Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra.

Similar presentations


Presentation on theme: "Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra."— Presentation transcript:

1 Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra de Miguel Roberta Mantovani Presented by Paul Snoeij

2 Sciavalig – 6-8/12/2004 Overview FSCIAMACHY FCalibration Data Processing Status FOperational NRT Data Processing Status FOff-Line Data Processor Status FFull-Mission Data Processing Status FValidation Data Processing Status FData Dissemination FMIPAS FGOMOS FACVT Long Term Validation

3 Sciavalig – 6-8/12/2004 Calibration Data Processing Status 2002,2003, 2004 recalibration completed 2004 forward calibration with IECF operational since 8 May 2004 Important improvements to calibration are part of the current processor improvement cycle. For recalibration, a dedicated chain is under development Recalibration will also involve use of a restituted attitude file to correct mispointing

4 Sciavalig – 6-8/12/2004 Operational NRT Data Processing Data Processor –IPF 5.04 : bug-fixed version of 5.01, sharing exactly the same Algorithm Specification (DPM L1-2C/L2-2A, IODD L1-5A/L2-3C, Product Specification 3H). Processor Configuration –Key Data Nadir 3.0, Limb 2.4 Products from the Infra-Red channels are part of the current Level 1B improvement cycle (baseline specification nearly completed)

5 Sciavalig – 6-8/12/2004 Off-Line Data Processor Status Current Processor version 2.5 IODD 4E (November 2004), Product Specification Document 3J (December 2004) Integration has begun after above delivery Target date for operations: Important improvements to level 2 off-line processing are part of the current Level 2 improvement cycle (baseline specification nearly completed)

6 Sciavalig – 6-8/12/2004 1 st Full-Mission Data Processing Percentage per cycle, of available data processed

7 Sciavalig – 6-8/12/2004 Data dissemination Dissemination of level 1 and level 2 via nominal channels –NRT Kiruna: ftp-ops.pdk.envisat.esa.int –NRT Esrin: ftp-ops.pde.envisat.esa.int –(Reprocessed) Off-line: ftp-ops.de.envisat.esa.int –U/P: scia2usr / scia2usr

8 Sciavalig – 6-8/12/2004 MIPAS Space Segment Status Nominal MIPAS operations have ceased in March 2004 A team involving ESA, Instrument Prime, and Expert Support has been formed. The team defined dedicated investigations. Numerous tests have been executed between March and November, including pre-operational modes. No anomaly-free operations mode has been found thus far, but several modes involve low risk to the instrument. An Anomaly Review Board meeting is held on 7 December to review the future operations scenario. Generalisations to the data processor are currently being implemented to allow processing of the various modes

9 Sciavalig – 6-8/12/2004 GOMOS Space Segment Status The instrument generally operates reliably, since the operations have been transferred to the redundant electronics on 17 July 2003 The CCD detector performance sensitivity to radiation impact has remained stable. The leakage current trend has remained stable. All other subsystems (in particular tracker) show performance that meets and exceeds requirements

10 Sciavalig – 6-8/12/2004 Status of the Envisat Atmospheric Chemistry Validation SCIAVALIG 6–8 December 2004 Paul Snoeij European Space Agency Earth Observation Programmes

11 Sciavalig – 6-8/12/2004 ACVT Long term validation Fill in the gaps not covered during the main validation phase. To monitor performance degradation. Regular, optimised, repetition of the essential elements of the main validation. The long-term validation has to be continued during the lifetime of the instruments.

12 Sciavalig – 6-8/12/2004 Long term validation sources Long term validation is performed by using –ground-based instruments -> TASTE & EQUAL –airborne / balloon instruments -> ESABC –satellite instruments -> Univ. of Bremen A set of ‘standard’ stations and campaigns have been defined to monitor the operational product quality. Apart from the ‘standard’ set, also well- defined measurement campaigns are defined.

13 Sciavalig – 6-8/12/2004 ACVT Long term validation schedule

14 Sciavalig – 6-8/12/2004 ESABC-2004 Schedule

15 Sciavalig – 6-8/12/2004