Center for Risk Management of Engineering Systems University of Virginia Update for VTrans2025 Technical Committee June 14, 2006 Dr. James H. Lambert Alexander.

Slides:



Advertisements
Similar presentations
Pinellas by Design: A Blueprint for Updating the Countywide Plan Pinellas Planning Council May 18, 2011.
Advertisements

From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
Cost Analysis of Military Training Marcel C. Smit SAS-095 workshop on Cost-Benefit Analysis of Military Training Amsterdam, The Netherlands 5-6 June 2012.
Freight Demand Modeling: Tools for Public-Sector Decision Making First National Conference September 25-27, 2006 Washington D.C. Sponsored by TRB FHWA.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Center for Risk Management of Engineering Systems University of Virginia 1 Multimodal Maturity of Virginia’s Transportation Corridors April 19, 2006 presented.
Infrastructure – Mission to Preserve & Renew. Infrastructure – Transportation funding must be sufficient to both repair and sometimes replace our highway,
Quality Region Principles The New Visions Plan addresses the region’s quality of life in a number of important ways and provides a framework for improving.
Center for Risk Management of Engineering Systems University of Virginia Prioritization Methods For Multimodal Investments, Including Return on Investment.
Association of Metropolitan Planning Organizations.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Analytical Support for the Statewide Multimodal Long-Range Transportation Plan Prepared for the Systems and Information Engineering Design Symposium University.
Regional Integration Cluster Olivier Hartmann - SSATP.
Structure of Presentation Federal Requirement Methodology WMATA Expenditures and Core Capacity Constraint Draft Revenues and Expenditures for 2015 – 2040.
Paris Project Meeting January 2012 Item – Statistics Objective 5 B. Proia With financial support from Criminal Justice Programme 2008 European Commission.
PRESENTATION ON HARNESSING PUBLIC PRIVATE PARTNERSHIPS (PPP) OPPORTUNITIES FOR SOCIO-ECONOMIC DEVELOPMENT. A GLOBAL PERSPECTIVE AND EXPERIENCE BY ROUND.
1 June 11, 2015 Raleigh, NC. PRESENTATION OBJECTIVE To give an overview on the newly adopted Strategic Transportation Corridors. 2.
Ecosystem Services & their Role in Poverty Alleviation in Suynik Province, Armenia Armenia.
Envisioning the Future of Minnesota Transportation Finance Advisory Committee April 20, 2012.
Sustainability Metrics  Lecture 1-Weak Sustainability Metrics Dr Bernadette O’Regan  Lecture 2-Strong Sustainability Metrics Prof Richard Moles  Lecture.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 26 Potential for Improvement Additional data –Accidents concerning.
Center for Risk Management of Engineering Systems University of Virginia 1 Update for VTrans2025 Technical Committee April 12, 2006.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Integrating State and Local Safety Data 1 Roadway Safety Data Program.
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Federal Funding Strategies Update Internal Working Document Update on Federal Funding California High-Speed Rail Authority In Partnership with: Kadesh.
Center for Risk Management of Engineering Systems University of Virginia 1 Update for VTrans2025 Multimodal Advisory Committee August 8, 2006.
Multimodal Investment Network MIN Development Multimodal Investment Networks (MIN) are projects that the Commonwealth of Virginia will potentially implement.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Regional Transit Framework Regional Council March 31, 2010.
San Francisco Long Range Transportation Planning Program Finance Committee Agenda Item 3 January 12, 2016.
Hampton Roads Third Crossing I. Introduction VDOT, in cooperation with the Federal Highway Administration (FHWA) is proposing to construct a new bridge-tunnel.
Business Intelligence Pathway Method 5 th Meeting Course Name: Business Intelligence Year: 2009.
Framework for Rail Planning and Project Development.
T H E P O R T L A N D P L A N A Comprehensive Plan for Portland in 2040 September 2007.
Country Workshop on The Philippine Data Revolution Roadmap for the Sustainable Development Goals EDSA Shangri-la, Mandaluyong City 5 October 2016 Gaye.
United Nations Statistics Division
Project Overview – Phase 1
Regional Roads Committee
NGTA Halton Planning and Public Works Committee
2017 SCORT Conference Washington, DC
presented by Cambridge Systematics, Inc. KT Analytics
Technical and Public Advisory Committee Meeting #3
A Methodological Basis for the Definition of Common Criteria regarding the Identification of Bottlenecks, Missing Links and Quality of Service in Infrastructure.
Oregon Transportation Plan
Life Cycle Cost Analysis
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Coordinating and Prioritizing Multimodal Transportation Projects
Highways Modal Profile
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
California’s Rural Intercity Bus System: 2018 Update
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
Presentation to DATA on VTrans 2040 / HB2
Commonwealth Transportation Board
STP Shared Local Fund: Project Evaluation Criteria
EC Strategy, Globalization, and SMEs
Coordinating And Prioritizing Multimodal Transportation Projects
I-81 Corridor Improvement Plan
United Nations Statistics Division
Minnesota State Planning Conference September 28, 2011
United Nations Statistics Division
Presentation transcript:

Center for Risk Management of Engineering Systems University of Virginia Update for VTrans2025 Technical Committee June 14, 2006 Dr. James H. Lambert Alexander S. Linthicum Katherine M. Tejano

Center for Risk Management of Engineering Systems University of Virginia 2

Center for Risk Management of Engineering Systems University of Virginia 3 Recent Work Completed Submitted Phase 2 VTRC Report, Draft “Analytical Support for the Statewide Multimodal Long-Range Transportation Plan - Phase 2” Compiled additional MIN maps and statistics

Center for Risk Management of Engineering Systems University of Virginia 4 Phase II VTRC Report The report develops a prototype framework on which to compare alternative multimodal transportation investments –Multimodal Vision and Planning –Budgeting and Programming –Socioeconomic and Geographic Characteristics –Institutional Authority –Base Infrastructure –Technology / Knowledge Performed corridor analysis from two perspectives –Capital Cost Analysis (B&P) Multimodal vs. Highway Only Comparison VDOT vs. MPO/PDC LRTP Comparison –Population Density Analysis (S&G)

Center for Risk Management of Engineering Systems University of Virginia 5 Phase II VTRC Report Capital Cost Analysis Results –Multimodal vs. Highway Only Comparison Operations and maintenance costs must be considered Benefits of multimodal must be equivalent to those of highway only, OR Benefits must be captured in monetary units

Center for Risk Management of Engineering Systems University of Virginia 6 Phase II VTRC Report Capital Cost Analysis Results (continued) –VDOT vs MPO/PDC LRTP Comparison 7 of 11 corridors had sufficient data at the time of this study $0 indicates cost was not available for a specific initiative. In general, VDOT’s cost estimation of interstates consistently exceeds those estimates of the regional MPOs/PDCs Discrepancies among agency plans provided significant challenges to the effort –Differences in content, financial basis, and format between plans are numerous –Contents of each plan are variable and non-uniform –Plans all published at different times with a variety of year-of- expenditure dollar projections; some make no mention of a base- year Refer to next slide for quantitative results

Center for Risk Management of Engineering Systems University of Virginia 7

Center for Risk Management of Engineering Systems University of Virginia 8 Phase II VTRC Report Population density analysis –Population densities are generally greatest in areas with significant populations Especially Northern Virginia, Hampton Roads / Norfolk, and Richmond –I-95, I-64, and I-66 corridors are strong candidates for multimodal transportation investment based on population density –Population densities for remaining corridors indicate limited ability to support multimodal passenger investment Generally low in density and connect few large population centers along routes

Center for Risk Management of Engineering Systems University of Virginia 9 Phase II VTRC Report Anticipated future work –Budgeting and Programming Investigate practical methods of increasing the accuracy and inclusion of life-cycle costs into project estimates for transportation and planning agencies Research quantification of benefits to employ more advanced cost methodologies such as cost-effectiveness and cost-benefit analyses. Investigate methods of increasing cooperation among modal agencies and transportation planning organizations in developing cost estimates specifically, and long-range transportation plans in general –Socioeconomic and Geographic Characteristics Research further attributes that characterize corridors as either strong or weak candidates for multimodal passenger investment (Accessibility Analysis) Extend subject corridors to determine which routes connect to high density areas outside the state Include freight characteristics such as volume and capacity and origins and destinations to determine viability for multimodal freight projects along these corridors Identify opportunities for localized multimodal transportation investments that are of statewide strategic significance

Center for Risk Management of Engineering Systems University of Virginia 10 Phase II VTRC Report Anticipated future work (continued) –Multimodal Vision and Planning and Institutional Authority Determine whether the vision and planning efforts of all transportation, land use, economic, and government stakeholders are aligned Research public-private transportation projects –Base Infrastructure Data collection and research is necessary to determine the transportation facilities that already exist ***Aligns closely with VTrans performance metric effort –Technology / Knowledge Determine context sensitive solutions and techniques most appropriate for individual transportation challenges

Center for Risk Management of Engineering Systems University of Virginia 11 Additional MIN maps and statistics

Center for Risk Management of Engineering Systems University of Virginia 12 Additional MIN maps and statistics

Center for Risk Management of Engineering Systems University of Virginia 13 Additional MIN maps and statistics

Center for Risk Management of Engineering Systems University of Virginia 14 Additional MIN maps and statistics

Center for Risk Management of Engineering Systems University of Virginia 15

Center for Risk Management of Engineering Systems University of Virginia 16

Center for Risk Management of Engineering Systems University of Virginia 17

Center for Risk Management of Engineering Systems University of Virginia 18

Center for Risk Management of Engineering Systems University of Virginia 19

Center for Risk Management of Engineering Systems University of Virginia 20

Center for Risk Management of Engineering Systems University of Virginia 21

Center for Risk Management of Engineering Systems University of Virginia 22

Center for Risk Management of Engineering Systems University of Virginia 23

Center for Risk Management of Engineering Systems University of Virginia 24 Anticipated Work Continue Statewide Accessibility Analysis Further develop the prototype framework for comparing alternative transportation investments –Multimodal Vision and Planning –Budgeting and Programming –Socioeconomic and Geographic Characteristics –Institutional Authority –Base Infrastructure –Technology / Knowledge