Vacuum Considerations on ESS-DTL Carlo Roncolato 06/09/2012 Istituto Nazionale Fisica Nucleare Laboratori Nazionali di Legnaro.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
The European Spallation Source Dave McGinnis Chief Engineer – ESS\Accelerator Division IVEC 2013.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Andrea Pisent INFN Italy
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of Pa, or lower.
Laboratori Nazionali di Legnaro (Italy) DTL status A.Pisent ESS Roma 2012.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Visits to Chinese accelerator companies Peter Pearce (April 2004) Two companies were visited. Beijing Medical Equipment Institute at Chongping and Beijing.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Training in Vacuum Technology for JUAS 2013 Students
Anders Sunesson RF Group ESS Accelerator Division
Center for the Advancement of Natural Discoveries using Light Emission Vacuum system for the AREAL linear accelerator Vacuum Systems A.Gevorgyan.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
ESS-Bilbao: MEBT vacuum standarization
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Ports: purpose –vacuum, rf location –accelerating cavity, coupling cavity dimensions … Already discussed, but some points need to be double checked …
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Vacuum for DTL G.Vandoni on behalf of the TE/VSC Linac4 team 13 September, 2011G.Vandoni, TE-VSC1 Acknowledgements M.Malabaila, J.Hansen, A.Mongelluzzo,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Drift Tube Linac CDR Introduction, general aspects
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
WBS2.11 Vacuum systems G.Vandoni …brainstorming presentation… VAT Technical & Scientific7 th July 2008.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ESS Front End diagnostic
DTL F.Grespan – A.Pisent – P.Mereu – M.Poggi-M.Comunian-R.De Prisco LNL– 05/05/2014F. Grespan.
Laboratori Nazionali di Legnaro (Italy) DTL design A.Pisent ESS LNL 2012.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Vacuum System P. Chiggiato TE-VSC
NCFE and Interfaces Meeting: DTL
CERN – Zanon discussions
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Sub-system integration for the VBOX
T5.2: Harmonization - Material and Component Reference
HIE-ISOLDE HEBT vacuum system
MICE Meeting at RAL, Oct-23, 2005
RTML Vacuum System RDR Summary FermiLab October 24, 2007
General remarks about the HESR and PANDA vacuum system
LINAC4 Vacuum Control System Review
Naming convention Rules
SPES-RFQ review Introduction, general aspects
Update on out-gassing tests
Système à vide du CLIC: activités en cours
V. Veshcherevich Cornell University
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
BGC Collaboration Meeting –
Vacuum in LER and HER. First estimation for the pumping system requirements A.Variola for B.Mercier, C.Prevost, F.Letellier.
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Vacuum Considerations on ESS-DTL Carlo Roncolato 06/09/2012 Istituto Nazionale Fisica Nucleare Laboratori Nazionali di Legnaro

Summary of Considerations

Typical DTL Tank Layout (LINAC 4 Example) A. Dallocchio Suitbert Ramberger One available port per module either RF WG or Ion Pump Helicoflex Sealing for Vacuum Tightness & RF Continuity Sealing Features: metal (low outgassing) exchangable (maintenance)

Summary of Considerations

DTL Tank 2 DTL Tank 1 Surface Estimation Inter-tank End Flange Beam Entrance MEB T All Metal Gate valve Quads Interta nk Sectio n RF Input 65 (+ 2 Halfs) Drift Tubes equipped w/ 33 PMQ (45 mm) Pressure Gauge Inter-module Flange ~ 2 m 652 mm Ion Pump Tank 1 Lateral Surface (Module 1÷ 4) m 2 2x End Plates 0.66 m 2 Drift Tubes (66 Cells) 3.46 m 2 Total Copper SurfaceTank m 2 PMQ Surface ( 33 Items ) 933 cm 2

DTL Tank 3 DTL Tank 2 DTL Tank 4 RF Input 35 (+ 2 Halfs) Drift Tubes equipped w/ 18 PMQ (80 mm) 28 (+ 2 Halfs) Drift Tubes equipped w/ 14 PMQ (80 mm) Ion Pump Tank 2 Lateral Surface (Module 1÷ 4) m 2 2x End Plates 0.66 m 2 Drift Tubes (66 Cells) 2.64 m 2 Total Copper SurfaceTank m 2 PMQ Surface ( 33 Items ) 955 cm 2 Tank 3 Lateral Surface (Module 1÷ 4) m 2 2x End Plates 0.66 m 2 Drift Tubes (66 Cells) 2.64 m 2 Total Copper SurfaceTank m 2 PMQ Surface ( 33 Items ) 754 cm 2

DTL Tank 4 Spokes Cavities 24 (+ 2 Halfs) Drift Tubes equipped w/ 13 PMQ (80 mm) All Metal Gate valve Pressure Gauge Ion Pump Tank 4 Lateral Surface (Module 1÷ 4) m 2 2x End Plates 0.66 m 2 Drift Tubes (66 Cells) 2.13 m 2 Total Copper SurfaceTank m 2 PMQ Surface ( 33 Items ) 653 cm 2 DTL Total Copper SurfaceTank1 77 m 2 PMQ Surface ( 33 Items ) 3300 cm 2 Dipole Diag Box

PMQ Outgassing Estimation (CERN) G. Vandoni

Summary of Considerations

Vacuum Equipment Example (CERN) G. Vandoni Target Pressure2.00E-07mbar Port Efficiency60% Tank1Tank2Tank3Tank4 Gas Load 7.35E E E E-05mbar Lt/s Pumping Speed Needed Lt/s Pumping Speed to Install Lt/s Rough Pumping Speed Estimations

Summary of Considerations