Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.

Slides:



Advertisements
Similar presentations
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Advertisements

1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Cryostat Production Readiness Review January 23, 2002 T. Nicol – Fermilab
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
H. Prin, F. Savary, D. Duarte Ramos, L. Grand- Clement, C. Mucher, A. Temporal.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
R. Ostojic CERN, AT Department. 2 LHC Insertions Experimental insertions in points 1, 2, 5, 8 contain low-beta triplets. In total, eight triplets are.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
C.Hauviller/TS-IC 27 avril April 2007 Summary C. Hauviller Review of the inner triplet.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
CHAMONIX XV QRL installation and first experiences of operation G. Riddone on behalf of the QRL team AT/ACR-cd Acknowledgements to AT/ACR-op and AT/ACR-in.
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Teleconf ACS – FREIA 28th March 2017
ALIGNMENT OF THE NEW TRIPLETS
Status of the low-β triplets
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
MQXC Nb-Ti 120mm 120T/m 2m models
Cold mass design, assembly plans and QA/QC at CERN
Roadmap for triplet cryostats
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
HFM Test Station Main Cryostat
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Cedric Garion, TE-VSC-DLM, WP12
Teleconference ACS – FREIA 31st October 2017
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
The 11T cryo-assembly: summary of design and integration aspects
Cryostat design Mechanical design: Thermal screens: Specifications:
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Teleconference ACS – FREIA 20th February 2018
Cryomodule Assembly Plan
US-LARP Task: IR Commissioning
as a prototype for Super c-tau factory
US-LARP Task: IR Commissioning
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
SC1R Cold Box PDR Assembly Sequence
Simplified Procedure Draft
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and Transport Preparation for Installation Tests carried out in the tunnel Repairs Present Status

Inner Triplet Review 2 H. Prin AT/MEL Reception and Acceptance Acceptance tests to be performed following shipment:  Q1: Acceptance Plan for LQXA LHC-LQX-TP-0002  Q2: Acceptance Plan for LQXB LHC-LQX-TP-0001  Q3: Acceptance Plan for LQXC LHC-LQX-TP-0003  DFBX : Acceptance Plan for Inner Triplet Distribution Feedboxes LHC-DFBX-ES-0001  D1 : Acceptance Plan for Beam Separation Dipoles LBX LHC-MBX-ES-0003 Tests to be perform at CERN according to these documents  Physical inspection  Mechanical measurements  Electrical measurements Coil resistance Quench protection heater resistance Coil inductance Insulation resistance Leakage current measurements Thermometer resistance Warm-up heater resistance

Inner Triplet Review 3 H. Prin AT/MEL Reception and Acceptance Physical inspection in Building 181  Visual inspection of containers and shockwatches fasten on it  Removal of the container and inspection of the transport restraints  Transport data recorder return to sender for analysis  Removal of transport restraints and “spider” inspection

Inner Triplet Review 4 H. Prin AT/MEL Reception and Acceptance Electrical measurements in Building 181  Electrical checks and measurements Coil resistance Quench protection heater resistance Coil inductance Insulation resistance Leakage current measurements Thermometer resistance Warm-up heater resistance Continuity of leads, busses and instrumentation for the DFBX  Polarity checks using a rotating mole  Leak checks on the internal pipes of the DFBX

Inner Triplet Review 5 H. Prin AT/MEL Reception and Acceptance Geometrical measurements in Building 181  Alignment stability Cold mass length Cryostat length Cartography of the tubes at the cold mass ends Cold mass horizontal and vertical shapes Position of the cold mass within the cryostat Comparison with FNAL data OR  Fiducialisation Same as above with different measurement methods Geo Mole + AC Mole measurements to increase the accuracy on the magnetic axis determination

Inner Triplet Review 6 H. Prin AT/MEL Triplet String in Building 181 String assembled in April 2005 with the collaboration of FNAL, AT/CRI, AT/MEL, AT/VAC, TS/IC, TS/SU  Check availability of components and tooling  Assemble interconnects, check tooling and procedures  Perform instrumentation and continuity checks for the string from DFBX  Mount and check alignment equipment  Check string behaviour under insulation vacuum  Check handling equipment

Inner Triplet Review 7 H. Prin AT/MEL Triplet String in Building 181 What was learned:  Validation of most components and tooling for the interconnections  Demonstration of interconnect procedures in conditions close to the ones in the tunnel  Polarity of magnets confirmed in the string  Instrumentation and continuity from DFBX confirmed  Alignment of magnets under vacuum confirmed  Limited rigidity of the jacks and their supports Actions:  Some tools and components had to be improved  Procedures were refined  BPMS signal cables redesign due to interference with Q2 thermal shield  Thermal shield of DFBX/D1 interconnection had to be modified  A software bug corrected in survey applications

Inner Triplet Review 8 H. Prin AT/MEL Handling and Transport Mean(s)ContainerRestraintsData Recorder US to CERN Truck / Boat / (Plane) Q1/Q3Fixation on transport Frame inside a metallic container1 per side Shockwatch Acceleration Recorders Q2Fixation on transport Frame inside a wooden box1 per side D1Fixation on transport Frame inside a metallic container1 per side DFBXFixation on transport Frame inside a wooden boxSprings 181 ↔ storage ↔ Smi2 Truck Q1/Q3 1 per side Schocklogs Q21 per side D11 per side DFBXcovered truck Smi2 ↔ 181 ↔ storage Truck Q1/Q3 1 per side Schocklogs Q21 per side D11 per side DFBXcovered truck Installation Truck Q1/Q3 1 on the non IP side Schocklogs Q2 1 on the non IP side D1 1 on the non IP side DFBXcovered truck

Inner Triplet Review 9 H. Prin AT/MEL Handling and Transport radial direction (R) longitudinal direction (S) vertical direction (T) HCLQXA_001-FL HCLQXA_001-FL HCLQXA_001-FL HCLQXA_001-FL HCLQXA_001-FL HCLQXA_001-FL HCLQXA_001-FL HCLQXA_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXB_001-FL HCLQXC_001-FL HCLQXC_001-FL HCLQXC_001-FL HCLQXC_001-FL HCLQXC_001-FL HCLQXC_001-FL HCLQXC_001-FL RMS HCLQXA_001-FL HCLQXC_001-FL HCLQXC_001-FL Cold mass displacements within the cryostat during transport from the US To CERN 3 assemblies were broken during transport probably due shocks between wagons as they were shipped by train : Q3R8 cold mass has moved by ~3mm during transport to the tunnel without any shocklog alarm

Inner Triplet Review 10 H. Prin AT/MEL Preparation for Installation Mechanical preparation to put the different interfaces in conformity  Thermal shield modification of the D1  Flange replacement to remove NCs (D1 and DFBX) Preparation in Smi2  Cold bore cleaning  Beam screen insertion  Pick up connection  Cold warm transition assembly  Thermal shield closing  MLI insulation  O-Ring seals installation  Vacuum vessel closing  Bearing pieces fixation Preparation of the DFBX in 181  Electrical instrumentation preparation  Frames assembly and instrumentation box  Warm gas recovery line assembly and vacuum test  Control valves installation on each line  Differential pressure valves installation

Inner Triplet Review 11 H. Prin AT/MEL Tests carried out in the tunnel Vacuum tests in L8 (22 Sept. 06) and R8 (17 Nov. 06)  Monitoring the various displacement of the assemblies and supporting system under insulation vacuum Result: OK  Go ahead with the pressure test

Inner Triplet Review 12 H. Prin AT/MEL Tests carried out in the tunnel Pressure test in L8  Guarantee the inner triplet piping mechanical stability under He pressure at warm Result: Test interrupted at 12 bars by X line buckling Cause of rupture : brazed joints anneals the extremities of the tubes  All the exchanger tubes in Q1, Q2, Q3 have to be replaced  Pressure test L5 after repair to qualify X line replacement and the complete design Design Pressure Test Pressure LD1/LD221 bars26bars CY/XB5bars6bars

Inner Triplet Review 13 H. Prin AT/MEL Tests carried out in the tunnel Pressure test in L5 (27 march 2007)  Guarantee the inner triplet piping mechanical stability under pressure  Validate the new X line along the triplet (copper corrugated tube + interconnections)  Monitor the H pieces displacement under pressure Result: Test interrupted at 20 bars when the support system broke and M1 bellows ruptured Cause of rupture: axial movement of Q1 cold mass towards the IP  The heat exchanger circuit remained leak tight even after the cold masses displacement  X line replacement on the other triplets continue as planed  The cold mass support system of all Q1 and Q3 has to be reinforced

Inner Triplet Review 14 H. Prin AT/MEL Repairs “Spiders” replacement on the 3 assemblies that were broken during shipment to CERN Removal from the vacuum vessel MLI and thermal shield removal “Spider” exchange (3/4) or repair (1/4) Cold mass recryostating Leak test of pipes that were cut to remove the spiders

Inner Triplet Review 15 H. Prin AT/MEL Repairs X tube removal and installation of new tubes Removal of the heat exchanger tube  Removing the vacuum vessel dome in front of Q1  Cutting fix point between L and X lines on Q1 and Q3  L line extremities cutting  Extracting the copper corrugated tube Installation of the new heat exchanger tube  Replacement of L line flanges and M4 line bellow  Insertion of the new copper corrugated tube  Welding fix points at the extremities Interconnection of the X, L and M4 circuits (see C. Garion’s presentation)  Installation of the “H” pieces  Welding X line  Leak test of the exchanger circuit from the Q1 to Q3  Welding M4 and L lines  Leak test on the cold mass circuit

Inner Triplet Review 16 H. Prin AT/MEL Present Status R1L2R2L5R5L8R8 6(/8) triplets were installed in the tunnel 21(/28) cryomagnets and 6 (/8) DFBX were installed 5(/8) triplets were interconnected (at least the bus bars connections) 2(/8)triplets were pressure tested in the tunnel 15(/24) new exchanger tubes were produced 10(/24) exchanger tubes were exchanged 3 cryomagnets and one DFBX have to come out of the tunnel 1 cryomagnet have to be replaced by its spare and has to be de-cryostated to exchange the supports

Inner Triplet Review 17 H. Prin AT/MEL Standard actions summary and information

Inner Triplet Review 18 H. Prin AT/MEL Additional tests on the spiders  i max sample 1 = MPa  i max sample 2 = MPa The tests were initially intended to merely assess a possible prematurate breakdown occurring at limited flexural strain at break. For this reason and due to the limited size of the available material, two non normalised specimens have been machined radially for flexural testing. Three-point loading test, load applied at midspan, direction of force normal to the plane of the running of the fibers. Results (values are qualitative due to non-standard sample geometry and set-up): Average flexural stress at break = 316 MPa Average flexural strain at break = 3.3 % Average modulus of elasticity in flexure = 12.7 GPa

Inner Triplet Review 19 H. Prin AT/MEL Additional tests on the spiders F Q3 supporting system rigidity = 0.49mm/ton

Inner Triplet Review 20 H. Prin AT/MEL Additional tests on the spiders Q2 supporting system rigidity = 0.43mm/ton

Inner Triplet Review 21 H. Prin AT/MEL Additional tests on the spiders Q1 supporting system rigidity = 0.66mm/ton