Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE.

Slides:



Advertisements
Similar presentations
International cooperation in science as a model for other global activities Herwig Schopper University Hamburg and CERN Member of Board of Trustees WAAS.
Advertisements

Accelerating Science and Innovation Welcome to CERN.
CERN an (unusual) introduction Rolf-Dieter Heuer Director-General, CERN India and CERN – Visions for Future Collaboration Mumbai 28 February 2011.
Welcome to CERN Accelerating Science and Innovation 2 nd March 2015 – Bidders Conference – DO-29161/EN.
Welcome to CERN Research Technology Training Collaborating.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
13 October 2014 Eric Grancher, head of database services, CERN IT Manuel Martin Marquez, data scientist, CERN openlab.
João BENTO BE Department Presentation available at Welcome to CERN “Magic is not happening at CERN, magic is being explained.
European Federation of Engineering Consultancy Associations.
From Open Science to (Open) Innovation Markus Nordberg, Marzio Nessi (CERN) About CERN, Open Physics, Innovation and IdeaSquare.
CERN Enrico CHIAVERI Head, Human Resources Department 22 June 2009.
Welcome – Benvenuti Carlo Verdone to Accelerating Science and Innovation to Accelerating Science and Innovation.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Rackspace Analyst Event Tim Bell
3rd Libera Users Meeting
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
CERN openlab Overview CERN openlab Introduction Alberto Di Meglio.
Brocade Flow Optimizer CERN openlab
CERN IT Department CH-1211 Genève 23 Switzerland 3 rd Meeting of the GEANT Experts group Brussels, 10 March 2011 Frédéric Hemmer CERN IT.
Stakeholder Relations at Large-Scale Infrastructures The CERN Model Rolf Heuer 7 th Canadian Science Policy Conference, Ottawa, 26 November 2015.
Geography Review On Map 1, please identify: -Spain -France -England -Russia -Ottoman empire -Persia -China -Mughal India -Songhai Empire.
Country EPS-12 Total (with ICPS) Hungary7979 Germany5559 Romania3841 Ukraine2527 United Kingdom1930 Finland1842 France1616 Italy1616 Poland1313 Switzerland1314.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Introduction.
CERN openlab Overview CERN openlab Summer Students 2015 Fons Rademakers.
The Mission of CERN  Push back  Push back the frontiers of knowledge E.g. the secrets of the Big Bang …what was the matter like within the first moments.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
25-September-2005 Manjit Dosanjh Welcome to CERN International Workshop on African Research & Education Networking September ITU, UNU and CERN.
PH-DT comments on the organisation Livio Mapelli 14 October 2015.
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
Germany and CERN / June 2009Germany and CERN | May Welcome - Willkommen CERN: to CERN: Accelerating Science and Innovation Professor Wolfgang A.
European Innovation Scoreboard European Commission Enterprise and Industry DG EPG DGs meeting, May 2008.
France Ireland Norway Sweden Finland Estonia Latvia Spain Portugal Belgium Netherlands Germany Switzerland Italy Czech Rep Slovakia Austria Poland Ukraine.
CERN August 2013CERN Teacher Programmes1 Designing Effective Outreach Programmes for Teachers at CERN Inspiring the next generation of scientists and engineers.
5-minutes tour of CERN (based on official CERN slides) 5-minutes tour of CERN (based on official CERN slides) Christian Joram / CERN EIROfrum Topical Workshop.
Tax Policy Challenges in a Changing World. Unintended Consequences of Tax Rob Marston, “Window Tax”, 1 September 2010 uploaded via Flickr, creative commons.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
TowerJazz : 18 July 2017 Charles Carayon (Procurement Officer)
The CMS Experiment at LHC
I. Bergevoet - Training preparation
NATIONAL MEDIA VISITS Visits for print, radio, agency media during LS1 April April 2014 Hello, In order to reply to the huge amount of visit requests.
CERN and the High Luminosity LHC Project
European Organization for Nuclear Research
Jean-Michel Favre (CERN Legal Service)
The 5 minutes tour of CERN The 5 minutes race of CERN
Options for association and collaboration with CERN
Purchasing supplies at CERN
DISTRIBUTION AUTOMATIC - GENERATION
The 5 minutes tour of CERN The 5 minutes race of CERN
First beam impact report
ALIGNMENT RULE PROCEDURE
Snapshot of Global PV Markets
CERN Teacher Programmes
INTRODUCTION TO CERN INDUCTION PROGRAMME
CERN – A Strategic Partner in the Data Revolution
CERN The world’s largest Particle Physics Research Center in Geneva
The European Parliament – voice of the people
The European Parliament – voice of the people
Намалување на загадувањето на воздухот со електромобилност
Adriatic Persian Gulf Map Test #1 Answers.
Adoption, adaptation and applicability of the Global Curriculum in Medical Oncology. Adoption, adaptation and applicability of the Global Curriculum in.
ALIGNMENT RULE PROCEDURE
Adriatic Persian Gulf Map Test #1 Answers.
European representation of respiratory critical care HERMES participants. European representation of respiratory critical care HERMES participants. Countries.
IBM's Geographical Structure and where IBM Global Financing has clients IBM Global Financing, the world's largest IT captive financier, has a total asset.
Perspective of an International Research Center
CERN: from fundamental sciences to daily applications
Prodcom Statistics in Focus
Electrification business
Presentation transcript:

Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE

Accelerating Science and Innovation CERN, 2016Ingo RUEHL / EN-HE2

Conseil Européen pour la Recherche Nucléaire World largest Particle Physics Laboratory (1954) CERN, 2016Ingo RUEHL / EN-HE 3 21 Member Countries Austria, Belgium, Bulgaria, Check Republic, Denmark, Finland, France, Germany, Greece, Italia, Israel, Hungary, Holland, Norway, Poland, Portugal, Slovakia, Spain, Sweden, Switzerland, UK. Yearly Budget ~1100 MCHF (~ 1000 MEUR) Experiments financed externally. 7 Observers Countries EU, USA, Russia, India, Japan, Turkey, UNESCO Personnel 2300 Staff 730 Fellows & Associates 200 Students Users from 500 universities 2000 External companies 1 Associate Country Pakistan 2 Candidate Countries Romania and Serbia

CERN, 2016Ingo RUEHL / EN-HE 4 CERN is a Global Lab

 Push forward the frontiers of knowledge e.g. the secrets of the Big Bang …what was the matter like within the first moments of the Universe’s existence?  Develop new technologies for accelerators and detectors Information technology - the Web and the GRID Medicine - diagnosis and therapy  Train the scientists and the engineers of tomorrow  Unite people from different countries and cultures CERN, 2016Ingo RUEHL / EN-HE 5 The Mission of CERN

CERN, 2016Ingo RUEHL / EN-HE 6 The next scientific challenge is to understand the very first moments of our Universe after the Big Bang LHC s

CERN, 2016Ingo RUEHL / EN-HE 7 The CERN Accelerator Complex

A collider situated in a 100m underground 27 km (almost) circular tunnel which accelerates two proton beams to 7 TeV CERN, 2016Ingo RUEHL / EN-HE 8 The LHC 1982 : First studies 1994 : Project Approved by the CERN Council 1996 : Final Decision and start of the construction 2004 : Installation Starts 2006 : Hardware Commissioning Starts 2008 : End of Hardware Commissioning : Physics 10 GJ = 55 km/h

CERN, 2016Ingo RUEHL / EN-HE 9 The ATLAS Experiment

I. Ruehl / CERN LiftEx 2015, Liverpool 10 CERN Structure 2016 DIRECTORATE Director-GeneralFabiola Gianotti Director for Accelerators and TechnologyFrédérick Bordry Director for Research and ComputingEckhard Elsen Director for Finance and Human ResourcesMartin Steinacher Director for International RelationsCharlotte Warakaulle Occupational HSE Protection UnitS. Baird DEPARTMENT HEADS BeamsPaul Collier EngineeringRoberto Losito Experimental PhysicsManfred Krammer Finance and Administrative ProcessesFlorian Sonnemann Human ResourcesAnne-Sylvie Catherin Industry, Procurement and Knowledge TransferThierry Lagrange Information TechnologyFrédéric Hemmer TechnologyJosé Miguel Jiménez Theoretical PhysicsGian Francesco Giudice Site Management and BuildingsLluis Miralles

CERN, 2016Ingo RUEHL / EN-HE11 The Engineering Department

The mandate of the Handling Engineering (HE) Group is to provide transport and handling services for the technical infrastructure of CERN, accelerators and experiments. This includes the design, the tendering/procurement, the installation, the commissioning, the operation, the maintenance and decommissioning of standard industrial and custom built transport and handling equipment. EN-HE Group CERN, 2016Ingo RUEHL / EN-HE12

EN-HE Transport and Handling Equipment CERN, 2016Ingo RUEHL / EN-HE Cranes / 800 Hoists 2000 Lifting Beams 80 Working Platforms 400 Lifting Equipment 100 Tractors 50 Special Vehicles About 4000 assets in Total 130 Lifts

IT-4130/EN replacement of personnel lifts up to 2t capacity in tertiary buildings on Swiss and French territory 11 lifts between 2016 and 2020 CERN, 2016Ingo RUEHL / EN-HE 14 Bidders’ Conference