HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.

Slides:



Advertisements
Similar presentations
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
Andris Skuja: US CMS Annual DOE/NSF Review, May 19, CMS HCAL Report US CMS HADRON CALORIMETER REPORT Andris Skuja University of Maryland US CMS Annual.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
1 Cost Estimate (and configuration) Drew Baden Univ. Of Maryland July 2001.
RBX Cooling Dan Karmgard for the HCAL RBX Group. 1 Mar 01 2RBX Production Readiness Review - D. Karmgard, University of Notre Dame Outline Introduction.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN USA.
DRAFT HCAL digital optic link and trigger mapping DRAFT.
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
HCAL Fall meeting Oct 11 to 13, 2004 HF assembly, commissioning and integration Ianos schmidt The University of Iowa.
MTCC –II & HCAL noise chasing Mandakini Patil India-CMS meeting Jan07 Shantiniketan.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
Proposal by the Numbers 3 Trigger layers (plus 2 “short” layers) provide full coverage to eta=??? in 15 degree sectors Hits collected in real time, sent.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
CALOR2006 June 7, Julie Whitmore Fermilab Overview of the CMS Hadron Calorimeter.
Detector Cabling and Patching Rainer Schwemmer
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
RM->HTR cabling organization pawel de barbaro, apr , Agreed on april-20, 2006.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
HE NgCCM integration issues Ianos Schmidt, August 26, 2015.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
CMS ROC Report Patricia McBride May 26, 2005.
HF “Slice test box” installation
Update of MVD services and requests
Update on ‘Real estate’ for Level-0
HF “Slice test box” fabrication and installation
T1 Electronic status Conclusions Electronics Cards:
HB RM prototypes Ianos Schmidt Aug 17, 2017.
HB RM prototype component status
ROBOX modification plans
288 channel HE RBX? A conceptual exercise, NOT a proposal
Fiber Installation for RUN 3&4
HF Test station at P5 A.Mestvirishvili.
SCT/Pixel Draft Rack Layout rcj
Regional Cal. Trigger Milestone: Major Production Complete
HCAL Configuration Issues
Synchronization Policy: HCAL will follow ECAL as much as possible
Overview of T1 detector T1 is composed by 2 arms
UXC55 ME Muon Endcap On Detector Layout
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
TOF & BB FEE Safety Review
FED Design and EMU-to-DAQ Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa

HCAL Fall meeting, Nov 11-13,`04 HCAL HTR crates to RTC crates mapping

HCAL Fall meeting, Nov 11-13,`04 Detector view of HB/HE to RTC mapping

HCAL Fall meeting, Nov 11-13,`04 Layout of HCAL HTR racks in row F on the second floor of USC55 L M SL L S SS M MM HE “Far side” fibers must reach to here (Fibers from RBX #’s 4 to 9) HE “middle” fibers must reach to here (Fibers from RBX #’s 1 to 3 and 10 to 12) HE “near side” fibers must reach to here (Fibers from RBX #’s 13 to 18)

HCAL Fall meeting, Nov 11-13,`04 Cable length database table for HE(-) on-detector Digital optic cables Medium Long Short Medium General safety contingency 1.0m Longest “long” cable 23.1m Longest “medium” cable 20.2m Longest “short” cable 17.3m Delta = 2.9m

HCAL Fall meeting, Nov 11-13,`04

Tower Mapping for HE RM2, 3 QIE Ch.# HE Tower Card1 Card2 Card f 19r m 20f 2 25f 29m 21r 3 25r 23f 21f 4 18f 27r 19f 518r 23r 20r f – front section; m – middle section; r – rear section Tower Mapping for HB QIE Ch.# HB Tower Card1 Card2 Card3 0 16r r f f Tower Mapping for HE RM1, 4 QIE Ch.# HE Tower Card1 Card2 Card f 19r m 20f 2 26f 29f 22r 3 26r 24f 22f 4 18f 28r 19f 5 18r 24r 20r

HCAL Fall meeting, Nov 11-13,`04

Detector view of HF mapping

HCAL Fall meeting, Nov 11-13,`04

HF HTR crates

HCAL Fall meeting, Nov 11-13,`04 HO? HO crates are divided into 90 degree segments, with each RM covering 15 degrees. A 90 degree slice across all HO rings requires 13.5 HTR’s. There are many possible ways to map RM fibers to HTR’s. Are there any patterns such as muon triggers… that require a particular mapping of HO signals?

HCAL Fall meeting, Nov 11-13,`04 Detector view of HO (rings -1 & -2)

HCAL Fall meeting, Nov 11-13,`04 Calibration module readout fibers and HTR’s There are at least three options for organizing the calibration readout. 1.keep Calibration readout in time with signal readout. –Results in having many half used HTR’s 2.Have calibration HTR’s in the crates with associated RBX signal HTR’s. –Calibration readout will be delayed in relation to signal. –Patching is not “modular”, best solved by dedicated calibration patch panel. –6 out of 8 fibers would be used in every HTR input. 3.Have all calibration HTR’s in dedicated crate. –Calibration HTR’s would not be on same partition as the associated RBX’s. –HTR’s could be fully utilized.

HCAL Fall meeting, Nov 11-13,`04 HB/HE Calibration module readout map option 2.