Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
M. Gilchriese ATLAS Pixel Upgrade Thoughts on US Role.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Gossip/GridPix – guidelines, facts, and questions for review Version 1: Norbert Version 2: Tatsuo Version 3: Werner.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
6 th September 20061S. Eicher, M. Battistin Upgrade Thermal Management Workshop September 6 th 2006 Bdg 40 Sara Eicher, Michele Battistin CFD Calculations.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Provocative. Who needs detector hardware (until 2025)? ATLAS LHCb KM3 ALICE Darwin/XENON ILC/CLIC Virgo/GW Auger ? medical imaging, beam therapy.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
`` ATLAS inner detector JV Els KoffemanAtlas - Inner Detector1 Tracking in solenoid 2 Tesla field – 3 pixel layers with 50 um x 400 um cells – 4.
A.P.Colijn1 Nikhef Nikhef – History CO Nikhef - Who is Who CO Nikhef - Work in Progress CO Nikhef - Plans.
Gossip : Gaseous Pixels Els Koffeman (Nikhef/UvA) (Harry van der Graaf, Jan Timmermans, Jan Visschers, Maximilien Chefdeville, Vladimir Gromov, Ruud Kluit,
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
For the CMS Pixel detector
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Micro-channel Cooling
Hybrid Pixel R&D and Interconnect Technologies
For the CMS Pixel detector
? ENDCAP: Mechanics IFIC-Valencia.
M. Battistin CERN EN/CV/DC 9th July 2009
TK Upgrade report.
Upgrade Strategy for the Experimental Vacuum Systems
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
Nikhef Nikhef – History Nikhef - Who is Who
CO2 cooling requirements for the IBL
Update on ATLAS insertable B-layer
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
SVT – SuperB Workshop – Frascati Sept. 2010
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
For the CMS Pixel detector
Presentation transcript:

Upgrade plans for ATLAS

Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.

Important: there are 2 phases of ATLAS upgrades Phase 1: Modest: Not before winter Phase 2: LHC  sLHC: Not before 2019 Even before phase 1 there is still work to do to commission the current detector! In particular trigger/DAQ of the current muon system: we do not know the rates. Next year: expect L~10 31 – cm -2 s -1 : far away from !

Phase 1

Insertable B-layer: leave current pixel detector intact remove beam pipe install new smaller diameter beam pipe equipped with one additional layer of pixel sensors Nikhef interest: cooling (CO 2 evaporative cooling) front end chip FE-I4 studies of trigger/DAQ improvements (stave design) To be completed in one long LHC winter shutdown (Keep b-tagging capabilities when pixel b-layer has sustained radiation damage)

Choice: CO 2 or C 3 F 8 / C 2 F 6 CO 2 advantage: less material colder, uniform no compressor Also interested in stave design (see later)

The sub-projects within the Nikhef CO 2 project: 1.Warm Cooler: Build a room temperature CO2 cooler for R&D at Nikhef 2. Cold Cooler: Build small scale O(1kW) cooling plant for temperatures between -50C to +20C. To be used as research plant (measure heat transfer/ cooling power / temperature gradients etc) and to investigate possible improvements of 2PACL concept as developed for the VELO Thermal control system 3. IBL Proto-type(s): Nikhef can build two O(1kW) cooling machine proto-types for IBL subject to funding. If agreed by all parties, it is expected that a working plant can be delivered to CERN in April-May Test-setup: Build a test bench to measure properties of CO2 in micro channels at sub-zero temperatures. Components that are foreseen to be used in ATLAS can be evaluated. Considerable synergy LHCb-ATLAS Successful VELO cooling system gives Nikhef a big edge

Future of CO 2 cooling activities at Nikhef: Construct mobile/exportable CO 2 plant: spring 2010? Design IBL cooling pipework inside ATLAS Build prototype IBL cooling plant ATLAS makes IBL cooling choice end 2010 If CO 2 cooling chosen for IBL and operation successful: Also option for full phase 2 ATLAS inner detector cooling. Totally new scale: O(100 kW) Cooperate with CERN cooling group

Phase 2

Nikhef ATLAS group is performing R&D to be in optimal position when technical choices are made around These are focused on replacement of full ATLAS inner detector in (+ likely: trigger/DAQ activities) (Phase 2: high luminosity, high backgrounds, severe radiation environment, many events/bunch crossing, high occupancies….)

No concrete Nikhef upgrade activity yet. Are studying current counting rates. Do not intend to build new chambers, Future activity in trigger/DAQ

No concrete Nikhef activity. Significant Nikhef interest. Replacement of full current Inner Detector

Nikhef/ATLAS activities related to phase 2 upgrade: 3 running R&D projects: Pixel stave design Endcap strip detector design Gossip Likely future activities: Trigger/DAQ improvements for sLHC Possible future activities: Evolution pixel chip for sLHC environment With the eventual aim to assemble a significant part of a new ATLAS inner detector at Nikhef (for example: an endcap)

Gossip is an application of GridPix technology Under development in Nikhef R&D group Goes beyond ATLAS: also ILD, DARWIN, … Gossip may be applicable in b-layer or layers further out (transition radiation, track trigger) ATLAS has not made choice of sensor technology yet: planar Si, 3D Si, diamond, Gossip Gossip should be considered an outsider at this moment. Thin gas volume above micromegas grid, pixel readout. Advantages: low mass, cheap, radiation hard, low cooling req. To be proven: resolution, rate capabilities, ageing, production technology, long term HV control Harry v.d. Graaf, R&D group

Pixel staves: layout and engineering, for now independent of sensor technology Goal: build prototype staves following ATLAS pixel layer requirements but aiming at significant reduction in mass with respect to current support. Design cooling connections from pipe to the chip/sensor where the power is dissipated. (Also useful for IBL) 3 year R&D plan. Deliverables: - stave with cooling for test measurements (dummy power load and many T-sensors) - stave with dimensions and specs following ATLAS requirements - stave to support GOSSIP modules Engineering department 2 x 0.5 FTE/year1.0 FTE Mechanical Workshop 2 x 0.5 FTE/year 1.0 FTE Electronic Engineering 0.5 FTE (last year)0.5 FTE R&D project is running; manpower asked for: Els Koffeman

Endcap strips: layout and engineering, for now independent of sensor technology Anticipate Nikhef will make a significant contribution to the new inner tracker, especially in the end-cap strips section. This is much bigger than the previous end-cap, because silicon strips will replace the previous TRT technology at outer regions. 3-year work plan for R&D. Milestones: Carbon Fiber Petal manufactured with cooling – March 2010 Conceptual design of circumferential staves, with FEA calculations of mechanical and cooling behaviour – March 2010 Cooling performance of petal measured and compared to FEA – July 2010 Document results of tests on pipematerials and connectors as input to choosing a baseline for ATLAS – October 2010 Decide if high-temperature cure bonding of petals is possible and evaluate material saving – December 2010 Assemble a petal for use by collaboration as basis or the “Petal2010” prototype – February FTE manpower, Nigel Hessey

We are also interested in contributing to trigger/DAQ upgrades. Need to see behaviour of current system before concrete upgrade proposals. Maybe LVL1 track trigger, improvements to LVL1 muon trigger. Furthermore: data flow architectures, modeling, trigger strategy, high level trigger (Jos Vermeulen, Olga Igonkina)

Conclusions: Phase 1: ideas defined: CO 2 cooling, chip development trigger/DAQ: have to see behaviour current system Phase 2: not before 2019 We request resources to perform R&D to be in optimal position when ATLAS starts making technical choices in R&D projects have been defined and are running. After that we intend to be contributing to building part of an ID replacement - no plans for large Si sensor module assembly - if Gossip part of ATLAS upgrade: local production or industry - interested in assembly of a significant part of a new inner detector Considering activities in trigger/DAQ and chip development. Building new muon chambers at Nikhef unlikely.