2011-02-01E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.

Slides:



Advertisements
Similar presentations
FC7 AMC FMC carrier for CMS
Advertisements

CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Development of an ATCA IPMI Controller Mezzanine Board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade Nicolas Dumont Dayot, LAPP.
First test results with the Gigabit Link Interface Board (GLIB) Paschalis VICHOUDIS CERN PH-ESE-BE on behalf of the GLIB team (M. Barros Marin,
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
XTCA projects (HW and SW) related to ATLAS LAr xTCA interest group - CERN 07/03/2011 Nicolas Letendre – Laurent Fournier - LAPP.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
The CMS Modular Track Finder (MTF7) Trigger Board D. Acosta, G. Brown, A. Carnes, M. Carver, D. Curry, G.P. Di Giovanni, I. Furic, A. Kropivnitskaya, A.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
TBD The Matrix Card Status and Plans Dr. John Jones Princeton University
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
Creotech Instruments Jacek Kosiec On behalf of.
Counting Room Electronics for the PANDA MVD
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Current DCC Design LED Board
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
A Compact Trigger Architecture for SLHC
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
HCAL Data Concentrator Production Status
uTCA A Common Hardware Platform for CMS Trigger Upgrades
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Status of the oSLB project
AMC13XG (XG = Ten Gigabit)
MaPSA-Light Chip Test setup firmware Brown: M. Narain and others
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
FED Design and EMU-to-DAQ Test
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University

E. Hazen -- Upgrade Meetings2 Introduction AMC13 specs agreed by most interested parties As detailed in MicroTCA WG document Design Overview Management functions Open issues Status and plans

E. Hazen -- Upgrade Meetings3 Spartan 6 Virtex 6 GTX SFP GTX SFP GTX SFP GTX IO SFP? CDS 128 Mbyte DDR3 GTP MMC uC Flash IO TTC DAQ GbE Spare IPMI GbE JTAG LEDs MCH1 Front Panel via T3 Fabric A £ GB/s Fabric B 80 MB/s CLK F/O 40.xx CLK To AMCs AMC13 Block Diagram (Evolving)

E. Hazen -- Upgrade Week4 AMC Board Stack T1 T2 T3 T4 New custom T1 base board MMC functions (as AMC-13) TTC optical rx 3 or 4x SFP Cross-over GbE from MCH1 for controls and local DAQ Clocks board Clock / controls fanout T3 board Provides JTAG / LEDs on front panel Crosspoint switch for trigger applications (could be omitted if some other solution is found for front panel) Base configuration has only tongues 1, 2 Base board - With optics and HS links (Fabric A) Clocks board - distributes LHC clock and controls Mezzanine connector for T3 with IPMI T3 has JTAG and LEDs Connector to T3 provides: Power Serial bus (SPI or I2C) from MMC Front-panel signals: JTAG or SPI for miniUSB Status LEDs

E. Hazen -- Upgrade Meetings5 Management Functions MMC: Minimal requirements. Prefer Atmel AVR. No space for mezzanine card  Power control; bootstrap selection for FPGA firmware Firmware: Initial bootstrap via JTAG on front panel  Loads firmware for Spartan-6 with simple GbE endpoint  Could also be done over IPMI if speed is sufficient Further firmware loads over GbE via MCH1 Select simple firmware via IPMI when required

E. Hazen -- Upgrade Meetings6 Hardware Issues – Tentatively Settled DAQ Interface Should we switch to SFP+ now? Yes... quad SFP+ is used on GLIB and should fit OK. Keep GTX SERDES. If 10Gb/s is needed, future upgrade (before 2017) TTC Interface Various ideas for upgrade on the table; none is directly compatible with current hardware. Keep current home- brew TTCrx and provide spare SFP+ for upgrades. MMC 0n AMC13. Will adopt a reference design, likely either DESY/CPPM/CERN or Wisconsin, based on Atmel uC.

E. Hazen -- Upgrade Meetings7 Status and Plans Design Underway Most issues regarding interface with rest of CMS settled... need to be sure we are all set with the uHTR First prototype hardware could be ready by May 2011 and there are at least two non-hcal users ready to start testing boards (Imperial College, Wisconsin)  Likely to be funding limited :( Firmware Development Many options here... depends on users  BU is committed to developing HCAL firmware  Trigger users may well develop their own... this is fine