentoring Program
MGT 605: CH 04 Defining the Project.
Modern Systems Analysis and Design Third Edition
Project Scope / Time / Cost
Project Management Process Groups
HART Technologies Process Overview
PLANNING & SCHEDULING (First Part)
Systems Development Life Cycle
Software Testing Lifecycle Practice
UNIT No- III- Leverging Information System ( Investing strategy )
Project Management Unit #2
Introduction to Project Management
Presentation transcript:

Breakdown Work Structure Applying Management Tools to a Project

Work Breakdown Structure (WBS) WBS: Defines the total system to be developed or produced. Relate the elements of work to be accomplished to each other and to the end product. Is displayed as a product oriented family tree composed of hardware, software, services, data and facilities which defines the total program. Standard: Mil Hdbk-881

ORGANIZATIONAL Provides Structure for Assigning Multi-Disciplinary Product Teams TECHNICAL Shows the System and its Subsystems as a Product Tree Product Tree aids: Interface Identification & Control Specification Development Provides a Structure: Work Assignment Material/Part Ordering Configuration Items must be traceable to WBS BUSINESS Provides Structure for Budgets and Cost Estimates Collect and Analyze Costs to track Budget Basic Purposes of Work Breakdown Structure

The Anatomy of a WBS A WBS has a Product Part and a Process Part. Product part of the system – Products delivered to the operational customer. – Design (Physical) architecture. Process part of the system – Efforts required to develop, produce and support products. – Execution of the IPT primary function process elements.

WBS Development Ensure all applicable work is represented. Enough levels provided to identify work packages for control purposes. (usually levels 0,1,2) Duplication of work eliminated. If too few levels identified - management visibility and integration of work packages may be difficult. If too many levels - too much time may be wasted in performing program review and control actions.

Level Zero- Overall System (derived from Functional level 0) The entire Program Example: EE321X course (Robots and C&C Essay) Level One- Subsystems (derived from Functional level 1) Major System(s) Examples: Recycling Robot (competition) – C&C Reflective Essay Level Two- Components (derived from Functional level 2) Subsystem(s): Recover, Move, Store, Sort ……, Research, Select, Reflect, Review, Draft, Write For Program Managers, levels 1-3 are of prime importance WBS Levels

Work Breakdown Structure Program (eg Aircraft System) Program (eg Aircraft System) Air Frame Engine Navigation L E V E L Z E R O L E V E L O N E L E V E L T W O Program Management/ Systems Engineering Program Management/ Systems Engineering Other services, data, facilities Other services, data, facilities Prime Mission Product (Air Vehicle) Prime Mission Product (Air Vehicle)

Air Vehicle Integration, assembly, test, and checkout efforts Systems engineering and Program management Systems engineering and Program management Training Data System test and evaluation System test and evaluation Peculiar support equipment Peculiar support equipment Common support equipment Common support equipment Operational and site activation Operational and site activation Industrial facilities Industrial facilities Initial spares and repair parts Initial spares and repair parts This combination of prime mission product and other supporting process elements constitutes a complete Work Breakdown Structure. Air Frame Engine Navigation Program Common WBS Elements

WBS - Defense Materiel Item Categories Aircraft / Helicopter systems Electronic / Automated Software systems Missile systems Ordnance systems Ship systems Space systems Surface Vehicle systems

Work Breakdown Structure Dictionary WORK BREAKDOWN DICTIONARY CONTRACT NUMBER Index Item No. 2 WBS Level 2 F C-0923 WBS ELEMENT A10100 WBS TITLE Air Vehicle Specification No. 689E DATERevision No.Revision AuthApproved Chg SPECIFICATION TITLE: Prime Item Development Specification For AGM 86A Air Vehicle/Airframe Contract Line Item: 0001, 0001AA, 0001AB, 0001AC, 0001AD 0001AE, 0001AF, 0001AG, 0001AH ELEMENT TASK DESCRIPTION Technical Content: The Air Vehicle element task description refers to the effort required to develop, fabricate, integrate and test the airframe segment, portions of the Navigation/ Guidance element, and Airborne Development Test Equipment and Airborne Operational Test Equip- ment and to the integration assembly and check- out of these complete elements, together with the Engine Segment, to produce the complete Air Vehicle. The lower level elements included and summarized in the Air Vehicle element are: Airframe Segment (A11100), Navigation/Guidance Segment (A32100), Airborne Development Test Equipment (A61100, and Airborne Operational Test Equipment (A61200) COST DESCRIPTION MPC/PMC Work Order/Work Auth A10100 See lower level WBS Elements Applicable SOW Paragraph: Cost Content - System Contractor The cost to be accumulated against this element include a summarization of all costs required to plan, develop, fabricate, assemble, integrate and perform development testing, analysis and reporting for the air vehicle. It also includes all costs associated with the required efforts in integrating, assembling and checking our GFP required to create this element.

Relationship of Spec Tree and WBS System Specification System or Item Perform. Specification Item Perform Specification Item Perform. Specification Item Detail Specification Detail Drawings Specification Flowdown System System/ Subsystem Component (Assembly) Subassembly (Detail Part) WBS Decomposition Defense System Air Vehicle Airframe Electrical Subsystem Power Supply Amplifier Circuit Board Subsystem

Work Package Defines: The work required. Functional responsibility for performance. It is a specific task or set of tasks to be accomplished to produce a: -Drawing, -Design, -Piece of hardware or service.

WBS Summary WBS development is a systems engineering responsibility. – Total system described through a logical breakout of elements into work packages. – Tool for planning and assignment of tasks and work packages. – Assists in tracking resource expenditure, schedule, and technical performance. – Must be developed to appropriate level and represent all applicable work.

WBS Assignment Complete a WBS for your project using the WBS Microsoft Template located at in the Teamwork file at the Angel site.

AUGV SYSTEM Vehicle T & E Training Data Logistic Supportability Sys Eng & Integration AUGV WBS Program Mgt

AUGV WBS Exercise Review contract WBS and make any proposed changes to second level As a minimum, take the “vehicle” element and extend it to level 3 Show complete WBS in either tabular or graphic form, including numbering convention