GOMOS Mission and Processing Status On 22nd March 2003 GOMOS suffered the anomaly ‘Azimuth Voice coil command saturation”. The anomaly occurred during.

Slides:



Advertisements
Similar presentations
ERS - ENVISAT SYMPOSIUM Gothenburg October, 2000 GOMOS GOMOS Calibration and Processor Verification Instrument Principle Calibration Instrument and.
Advertisements

Data processing and quality control activities in support to the GOMOS mission F. Niro (1), D. Del Cavallo (1), G. Barrot (2), T. Fehr (3) (1) Serco SpA,
Data processing and quality control activities in support to the MIPAS mission F. Niro (1), T. Fehr (2) (1) Serco SpA, ; (2) ESA/ESRIN,
MIPAS Quality assessment of ENVISAT Atmospheric mission: implication for the scientific user community The monthly reports for each instrument.
Page 1 SCIAMACHY Pointing Meeting Bremen – 30 November 2006 MIPAS Pointing Error Status Gaétan Perron ABB Bomem Inc.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First Level 1b General Product Quality.
Tsunamis Detection The Mission  Tsunamis Detection can help to minimize loss of life and property from future tsunamis. Mission Introduction Mechanism.
Page 1 Reduced Resolution Retrievals from MIPAS / MORSE and Oxford Level 2 Monitoring Alastair Burgess and Anu Dudhia Atmospheric, Oceanic and Planetary.
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS Instrument & VIRS Calibration.
Shu Zhang (on behalf of the HXMT team) Institute of High Energy Physics, Chinese Academy of Science The current status of HXMT and its calibrations.
The ENVISAT-ESA Atmospheric-Chemistry dataset: operational data availability and re-processing status F. Niro (1), G. Brizzi (1), A. Dehn (1), L. Saavedra.
Aerosol Climate Change Initiative Stratospheric activities around the Aerosol_CCI project C. Bingen, C. Robert, A. Bourrassa & Aerosol_CCI Team F. Vanhellemont,
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
The Hard X-ray Modulation Telescope Mission
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
EUMETSAT, July 2013 Coordination Group for Meteorological Satellites - CGMS Satellite Event Working Group by EUMETSAT Presented to CGMS-41, WGII/3.
® Kick off meeting. February 17th, 2011 QUAlity aware VIsualisation for the Global Earth Observation system of systems GEOVIQUA workshop February, the.
Page 1ENVISAT Validation Review / GOMOS session - ESRIN – 13th December 2002 ENVISAT VALIDATION WORKSHOP GOMOS Recommendations by the ESL team : Service.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
Xin Jin 1, Yong Han 2, Ninghai Sun 1, Fuzhong Weng 2, Denis Tremblay 3, Yong Chen 4, Likun Wang 4, Xiaozhen Xiong 1 1 ERT, Inc., 2 NOAA/NESDIS/STAR, 3.
Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra.
Page 1 Envisat Validation Workshop, ACVT-GBMCD, GOMOS O 3 (r) 12/12/2002 ACVT-GBMCD subgroup GOMOS ozone profiles, analysis of comparison with GMBCD datasets.
C H A M P International Laser Ranging Service - General Assembly, October 2005 Eastbourne, UK L. Grunwaldt, R. Schmidt, D. König, R. König, F.-H. Massmann.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Nine Years of Atmospheric Remote Sensing with SCIAMACHY – Instrument Performance Gottwald, Krieg, Lichtenberg, Slijkhuis – DLR-IMF Noël, Bramstedt, Bovensmann,
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
CGMS-43-ISRO-WP-03, version-1, CGMS WGIII May 2015 Coordination Group for Meteorological Satellites - CGMS ROSA Data Processing at ISRO Presented.
EUM/OPS/VWG/11/3248 Issue 1 04/09/2011 Eumetsat Conference, 3-7 September 2012, Sopot, Poland Satellite Event Working Group GSICS Workshop, 4 September.
Temperature dependency of ACC data TUD provides all available GPS-derived linear accelerations to VZLU End of January – end of May To be used for validation.
한 미 려 – Introduction (1) 2.Instrument & Observe 3.Science 2.
ESA Climate Change Initiative Sea-level-CCI project A.Cazenave (Science Leader), G.Larnicol /Y.Faugere(Project Leader), M.Ablain (EO) MARCDAT-III meeting.
ERS-2 Scatterometer: Instrument and data performances assessment since the beginning of the mission R. Crapolicchio (1), G. De Chiara (1), A. Paciucci.
- EQUAL - Envisat Quality Assessment with Lidar a project to support the long-term validation of SCIAMACHY’s ozone and temperature profiles in opbouw.
ACC/GPSR Splinter Summary
ACC and GPS summary Christian Siemes, QWG and Cal/Val team Copenhagen, Denmark 18/06/2014.
Validation status overivew
Hardware & Software Reliability
Fangfang Yu, Fuzhong Weng, Xiangqian Wu, and Ninghai Sun
Calibration Events Working Group GSICS TeleConference 23 October 2012
Validation status overivew
Dehn(1), F. Niro(1), A. von Bargen(2), T. Fehr(3)
Status of ACVE-3/pre-validation recommendationss 21. 6
OMI OPERATIONS OVERVIEW
GLAST Large Area Telescope:
Ozone monitoring with GOMOS-ENVISAT experiment version 6
KLAUS KDA4 – Solar Irradiance Monitoring Application
Analysis Ready Data ..
Gamma-ray Large Area Space Telescope
Verifying the DCC methodology calibration transfer
NOAA Report on Satellite Data Calibration and Validation – Satellite Anomalies Presented to CGMS-43 Working Group 2 session, agenda item 3 Author: Weng.
On-Orbit Performance and Calibration of the HMI Instrument J
R. Bucˇık , K. Kudela and S. N. Kuznetsov
Proposal for LAT Year 1 Data Release Plan
Risk Management with Minimum Weight
Use of NWP+RTM as inter-calibration tool
BESIII EMC electronics
Launch and On-orbit Checkout
Monitoring VHE Extragalactic Sources with ARGO-YBJ detector
Dorothee Coppens.
ETS – Air Data submission Training
Walk in – Prior Knowledge
Implementation of DCC algorithm for MTSAT-2/Imager
GLAST Large Area Telescope
MIPAS-2D water database and its validation
The Vertical Structure of the Martian Ionosphere
GLAST Large Area Telescope:
Presentation transcript:

GOMOS Mission and Processing Status On 22nd March 2003 GOMOS suffered the anomaly ‘Azimuth Voice coil command saturation”. The anomaly occurred during the rallying of the telescope in the preparation for the star observation. The problem was in a wire and it was decided to switch the instrument and the ICU (Instrument Control Unit) to side B. GOMOS restarted the operations on 17th July On 25th January 2005 GOMOS suffered the anomaly ‘Elevation Voice coil command saturation”. The anomaly occurred during the rallying of the telescope in the preparation for the star observation. GOMOS is in operations again since 29th August 2005 in a new operations scenario which foresees that in case of a failure the ICU ignores the error and rallies the telescope to the position of the following star observation. The azimuth angle range has been reduced in order to limit the anomaly occurrence. The GOMOS mission is now on-going with the same product quality as before the anomalies. The main impact of the second anomaly on the GOMOS mission is the reduction of the data availability: from 35 occultations per orbit to 22 occultations due to the restriction in azimuth angular range. Users are supplied with data sets reprocessed by the last prototype processor GOPR_6.0c_6.0f developed and operated by ACRI. The next GOMOS operational ground segment version (GOMOS/5.00) foreseen to be in operations at mid June 2006 will be in line with the prototype version used for this second reprocessing. All reprocessed data can be retrieved via web query from FTP access to bulk reprocessing results (one tar file of GOMOS products per day) is allowed from the D-PAC: ops.de.envisat.esa.int. See more details and latest status on Instrument and Products monitoring Fig-1: Acquisition problems detected Performance assessment Beside the daily monitoring, the evolution of key parameters is important for assessing the instrument performance and for mission evolution and calibration plan definition. Examples are shown here below. Further details can be found in the GOMOS monthly report available on-line: Tracking performance The SATU (Star Acquisition and Tracking Unit) health is essential for GOMOS instrument, which is based on star pointing and tracking mechanism. The SATU NEA monitoring consists in computing the average values of the SATU standard deviation above 105 km. On fig-6 it can be observed a change in trend between Sep-Dec The cause of this unexpected behavior is under investigation although the values were always below the thresholds. The MIP (Most Illuminated Pixel) The MIP is the star position on the SATU CCD in detection mode. The nominal centre of the SATU is pixel number 145 in elevation and number 205 in azimuth. The detection of the stars should not be far from this centre. After the 2 nd major anomaly the Azimuth and Elevation MIP have a drift that has no explanation (fig-5). Although it does not impact the data quality or the star location on the CCD array during the measurements, it may invalidate attitude monitoring by GOMOS and could represent a hidden anomaly. Daily checks on GOMOS telemetry, level 0, level 1b and level 2 data are performed in order to detect any instrument or products anomaly. The monitoring of level 2 products consist mainly in checking the quality flags and the number of flagged points per profile. An example is given on fig-3. The high percentage of flagged points was due to a high percentage of "geolocation flag" set. This means that a high percentage of the profile points are located outside the atmosphere. Indeed, special observations were performed at altitude range of km (nominal is km) for the study of the reflectivity. Acquisition probability The number of star target failed during centering phase (before tracking phase) is monitored (fig-7). A high percentage of star loss will trigger the rejection of a specific star from the catalogue in order to guarantee the maximum number of stars measured and available for the users. The star id 115 was lost 40% of the times but it was planned to be occulted five times and was lost twice (high percentage of loss not statistically significant). For the moment, no stars have been removed from the star catalogue. Now with the instrument in a new operation scenario, users should be aware on the fact that the stars are also lost due to the anomaly “elevation voice coil command saturation” even if the instrument is not going anymore to Stand by / Refuse mode. Fig-6: SATU NEA through the mission Fig-7: Statistics of stars lost during centering phase Quality assessment of ENVISAT Atmospheric mission: implication for the scientific user community Monitoring activities in support to ENVISAT The quality assessment activities of ESA Earth Observation missions (ERS, ENVISAT, GOCE in the future ) are today performed by the DPQC organization, a Serco-Datamat consortium of specialized companies which provides a service to ESA. The DPQC atmospheric team, which involves expertise from Serco, ACRI and DLR, is responsible for the monitoring of the three ENVISAT atmospheric mission (GOMOS, MIPAS and SCIAMACHY). The satellite instruments are subject to performance degradation due to the aging of mechanical and electronics components or to the impact of platform and on-ground anomaly. Besides, the operational processor, which generates the products, is a compromise between extraction of optimal information from the measurement and the constraints of processing and dissemination resources. As a result the quality of the products arriving to the scientific users community can be variable due to several anomalies. The quick detection of instrument or products anomaly is then crucial for instrument safety and for optimization of data quality. In this poster we will address this problem considering the ENVISAT GOMOS instrument. The quality control baseline will be outlined and some examples of significant daily and long term monitoring will be reported; furthermore the implications of this activity for the scientific users will be underlined. Introduction Abstract The objective of this poster is to highlight the importance of the instrument and products monitoring and to show the implication of this task for the scientific users community. We focus our attention on the GOMOS instrument on-board the ENVISAT ESA platform and we present some example of quality monitoring results which have significant impact on science data quality. The DPQC group is furthermore responsible for many other activities related to the operational mission support. The DPQC tasks for the ENVISAT mission support can be summarized in the following: Daily and long term monitoring of instrument health Daily and long term monitoring of products Anomaly investigation and performance assessment Calibration activities and delivery of auxiliary data files Maintenance and support for IPF evolution and implementation Mission support, reporting and attendance to progress meetings Answer to general request from users Important information for each instrument are publicly available on the web at the ESA-Product Control Service web page (see screen shot on the right). In particular, monthly reports are available at: MIPAS GOMOS SCIAMACHY Instrument unavailability Products disclaimer General request Source of information The level 0 monitoring consist in checking mainly the instrument missing packets. When many instrument source packets are missing in level 0 products it is probable that acquisition problems have occurred at the stations. This should be communicated as soon as possible in order to correct the error and avoid the acquisition of useless data. An example of L0 monitoring is given in fig-1 where some level 0 files show acquisition problems. Level 0 Concerning L1 monitoring, significant indicators are the ADF usage, the quality flags, the SATU noise equivalent angle, dark charge level, CCD temperatures and the altitude of star loss. An example is given on fig-2 when a high percentage of cosmic ray flag was raised over the poles due to the eruption of a giant sunspot on 17th and 20th January The South Atlantic Anomaly is also visible. Level 2 Level 1 Dark charge monitoring The temperature dependence of the DC would make this parameter a good indicator of the DC behavior, but the hot pixels and the RTS are producing a continuous increase of the DC since the beginning of the mission. “Hot pixels”, a pixel is “hot” when its dark charge exceeds its value measured on ground, at the same temperature, by a significant amount. RTS phenomenon (Random Telegraphic Signal), it is an abrupt change (positive or negative) of the CCD pixel signal, random in time, affecting only the DC part of the signal and not the photon generated signal. The trend of DC is of crucial importance for the final quality of the products, and is therefore subject to intense monitoring. Fig-4 shows the DC increase for the spectrometers A1, A2, B1 and B2. The modulation is given by the seasonal temperature variation of the detectors. Fig-3: Percentage of flagged points per profile Fig-2: Percentage of cosmic ray hits per profile Fig-5: MIP position through the mission Stabilization after new PSO algorithm for satellite pointing: Dec 2003 After 2 nd GOMOS major anomaly Fig-4: DC increase for the spectrometers A1, A2, B1 and B2.