Signaux, Bruits, Problèmes Inverses – INRA - Nice, 05-05-2008 The VIRGO Environmental Monitoring System R. De Rosa University of Napoli - Federico II and.

Slides:



Advertisements
Similar presentations
FIGURE 7.1 Elements of the final control operation.
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
1 ZonicBook/618EZ-Analyst Resonance Testing & Data Recording.
ZonicBook/618EZ-TOMAS Rotating Machinery Monitoring and Analysis
Electromagnetic Induction
AP STUDY SESSION 2.
1
Measuring Sound Contents: The Microphone The Sound Level Meter Leq
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 3 Data Transmission.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
Balanced Device Characterization. Page 2 Outline Characteristics of Differential Topologies Measurement Alternatives Unbalanced and Balanced Performance.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
FIGURE 3.1 System for illustrating Boolean applications to control.
FIGURE 2.1 The purpose of linearization is to provide an output that varies linearly with some variable even if the sensor output does not. Curtis.
FIGURE 5.1 Potentiometric displacement sensor.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
1 How many layers of the Earth are there? The part of the Earth that consists of molten metal.
Contents Page Learning targets
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Filters and Enveloping - A Practical Discussion -

Analog and Digital Signals
Pole Placement.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
John Ogilvie High School - CfE Physics
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Communication Systems (EC-326)
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Subtraction: Adding UP
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
FIGURE 12-1 Op-amp symbols and packages.
Converting a Fraction to %
Clock will move after 1 minute
Interfacing to the Analog World
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Thomas L. Floyd Digital Fundamentals, 9e
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Trends in seismic instrumentation Based on the book Instrumentation in Earthquake Seismology Jens Havskov, Institute of Solid Earth Physics University.
Slide # 1 Velocity sensor Specifications for electromagnetic velocity sensor Velocity sensors can utilize the same principles of displacement sensor, and.
Presentation transcript:

Signaux, Bruits, Problèmes Inverses – INRA - Nice, The VIRGO Environmental Monitoring System R. De Rosa University of Napoli - Federico II and INFN - Napoli

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Overview - Slow Monitoring System - Environmental Monitoring System - Seismic Probes - Magnetic Probes - Acoustic Probes - Probe Location in VIRGO - Probes connected with ITF control - Future Projects (R&D)

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Overview The Environmental Monitoring system is divided in two subsystems: 1 – The Slow Environmental Monitoring subsystem, also identified as Building Control System is used to collect all the slow environmental monitoring signals. 2 – The Fast Environmental Monitoring subsystem, properly the Environmental Monitoring System, provides for the signal coming from standard environmental probes. Many other probes exists in Virgo, mainly devoted to the sensing and control of the interferometer: suspensions system, detector motion, …

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Building Control System The Building Control System was originally designed to monitor some environmental parameters inside the buildings. Up to now the parameters are: -Temperature; -Pressure; -Humidity; -Weather parameters: wind speed and direction, internal and external temperature, internal and external humidity, internal pressure, rain rate -Lightning parameter: number of strikes, strike distance, strike angle.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Data coming from the probes are first transformed in suitable voltage by a conditioning electronic Probes Conditioning electronic Conditioning electronic Building Control System

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Building Control System Standard slow monitoring probes require a suitable conditioning electronics. For temperature, pressure and humidity probes it is an home made electronics, directly placed inside the acquisition boxes.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Then they are digitised by an analog to digital converter (ADC) with 12 bits resolution and ± 10 V of input range. Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit Conditioning electronic Conditioning electronic Building Control System

Signaux, Bruits, Problèmes Inverses – INRA - Nice, ETN BOARD Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit Conditioning electronic Conditioning electronic The digital data are collected by a local board Building Control System

Signaux, Bruits, Problèmes Inverses – INRA - Nice, ETN BOARD Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit Conditioning electronic Conditioning electronic This system it is called an Acquisition Box Building Control System

Signaux, Bruits, Problèmes Inverses – INRA - Nice, ETN BOARD Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit Conditioning electronic Conditioning electronic ETN CONTROLLER ETN CONTROLLER Digital data are sent, through a physical link, to the main controller. Building Control System

Signaux, Bruits, Problèmes Inverses – INRA - Nice, ETN BOARD 1 ETN BOARD 1 Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit ETN LINK Conditioning electronic Conditioning electronic ETN CONTROLLER ETN CONTROLLER ETN BOARD...N ETN BOARD...N Building Control System Several Acquisition box are connected on the same link

Signaux, Bruits, Problèmes Inverses – INRA - Nice, ETN BOARD 1 ETN BOARD 1 Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit ETN LINK Conditioning electronic Conditioning electronic MASTER VME CPU MASTER VME CPU ETN CONTROLLER ETN CONTROLLER VME BUS ETN BOARD...N ETN BOARD...N The controller collects the data coming from all the remote acquisition board and sent them to the master CPU through the VME bus Building Control System

Signaux, Bruits, Problèmes Inverses – INRA - Nice, ETN BOARD 1 ETN BOARD 1 Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit ETN LINK Conditioning electronic Conditioning electronic MASTER VME CPU MASTER VME CPU ETN CONTROLLER ETN CONTROLLER VME BUS ETHERNET LINK ETN BOARD...N ETN BOARD...N Finally the master CPU sent the data to the slow frame builder through the network Building Control System

Signaux, Bruits, Problèmes Inverses – INRA - Nice, ETN BOARD 1 ETN BOARD 1 Probes 16 Channels ADC 12 bit 16 Channels ADC 12 bit ETN LINK Conditioning electronic Conditioning electronic MASTER VME CPU MASTER VME CPU ETN CONTROLLER ETN CONTROLLER VME BUS ETHERNET LINK ETN BOARD...N ETN BOARD...N Weather Station Weather Station The data coming from the Weather Station and from the Lightning Detector are sent directly to the master CPU through a RS232 link. Building Control System RS232 LINK Lightning Detector

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Building Control System The meteo station is composed by an integrated sensor that provides for: Temperature, Humidity, Rain Rate, Wind Speed, Wind Direction; And a console that provides for: Temperature, Humidity, Pressure; Moreover the console fully manages the integrated sensors. The data are available in digital format on a serial link

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Building Control System The lightning detector includes a console. This provides for digital data that can be acquired by using a serial link.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Fast Probes The second subsystem is composed by the fast probes. All these probes are connected directly to the fast frame builder through a conditioning electronic. Actually there are four kinds of fast probes: - Seismometers: - Episensors; - Accelerometers; - Velocimeters; - Microphones; - Magnetometers. Conditioning electronic Conditioning electronic Fast Frame Builder ETHERNET LINK Probes

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Accelerometers The Accelerometers uses a commercial conditioning amplifier (Nexus). This amplifiers also filters the data in the desired band. Actually the band is: 1Hz – 3 kHz The sensitivity is around 36 pC/ms -2

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Accelerometers The operating principle is based on the force exerted by the seismic mass on the piezoelectric transducer that produce an electrical charge. The charge is measured by the amplifiers and converted in a voltage M=Seismic Mass, P=Piezoelectric Element B=Base R=Clamping Ring

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Accelerometers The filtering of the output signal is performed by the conditioning amplifier. It is a simple band pass filter (double zero-pole)

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Seismometers Seismometers: There are two kind of seismometers: Guralp (velocimeter), Episensors (accelerometer). Both of them use an home made conditioning electronics to amplify the output signal and to filter it before the local read-out ADC. Actually the band is 0 – 200 Hz. Both the sensors are tri-axial.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Episensor Operating Scheme All

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Episensor Operating Scheme -An acceleration causes the coil and capacitive sensor plates to move with respect to the fixed central plate of the capacitive transducer; -This displacement results in a signal on the center plate of the capacitor becoming unbalanced; -The amplifier amplifies this signal; -The feedback loop compensates for this error signal by passing current through the coil to create a magnetic restoring force to "balance" the capacitor plates back to their original null position; - This signal is proportional to the acceleration needed to restore the mass position, i.e. to the external acceleration acting on the sensor.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Episensor The frequency bandwidth is about 200 Hz; The sensitivity is selectable. The current choice is 40 V/g; Even if the sensor is capable to measure DC accelerations, its response become poor for frequency lower than 100 mHz; Under this frequency other effects become dominant (temperature change, elecrtonic noise, …)

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Episensor Since the sensor sensitivity is low respect to the ADC dynamic range, the signals are amplified by a factor 100 and filtered (200 Hz) to avoid the aliasing.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Velocimeters - The operating principle of these sensors is similar to the episensor one; - The main difference is that the output signal is proportional to the speed of the moving mass; - The frequency bandwidth of the sensor span from Hz to 50 Hz; - The same conditioning electronics (100x Gain and 200 Hz anti aliasing filters) is used before the ADC;

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Monitoring an Earthquake

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Magnetometers The magnetometers are single axis probes. They are always placed in set of three, one for each direction. They have a built-in conditioning electronics that requires no other conditioning to the local read-out. The signal is also filtered in the band: 4 Hz – kHz

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Magnetometers Each magnetometer consists of a sensor coil and a conditioning amplifier integrated in the sensor. The sensor coil: it consists of a high permeable ferrite core and several thousand copper turns The conditioning amplifier: it consists of low noise amplifiers used to reach suitable voltage levels at the sensor output The sensor coil is sensitive to the time derivative of the magnetic flux inside the coil.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Magnetometers The operating principle of the sensor is the following

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Magnetometers The sensitivity of these probes is very high

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Magnetometers A typical behaviour of a good magnetic spectrum (at VIRGO site), compared with the noise level of the sensor.

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Magnetometers Magnetic effect of a lighting strike

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Microphones The Microphones uses a commercial conditioning amplifier (Nexus). This amplifiers also filters the data in the desired band. For the microphones the band is: 0.1Hz – 3 kHz; The sensitivity is 1 V/Pa

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Microphones The filtering of the output signal is performed by the conditioning amplifier. It is a simple band pass filter (double zero-pole)

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Probes Location (Central Building) M M M M B E E E V A A A A A A A A A A T T T T TT T T T T T T T PH P H T P H TPH TPH Microphone Magnetometer Episensor Accelerometer Temperature Probe Pressure Probe Humidity Probe Velocimeter M B E V T P H A

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Probes Location (Mode Cleaner) M E A T T P H Microphone Magnetometer Episensor Accelerometer Temperature Probe Pressure Probe Humidity Probe Velocimeter M B E V T P H A

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Probes Location (North End) M B E A A T T T T T T P H P H Microphone Magnetometer Episensor Accelerometer Temperature Probe Pressure Probe Humidity Probe Velocimeter M B E V T P H A

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Probes Location (West End) M B E A A T T P H P H T T T Microphone Magnetometer Episensor Accelerometer Temperature Probe Pressure Probe Humidity Probe Velocimeter M B E V T P H A

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Further informations are available on the VIRGO web pages: Probe List and Information Probe characteristics:

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring ITF Sensors Many other sensors are available, but they are more connected with the sensing and control of the ITF; The most interesting are the sensors used for the control of the superattenuator They consist mainly in accelerometers and position sensor used to control the first stage of the suspended stage (Filter Zero)

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring ITF Sensors These probes are very sensitive to ground vibration, induced by earthquakes or by strong wind; Since the accelerometers are used for the feed-back in the range 30 mHz – 2 Hz, their output is always close to zero; In this way the main information is carried by the positions sensors;

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Future Sensors The actual sensors used for the suspension control need to be improved to meet the performances required for Advancd Virgo; In particular: - More sensitive accelerometers may be required; - Tilt meters are required to increase the duty-cycle of the interferometer in bad weather condition; In this case, in fact, a significant tilt may be induced by the building motion, and the accelerometers interpreter this effect as an acceleration, resulting in a wrong correction;

Signaux, Bruits, Problèmes Inverses – INRA - Nice, Environmental Monitoring Future Sensors Also a prototype of a monolythic accelerometers is currently developing in Virgo (INFN Napoli – Salerno University)