ASAS-GN Rome 12-13 November 2008 Alex Wandels, CASCADE Programme Manager.

Slides:



Advertisements
Similar presentations
Air / Ground Communications in Europe
Advertisements

The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
CNS/ATM SG #42 ADS-B - CASCADE Presentation Material Cologne, 15 October 2008 Jörg Steinleitner, CASCADE Infrastructure WP Lead.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation sous-direction Etudes et Recherche appliquée direction des services.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Automatic Dependent Surveillance – Broadcast (ADS-B) What is it, and how can it help improve operations in Micronesia? Captain Rocky Stone Chief Surveillance.
SESAR and ASAS Opportunity
Applications from packages I to III
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
Workshop on preparations for ANConf/12 − ASBU methodology
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
EASA Airborne Separation Assistance Systems (ASAS) Certification
20 In-Trail Climb experience and an airlines view of ASAS opportunities Captain Rocky Stone United Airlines Manager – Flight Systems Technology.
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
Airbus vision of future ASAS Christophe MAILY – Airbus ASAS in a future ATM system Rome, April 2006.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Airbus Status on ADS-B In / Out Update
ASAS Thematic Network 2.5 Towards an ASAS-Global Network.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
The European Organisation for the Safety of Air Navigation SES Implementing rules on surveillance EBAA, CNS/ATM AG 6, Brussels. 17 th November 2010 Presented.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
Boeing and Airborne Surveillance. Page 2 Boeing and Airborne Surveillance Some good news………….and some other news.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
ASAS Thematic Network II First Workshop Savoy Hotel, Malmö.
ADS-B Out, In and GNSS Requirements Update
ADS-B Avionics Solutions
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B Regulations, Standards and Guidance
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
ATN London - 23 September 2003 Alex Wandels
Rome November 2008 Johan Martensson, CASCADE
Workshop on preparations for ANConf/12 − ASBU methodology
EUROCONTROL SURVEILLANCE STRATEGY
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO WGN New Orleans Nov 2004
DATA LINK IMPLEMENTATION IN EUROPE
QUICK GUIDE TO GETTING COMPLIANT
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

ASAS-GN Rome November 2008 Alex Wandels, CASCADE Programme Manager

Scope  Ground Surveillance Applications (ADS-B-out) ADS-B Receiver  In a non-radar environment  In a radar environment  On the airport surface 2008  Airborne Surveillance Applications (ADS-B-in)  Situational awareness on the surface  Airborne situational awareness  Visual separation on approach  In Trail Procedure 2011 Situational Awareness “only”

Why ADS-B? In a non-radar environment 100 € saved per rotation Route Charges: % In a radar environment Fuel: % In Trail Procedure

ADS-B Out CRISTAL Trials 18 Pioneer Airlines 400+ aircraft 500,000 flights/year

ADS-B Out NRA: Commitment RAD: Intent

Trials ATSA-ITP ATSA-SURF ADS-B-NRA ADS-B-APT

Trials & Implementation InfrastructureTrainingOps. Approval ADS-B Station Tracker CWP Controllers Engineers Generic Safety Local Safety Simulation Approval Operations

Safety Case

Approach Single European Sky Surveillance Performance & Interoperability Implementing Rule voluntary implementation in pocket areas certified existing equipage IR based implementation in wider areas upgraded equipage Forward-fitRetro-fit Pioneer PhaseMandate Phase

Avionics Perspective Transponder: DO260 GNSS “Data Collector” (e.g. IRU) Direct Wiring Pioneer Phase Transponder: DO260A+ GNSS (SA Aware recommended) Mandate Phase Uncomp. Latency ~ 0.6s Uncomp. Latency ~ 1.5s Higher NIC/NAC +Mode A No Deviations 2015

Schedule StandardsAirworthinessMandate 2007 NRA ITP VSA APT RAD SURF AMC AMC 20-xx Draft SPI-IR SPI-IR AIRB AMC 20-yy SPI-IR MoC

Other Continents 2008 & later 2020 & earlier Now, 2013 & later Joint ADS-B Harmonisation Statement Standards Certification Implementation

In Summary ADS-B is happening Baseline Fixed Globally co-ordinated