Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Limits of the current VTCS Ann Van Lysebetten Bart Verlaat Martin van Beuzekom VELO upgrade meeting 14/11/2008 pix module construction kick-off 09/11/2009.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
NA62 CV activities Piero Valente 5 th September
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
A two-stage system for the future cooling system.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
BGV 23-feb-2016CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and plans reporting on behalf of EN-CV (Sylvain Nichilo & Olivier Crespo-Lopez)
S A Griffiths CM42 June 2015 Electrical & Control.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
EN-CV activities for LHC during LS2
IBBelle: Status & Plans
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IT-4189 Supply and installation of a cryogenic distribution system
Francois and Lau EATM 17 July 2012
1.3-GHz Cavity Vacuum Furnace at IB4
cooling for BGV modules
Transfer lines status 10/11/2016 O.Crespo-Lopez.
M. Battistin CERN EN/CV/DC 9th July 2009
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Aachen Status Report: CO2 Cooling for the CMS Tracker
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
MAUVE CO2 cooling review
CEDAR Detector Ventilation System Review
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
LHCb & EYETS
Insertable B Layer Cooling System
EN-CV: P8 systems and Detector Cooling
Magnet electrical and hydraulic (dis)connections for coating
Recirculating CO2 System
IBBelle: Status Commissioning at MPP Transport to KEK
Aachen Status Report: CO2 Cooling for the CMS Tracker
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH 1 & 2 Detectors cooling machines -VELO CO2 transfer lines -MUON ventilation units STATUS - PLANNING

Cooling machines production Inner Tracker / Tracker Trigger Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 -test at Contractor’s premises partially failing: heat intake from pumps engines exceeding expectations, new exchangers and compressors needed to be installed  modifications performed -new tests to be done on site to validate thermal performances -connection to transfer lines, water and air networks, backup chiller, cabling, construction of retention bund, connection to waste water  done -powering  done by TS/EL -filling up with C6F14  concluded -backup chiller  installed and cabled -electric and control cubicle tested, functionalities checked, XBT control panel verified, few minor modifications demanded NEXT STEPPerformance test with dummy load on the stations only

Cooling machines production OT/SPD/PS - RICHes stations Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 -performance tests at Contractor’s premises simulating heat charge and impedance  satisfactory -connection to transfer lines, water and air networks, backup chiller, cabling, construction of retention bunds, connection to waste water  done -powering  done by TS/EL -filling up with C6F14 for RICH  concluded -refill line from demineralised water network  done Thanks to Sylvain and DBS team for stations and tanks handling NEXT STEPComplete test on the cooling loop

COMMISSIONING strategy Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 Pre-acceptance: - Test with dummy load on IT/TT Final acceptance : - Hydraulic test on detector cooling loops Final commissioning worth to be perfomed individually for each cooling station at the presence of the company  agreement ongoing

-provisional acceptance on the four machines will start as the corresponding percentage over global contractual amount defined [two days for RICH and OT, five for IT and TT] -final request shall be sent at the soonest to INEO ALPES containing a likely date for commissioning on detector cooling lines -inner cooling loops shall be previously pressure and leak tested Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 COMMISSIONING strategy

VELO CO2 transfer lines Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 -Concentrical lines installed, pneumatic pressure test [125 bar] and helium leak test [10-7 mbar l/s] successfully performed, insulation partially installed -Modification to be evaluated with LHCb, agreed and planned with SIMIND

MUON ventilation units Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 List of material [orders out, latest delivery in about 1 month]~ 45 kCHF -Flexible hoses AIRSPIR PUR polyurethane polyether transparent, DI 30 mm -Blowers ELEKTROR [2 x 6.5 kW, 2 x 10.5 kW] 280 mbar outlet pressure -Distribution manifolds brazed copper 8 spurs -Post coolers 5410 kW for mixed water connection [12.9 l/min each] -Accessories [thermoswitch, pressoswitch, reductions, …]  control [via DSS] strategy to be discussed