Kitakami Side AHCAL Assembly or anywhere in any detector.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AHCAL Mechanics status report Karsten Gadow CALICE AHCAL main meeting DESY,
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
1 GLD Surface Assembly Y. Sugimoto KEK
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
The HCAL barrel absorber structure
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October /9 October 2015TSS: TPC Assembly1.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Experimental Hall in Mountain Regions
Planning for Proto-DUNE PD Installation and Cabling at CERN
2016/9/30 Yasuhiro Infra/CFS mini-ws
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
SBN Far Detector Installation & Integration
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Pre-installation and Functional Tests
INSTALLATION SEQUENCE
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Current Site Status at IP Preliminary survey of campus
Update of experimental hall in Japanese mountain site
LumiCal mechanical design, integration with LDC and laser alignment
Detector hall in mountain regions
IFR detector mechanics
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Installation plans from mid 2005
6 MMC (Off Site Production)
Detector hall in mountain regions
AHCAL Mechanics status report Karsten Gadow CALICE AHCAL main meeting
as a prototype for Super c-tau factory
Presentation transcript:

Kitakami Side AHCAL Assembly or anywhere in any detector

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 2 AHCAL assembly in ILD based on CMS style !

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 3 AHCAL assembly in ILD transport through tunnel system !

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 4 AHCAL Assembly solution: all needed AHCAL parts fit into here the container fits to standard transport systems as ships, railways, trucks and through tunnels…..

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 5 AHCAL barrel in ILD it does not matter for the AHCAL barrel where the central yoke and the coil stays, but it must be there, before the AHCAL barrel installation starts

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 6 AHCAL barrel integration sensitive layer scintillator tile array very frontend readout with SiPMs test beam setup in ILD absorber submodule

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 7 AHCAL half barrel absorber installation step 1 mounting of 16 AHCAL submodules with all sensitive layers and front end electronics to a full half barrel in front of the cryostat submodule connection by plates from the front and back side AHCAL half barrel is supported by two rails inside the cryostat vessel

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 8 AHCAL barrel integration tools lifting and turning tool for AHCAL barrel absorber submodules available 2 x 18 t capacity operation with 2 hooks (z angle adjustment) precise motor controlled turning design for adaptation for sub-modules with and without sensitive layers started mounting, support and insertion frame insertion frame design ready insertion frame support design depends on final yoke size and useable space push and pull tool available must be modified to the rail distance and rail shape/size 18 t

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 9 AHCAL barrel integration step 2 push the first AHCAL half barrel into the cryostat the second AHCAL half barrel can be pushed trough the cryostat first, if it is necessary push/pull system existing

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 10 AHCAL barrel integration step 4 install the AHCAL barrel cabling and cooling continue with the second AHCAL half barrel

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 11 AHCAL end cap installation step 1 AHCAL tower book shelf fixation no frame work needed requires suitable scaffolding

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 12 AHCAL end cap installation step x AHCAL towers for half end cap

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 13 AHCAL end cap installation step after the tower installation the mounting of AHCAL end cap cabling and cooling will start continue with the second AHCAL end cap cabling and cooling routing design not started, because there is no place for back end electronic and cooling systems known

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 14 AHCAL assembly in ILD installation scenario AHCAL submodules and towers should be already equipped with sensitive layers and pretested anywhere in the world to reduce installation, transportation and storing charges at the installation area all AHCAL parts and tools can be transported in standard containers the AHCAL assembly can be done at the surface or in the experimental hall after transportation to the experimental site, the AHCAL submodules and towers must be tested before the AHCAL barrel and endcap installation, to reduce possible delays due to failures by transportation the testing of the sensitive layers and frontend electronics for the AHCAL submodules and AHCAL towers needs a testing and storing place laboratory space and infrastructure should be available close to the experimental hall

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 15 AHCAL assembly in ILD installation schedule detailed schedule for the AHCAL installation at the Japanese site is existing since mid 2012 incl. manpower the critical path during the AHCAL barrel installation will be the crane usage at the detector installation area if the AHCAL detector will get 100% priority of crane usage, the installation of the hole AHCAL barrel will take 180 days the installation of the AHCAL end caps will take nearly the same time, if there will be the same priority as for the AHCAL barrel. an parallel installation of AHCAL barrel and AHCAL endcap could be possible, if there would be enough installation space and crane capacity to fulfill such a tight installation schedule, a professional testing and storing of equipped submodules and towers, supported by an equivalent infrastructure, is needed

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 16 AHCAL assembly in ILD experimental site requirements experimental site must be reachable by standard trucks with 20“ containers and a payload of 20 t under convenient conditions (moderate slopes and curves) the AHCAL test hall must be passable with trucks like above the AHCAL test hall must be equipped with 2 x 20 t gantry cranes the two crane hooks must reach a distance of 2,5 m between each other and a height of 6 m over ground the operational area of the cranes for the AHCAL must be 10 m (crane bridge) x 20 m load area 4 x 8 m / AHCAL test area 6 x 8 m / AHCAL storage area 10 x 12 m the AHCAL test area must be air conditioned cooling water (16°C, 2 bar, 50 l/min) must be supplied to the AHCAL test area electrical power 4 x (3 phase x 400V / 50Hz, 32 A) must be supplied to the AHCAL test area workshop (5 m x 10 m with a height of 3,5 m) for sensitive layer repair directly at the AHCAL test area 4 offices with 20 m² directly at the AHCAL test area

Karsten Gadow | ILD Topical Integration Meeting | LAL-Orsay | Page 17 Conclusion attack the real problems ! ECAL !AHCAL ring !