3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
June 15, 2005Marc Ross (ILC) – Instrumentation Development ILC Instrumentation Development Marc Ross, SLAC.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Philip Burrows BDS, LCWS08 Chicago, 17/11/081 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Thanks to: Mike Woods, Manfred.
Instrumentation and Controls ‘Global Group 2’ Update since Snowmass Thursday, December 8, 2005 Marc Ross (SLAC), for Hans Braun (CERN), Junji Urakawa (KEK),
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Main Linac Integration Work Packages Chris Adolphsen Dec 11, 2007 High Priority Items in Red.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Fermilab Feb.5, 2007, Beijing N.Solyak -1- Main Linac Magnet Systems and Instrumentation Work Packages for EDR Nikolay Solyak, John Tompkins, Vladimir.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
2 nd ILC Accelerator Workshop (Personal Impressions of a Beam Instrumentalist) Manfred Wendt Sept. 7, 2005 Seminar on Beam Instrumentation Techniques and.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
BCD input from WG2 WG2 12/08/2005 H. Hayano Chris Adolphsen Terry Garvey Hitoshi Hayano.
Marc Ross T9 – Snowmass 2001 Closing Plenary T9 – Diagnostics M. Ross/R. Pasquinelli Thursday, July 19 RD: 1) determine mixing between z and x/y 2) determine.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
Philip Burrows BDS Kick-off Meeting, SLAC, 13/10/071 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Mike Woods SLAC Thanks.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
ML (BC) Studies update Nikolay Solyak Arun Saini.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
ILC Beam Instrumentation – Introduction Remarks –
Re-entrant BPM R&D for ILC Main Linac
BDS Instrumentation Philip Burrows Mike Woods
ILC-Americas Regional Team Review
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Testbeam plans for LEP instrumentation
Plans for Laser-wire System Grahame Blair 30th May 2005
Status and Plan of GDE Design Work (Including Road Map for RDR)
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
ILC Global Design Effort
3rd ATF2 Project Meeting, December 18-20, 2006
Electron Source Configuration
Introduction / Comments on instrumentation issues
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
CLIC damping rings working plan towards the CDR
Linac Diagnostics Commissioning Experience
Instrumentation, Controls and MPS
Breakout Session SC3 – Undulator
Presentation transcript:

3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics Challenge to interpret and balance these two sets of requirements; one mature/one not Junji Urakawa (KEK) Philip Burrows (UK)Marc Ross (SLAC)

3/10/2006Marc Ross - SLAC2 Summary presentation: See Fermilab RDR Technical system presentation: Beam position (12000), laserwire (35), imagers (35+), bunch length systems (12), beam phase(1/RF unit), special systems (?) Technical risks and general features POCs: Brachmann, Bharadwaj, Ross, Tenenbaum, Seryi, (need linac)

Where does the information come from: e- DR: Scaled, best guess e+RTMLLinac BDS:Area files 3 basic pickups: Striplines (SL) Buttons (BTN) Cavities(CAV) (RD priority) This is a big system, ~ 10 x LEP, 10 x SLC

Cavity BPM block diagram Linac / RTML/BDS Minimum length RF cabling –Local mixer system –Improved systematics Performance and strategy depend on distance to accessible electronics –(secondary tunnel / support building) Cost drivers: –Precision cables –Digitizer –Mechanical –RD ATCA

3/10/2006Marc Ross - SLAC5 Linac ‘slotted, cleanable’ test cavity (1/2 scale)

3/10/2006Marc Ross - SLAC6 Tests planned for April 2006

3/10/2006Marc Ross - SLAC7 Linac issues: Design Scale error: Dispersion-steering –‘State of the art’ requirement; understanding and demonstration required 1% accuracy requires aggressive calibration process 10% is beyond ‘typical performance’; but can be done No movers in the baseline Cavity proximity Baseline: large aperture Use of cavity Higher Order Modes - dipole & monopole –Active ‘ACD’ RD topic –Sub-micron resolution –Redundancy; cavity offsets –LLRF high accuracy beam phase input RD at ATF, ESA, TTF

TTF ACC3 Cavity HOM centers – Nov 18, 2005 Josef Frisch

TTF ACC3 Cavity HOM centers – March 7, um 400 um Josef Frisch

3/10/2006Marc Ross - SLAC10 Where does the information come from: DR 1 per ring RTMLPT talk (1/31) Linac ½ of warm sections (~ BCD recommended) BDSAS talk (2/13) Laserwire basics: 1.Laser (one can feed many IP’s) 2.Distribution 3.Deflector (scanner) 4.IP (multi-plane) 5.e/γ Separation 6.Detector

3/10/2006Marc Ross - SLAC11 Laserwire Predictors of luminosity in a segmented system –Vital ‘operational’ need Key performance requirements issues remain –Spatial dynamic range: –Usage –Parameters Infrastructure requirements need to be identified –JAI staff assigned to integration task

3/10/2006Marc Ross - SLAC12 Feedback integration Appropriate feedback ‘sensors’ (BPM’s, phase monitors) have not been designated; space has not been allocated –Correctors also needed in many cases Redundancy will be needed for critical (energy, IP phase, ring extraction) Area System feedback ‘POC’ needed