1 Cost Variance Rules  Explanations should use words that clearly indicate the reported category  Changes due to different change categories should not.

Slides:



Advertisements
Similar presentations
VERSION 7 Examples of the stylish new design VERSION 7 Examples of the stylish new design 5 th December 2010 © Copyright Benchmark Estimating 2010.
Advertisements

New Cost Estimate Template Issued: December 11, 2014 Effective: January 5, 2015.
Management: Analysis and Decision Making
PM Refurbishment Orders for Material Repairs
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
What is Project Cost Management?
HIT241 - COST MANAGEMENT Introduction
Manufacturing Planning and Control
Office of Acquisition and Property Management Completing an Effective Project Data Sheet (PDS)
4 -1 Data Normalization Chapter Data Normalization One of the most challenging and perennial problems confronting the cost analyst is the identification.
GETTING STARTED Workshop Track A Wednesday, June 5, 9am-10am Gretchen Donehower University of California at Berkeley, Demography United States.
ENGINEERING ECONOMICS ISE460 SESSION 16 June 23, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? New homework – Random Variable IRR –Review –Multiple.
Law of Demand!!!!.
CCMIS R 3.2 Fiscal Policy/System Training May 2006.
4 -1 Data Normalization Chapter Data Normalization One of the most challenging and perennial problems confronting the cost analyst is the identification.
| See the possibilities… Item Template Basics.
DEFENSE ACQUISITION MANAGEMENT INFORMATION RETRIEVAL DAMIR Funding Formats Klif Hodgkin CACI DAMIR Team Presenter.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
How to Review a SAR (Key attributes of a good SAR) October 2007 DAMIR Conference Dana Harrison (703)
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
DWR Templates SiteManager 3.1a-2 Sheri Meyerhoff Indiana Department of Transportation September 8, 2003.
FY12 BUDGET PRESENTATION January 25, Key Revenue Assumptions  Property Tax Change per 2 1/2  State Aid is level funded  Estimated Receipts.
Project management Topic 2 Planning.
Budget Revision Process Overview. Budget Revisions  Revisions are used to transfer funds between Departments and/or accounts.  Revisions are also used.
Kentucky Department of Education Superintendents’ Webcast October 23,
Estimates Training Financial Analysis & Accountability Branch May 2012.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
MyFloridaMarketPlace MyFloridaMarketPlace 2.0 Disputing Line Level Exceptions.
1 Modification 0152V Implementation Matters 25 October 2007.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management TALS Draft Conceptual Solution February 24, 2004.
Breakdown Work Structure Applying Management Tools to a Project.
Happy Tuesday  Please get out your notes! PSAT tomorrow – you will only see 5 and 6. Quiz on Thursday. Goals: 1 Explain what the Consumer Price Index.
Light Touch Calculator Growth that doesn’t cost the earth Emma Hutchinson This webinar is designed to introduce you to the Resource Efficient Scotland.
Asset Depreciation Lecture No. 30 Chapter 9
Percentages Revision.
Chapter 9 Cost Planning and Performance
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Journalizing Transactions
CONTRACT ADMINISTRATION
Statistical Intervals Based on a Single Sample
5. Cost resources & PLAN DURATION
Sampling Distributions
DAMIR Funding Formats Klif Hodgkin CACI DAMIR Team Presenter.
Global Youth Tobacco Survey (GYTS): Proposal Development
2.6 Factoring Simple Quadratics
The Pella Approval Process Step one – Check the Special Order Box
Recording Transactions in a General Journal
5. Cost resources & PLAN DURATION
Standard Costing and Variance Analysis
Project Management Metrics
Production Possibilities Curve
Vocabulary: accuracy adjacent angle of depression angle of elevation
Command terms with definitions.
14 MRP and ERP.
What is Project Cost Management?
Project Management Process Groups
April 22, 2010 Standard Costs Chapter 8: Standard Costs.
List/ Name/ Identify You will give information as individual words, facts or points. Use the number of marks as a guide to the number of examples.
Descriptive Analytical
Characteristics Based Dues Rules
Setting Budgets.
COMPLETING AN 8-COLUMN WORK SHEET
May 25, 2009 Standard Costs Chapter 8: Standard Costs.
Chapter 4: Demand Economics Mr. Robinson.
Manage financial resources to ensure solvency
Glossary Of Command Terms
and Forecasting Resources
Presentation transcript:

1 Cost Variance Rules  Explanations should use words that clearly indicate the reported category  Changes due to different change categories should not be lumped together (e.g., estimating and engineering)  Large changes should be broken down into smaller changes, if possible  Explanations of the following DAMIR created changes should not be revised - economic, adjustment for current and prior escalation, quantity allocations)  Check for changes that have opposite base year and then year dollar signs

2 Cost Variance Rules  Economic Changes – Only occurs in the December SAR – Must have a zero base year component – Must use the words “Revised escalation rates.”  Quantity Changes – Should indicate the quantity change (increase or decrease of so many units) and the “from” and “to” quantities – The DAMIR default word “units” should be replaced by the actual end item type (e.g., aircraft) – Quantity allocations should say, e.g., “allocation to schedule variance resulting from quantity change”

3 Cost Variance Rules  Schedule Changes – DAMIR calculated schedule changes (procurement) should have a zero base year component – DAMIR calculated schedule change explanations should be modified to provide detail about schedule change (e.g., procurement profile was extended three years FY2012, buy profile changed from 24 per year to 20 per year for FY )

4 Cost Variance Rules  Engineering Changes – The explanation should contain words that clearly indicate the reported category (e.g., redesign, configuration change, new technology upgrade) – Large engineering changes should be broken out, if possible – The DAMIR default “new engineering change” must be revised to describe the reason for the engineering change

5 Cost Variance Rules  Estimating Changes – The explanation should contain words that clearly indicate the reported category (e.g., revised estimate, change in estimating assumptions) – Large estimating changes should be broken out, if possible – The DAMIR default “new estimating change” must be revised to describe the reason for the estimating change – Adjustment for current and prior should only appear in the December SAR

6 Cost Variance Rules  Other Changes – Use of “Other” requires OSD permission  Support Changes – An explanation of the reason why initial spares has changed should be provided (e.g., “as a result of the quantity increase” or “revised estimate of initial spares requirement”) – “Other” support changes should provide detail as appropriate (e.g., increase in requirements for data and training materials)

7 Cost Variance Rules  Use DAMIR words as is for Economic, Adjustment for Current and Prior, Quantity Allocations.  Modify Total Quantity and True Quantity to identify type of unit (e.g., vehicle).  Modify schedule to provide as much detail as possible. Do not use DAMIR default explanations (e.g., New Estimating Change) for Estimating, Engineering, Other