WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.

Slides:



Advertisements
Similar presentations
LAPD Run 2 Results and Notes Terry Tope
Advertisements

LBNF Test Cryostat Requirements David Montanari / Jack Fowler Jan 29, 2015 Rev. 11.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Neutrino Cryogenics Requirements Meeting Overall Summary of Our Discussions Barry Norris (Fermilab) / Johan Bremer (CERN) Neutrino Short Baseline Meeting.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Single Phase Test at CERN Cryostat/Cryogenics Update
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
35ton and LAPD cryostats and future DUNE detector development.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
DUNE Single Phase Prototype Cryostat overview David Montanari / Jack Fowler / Dimitar Mladenov Apr 17, 2015 Rev. 15.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LBNF Cryo + Detector schedule Filling scenarios (Cryostats #1 and #2) Mohammed Elrafih, Elaine McCluskey, David Montanari, Marzio Nessi, Bob O’Sullivan.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
EHN1 Cryogenics Integration
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Overview of the Long-Baseline Neutrino Facility Cryogenic System
David Montanari / Johan Bremer / Jack Fowler / Dimitar Mladenov
2K Cold Box FDR Introduction
Cryomodule test stand at ESS site
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Proximity Cryogenics P&IDs meeting
M. Chalifour - TE/CRG-CI
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
CRYOGENICS OPERATIONS 2008 Organized by CERN
Far Detector Activities Late 2017 – Early 2018
EP Experiments safety validation process Safety Permits
Status of the cryogenic system for B180
Test box for ProtoDUNE SP – Integration Test
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Discussion on MERIT Cryogenics Specifications
Presentation transcript:

WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1

Outline Intro Cryogenics Preliminary PFDs How to go from 1x1x3 to 6x6x6 Preliminary ODH assessment Summary 2Sep 21, 2015WA105 Technical Board

As a community we want to develop a common strategy to address LAr/LN2 cryogenic needs for: – WA105 1x1x3 (very short term)  CERN. – SBND/ICARUS (short term)  Fermilab. – WA105 6x6x6 and ProtoDUNE (short term)  CERN. – LBNF/DUNE (long term)  SURF. – Other future generation detectors to come. We want to minimize the effort and design and fabricate a standard system that could be “enlarged” and adapted for future short/mid/long term needs. To the extent possible, we want to design a portable system that could be fabricated and tested in one place and installed at destination in another, with “quick” connections to/from cryostat. We want to test all features that might be relevant and of interest for present and future detectors: external/internal LAr pumps, cold roof (< 100 K), etc. and the possibility to turn them on/off to compare. Three parts are identified (for both LAr and LN2 systems): Proximity Cryogenics External Cryogenics Internal Cryogenics Sep 21, 2015WA105 Technical Board3 Intro

ParameterValue LocationPreferably not in front of the cryostat (on the beam line) LAr purity in cryostat??? xxx ms lifetime (xxx ppt O2 equivalent contamination) ??? GAr Piston purge rate of rise1.2 m/hr Membrane cool-down rateFrom manufacturer TPCs cool-down rate< 40 K/hr ?? Nominal LAr purification flow rate (filling/ops)5.5 day/volume change (3.65 m^3/hr = 61 l/m) GAr purge within insulation1 volume change/day of the open space between insulation panels Cooling power Cool down: TBD Static heat leak of cryostat: 3.0 kW (1.0 m insulation, 2.6 kW with 1.2 m) Operations: 3.0 kW + TBD: -Electronics heat load ?? -LAr pump(s) heat load ?? -Heat leak of cryo-piping (From cryo-piping design) ?? Lifetime of the cryogenic systemConsistent with the LAr program TBD Control systemIntegrated with the other neutrino projects (as much as possible) Cryogenic System Requirements 4Sep 21, 2015WA105 Technical Board Note: a standardization of the cryostat size between WA105 6x6x6 and ProtoDUNE is in place. Values may slightly change accordingly.

Cryogenic Systems (Preliminary) To the extend possible, we want to design a portable system that could be fabricated and tested in one place and installed at destination in another, with quick connections to/from cryostat. External Cryogenics (CERN)  can be located anywhere, will be outside of the building. Internal Cryogenics (WA105)  inside the cryostat (includes the LAr circulation pump). Proximity Cryogenics (CERN)  several locations: – Condenser and LAr Phase separator (and maybe LN2 dewar/phase separator) will have to be located above the roof of the cryostat or nearby, but higher than the roof of the cryostat. – Penetrations through the top of the cryostat. – GAr purge in the insulation two in and two out at a certain elevation with piping going to the rest of the system. – The remaining can be located where space permits, preferably in the vicinity of the cryostat. LAr/LN2, GAr/GN2 piping will connect Proximity/External/Internal cryogenics. The design will inform on size and specific location. Sep 21, 2015WA105 Technical Board5

Sep 21, 2015WA105 Technical Board6 PFD of LAr system (Preliminary)

Sep 21, 2015WA105 Technical Board7 PFD of LN2 system (Preliminary)

Cryogenic Systems Capabilities To clean the cryostat: – GAr purging and venting – GAr recirculation and purification. To cool down the cryostat and fill it with LAr. To continuously purify the LAr (filling and operations). To purify and re-condense the boil off gas. To handle the LAr/GAr and LN2/GN2 flows during all phases. To monitor and control internal and external pressure: Pressure Control / Vacuum Protection Auto/Manual venting. Make-up GAr. To handle the GAr purge inside the insulation. Instrumentation and diagnostics. To sample GAr and measure the concentration of contaminants. Control system. Sep 21, 2015WA105 Technical Board8

Sep 21, 2015WA105 Technical Board9 How to go from 1x1x3 to 6x6x6 We plan to follow a similar process to that of the WA105 1x1x3: ItemCryo transfer lines + Valve Boxes Warm GAr piping Preliminary design and sizingCERN P&ID and 3D modelingCERN TenderingIssued by CERN- Final design and fabricationVendorCERN Inspections and tests (leak check, pressure test, cold test, etc.) Vendor and vendor’s facilityCERN Control systemCERN Installation and final testingVendor at CERNCERN CommissioningCERN/WA105

Sep 21, 2015WA105 Technical Board10 WA105 1x1x3 – P&ID

Sep 21, 2015WA105 Technical Board11 WA105 1x1x3 – Views 1

Sep 21, 2015WA105 Technical Board12 WA105 1x1x3 – Views 2

Preliminary ODH risk assessment for EHN1 Met weekly with WA105 and HSE. Drafted a “Preliminary ODH risk assessment” for EHN1 (WA105 6x6x6 and ProtoDUNE). Document includes: – Description of experiments – Steady state analysis – Proposed mitigation strategies (to be implemented by the experiments in collaboration with HSE and CV Document being circulated among relevant stakeholders at CERN for comments. 13WA105 Technical BoardSep 21, 2015

Cryogenics DRAFT schedule Preliminary Design (with P&ID and 3D modeling): Oct May Final Design/Procurement: May 2016-Apr Installation/Assembly/Final testing at CERN: Apr-Jun Ready for operations: Jun WA105 Technical BoardSep 21, 2015

Summary The WA105 1x1x3 cryogenic system design is being finalized. We have a P&ID and a 3D model of the building with the cryostat and the cryogenic system. We have written Technical Specifications for the tendering of the cryogenic transfer lines and the valve boxes. Once the tendering is in progress we will focus on the WA105 6x6x6, for which we will follow a similar process to that of the 1x1x3: – Develop P&ID and 3D model. – Preliminary Design – Technical specifications for the final design and fabrication of the cryo transfer lines and valve boxes. – Final Design of the warm part. – Installation and assembly at CERN. – Final testing and commissioning at CERN. 15WA105 Technical BoardSep 21, 2015

Thanks