Tracker Subsystem GLAST LAT Project 1 ANNEX 1 to NCR/FM/INFN/PI/372 STATIC TEST TORQUE LOSS OUT OF SPEC’S ON BOTTOM TRAY S/N 005 Andrea Tenze

Slides:



Advertisements
Similar presentations
PEM® Type SFN™ Spinning Flare Nut
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
optiSLang - ANSYS Workbench Interface (optiPlug)
VEX Robotics Platform and ROBOTC Software Introduction.
TKR-Grid I/F Design Options Grid TKR Flexure Shoulder Bolt (close fit) Conical Bushing Grid TKR Flexure Shoulder Bolt Collar/Pin with conical head (pressed.
Fiber Repositioning System NanoDrop December 11, 2006 Chris Czech Charles Dielmann Mark Howe Dana Kimpton Christopher Sherman.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Anders W. Borgland 1/16 What? Where How? Description of the Geometry What? Where How? Description.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
DesignXplorer Parameter Manager Workshop 9. DesignXplorer Parameter Manager Workshop Supplement August 26, 2005 Inventory # WS9-2 Workshop 9 – Goals.
Harmonic Analysis Workshop 10. Workshop Supplement Harmonic Analysis March 29, 2005 Inventory # WS10-2 Workshop 10 – Goals Goal: –In this workshop.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Carbon-Epoxy Composite Base Plates for the PHOBOS Spectrometer Arms J.Michalowski, M.Stodulski The H.Niewodniczanski Institute of Nuclear Physics, Krakow.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Introduction to the VEX ® Robotics Platform and ROBOTC Software © 2012 Project Lead The Way, Inc.Principles of Engineering.
AVC COLLEGE OF ENGINEERING Mechanical Engineering DESIGN OF DRILL PCD ADJUSTABLE MECHANISM AND RESPECT MODIFICATION OF MULTI DRILLING MACHINE. Guided By.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
University of Puerto Rico at Mayagüez Department of Mechanical Engineering Introduction to NX 6.0 Tutorial 4 Modified by (2011): Dr. Vijay K. Goyal and.
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
LAT-TD GLAST LAT Project Tracker Inner Shipping Container Analysis and Test Results Tracker Inner Shipping Container Analysis and Test Results August.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
Strategy Using Strategy1. Scan Path / Strategy It is important to visualize the scan path you want for a feature before you begin taking points on your.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.
Model: Thermally Induced Creep. Introduction This model computes the stress history over a long time for a material that exhibits creep behavior. The.
Workshop 2 Steel Bracket Modified by (2008): Dr. Vijay K. Goyal Associate Professor, Department of Mechanical Engineering University of Puerto Rico at.
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
BINP geometry (= cavity inner dimensions which define the boundary) is based on CERN geometry (as of August 4, 2008) with some adjustments made in order.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Optimizing 3-Component Force Sensor Installation for Satellite Force Limited Vibration Testing Bob Metz PCB Piezotronics, Inc. Depew, NY USA.
Metal Plasticity. Goal – Introduce a nonlinear metal plasticity material to the same large deflection model from the first workshop regarding the non-linear.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
GLAST LAT Projecttitle - MRB 21 June 2005 R. BAGAGLI 1 Threads on flexure MRB Meeting – 21 June 2005.
WS2B-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. April 30, 2009 Inventory # Workshop 2B Assembly Contact Workbench-Mechanical.
Mickaël MULLER, Evelyne TOUSSAINT and Michel GREDIAC
System Design, Implementation and Review
GLAST Large Area Telescope:
Workshop 5A Metal Plasticity
LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary
Open Issues Modification of Cactus Arm bending tool required
Clic Vertex Thermal Setup and stave studies
Informal document No. 9 (50th GRE, 7-11 April 2003, agenda item 3.2.)
Workshop 4A Contact Interface Treatment
Proposed tools and methods for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 4/29/04.
Contents Introduction Identification of the knowledge gap
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Distributed Forces: Centroids and Centers of Gravity
TKR and LAT Survey and Alignment Planning
Tracker to Tracker Clearance Reduction Contributors
Presentation transcript:

Tracker Subsystem GLAST LAT Project 1 ANNEX 1 to NCR/FM/INFN/PI/372 STATIC TEST TORQUE LOSS OUT OF SPEC’S ON BOTTOM TRAY S/N 005 Andrea Tenze MRB meeting - 17 February 2005

Tracker Subsystem GLAST LAT Project 2 Contents Introduction References Test work flow, hardware and interfaces Test results Corrective action

Tracker Subsystem GLAST LAT Project 3 Introduction Description of non conformance –Corner Flexure -X+Y nut torque loss after first direction test (X) exceeds 2.3Nm limit Input to discussion –Brief description of test performed with highlight to the interface hardware –Resume of results obtained with BT Static Tests

Tracker Subsystem GLAST LAT Project 4 Procedure: –LAT-PS –LAT-PS Test result: –LAT-TD  BT S/N 001 –LAT-TD  BT S/N 002 –LAT-TD  BT S/N 003 –LAT-TD  BT S/N 006 –LAT-TD  BT S/N 005 –LAT-TD  BT S/N 007 –LAT-TD  BT S/N 008 References

Tracker Subsystem GLAST LAT Project 5 Test work flow Bottom Tray mounting Grid installation Distance between bottom side of flexure and bottom side of grid measurement 1 st axis test Nut torque loss measurement Distance between bottom side of flexure and bottom side of grid measurement 2 nd axis test Nut torque loss measurement Distance between bottom side of flexure and bottom side of grid measurement Pre test Bottom Tray CMM measurement Post test Bottom Tray CMM measurement Note: 1)Already prescribed in procedure not prescribed in procedure 2)Torque loss measurement method (not specified in procedure): with torque meter, unscrewing Acquisition of displacement and load data Post Processing of data, obtaining Load vs Displacement curves Acquisition of displacement and load data Comparison with pre test measurement Check of curve closure

Tracker Subsystem GLAST LAT Project 6 Test hardware interfaces Steel grid simulation plate LAT-DS –No floating nut present Shoulder stud –DS but considered non flight hardware –With Dycronite patch and without locking feature on both sides threads –At their first usage (for BT005) Nut –DS –At their first usage (for BT005) Cones –DS and DS –At their fifth usage (for BT005) Hex bushings –DS –At their fifth usage (for BT005)

Tracker Subsystem GLAST LAT Project 7 Notation Test direction and notation

Tracker Subsystem GLAST LAT Project 8 Test results Torque loss (Nm) –procedure limit 2,3Nm +X side-X side+Y side-Y side BT S/N Test axis CF +X +Y CF -X -Y CF +X -Y CF -X +Y SF +X +y SF +X -y SF -X +y SF -X -y SF +Y +x SF +Y-x SF -Y +x SF -Y -x 005 X 1,861,981,962,751,161,211,091,290,941,801,051,22 Y 1,030,851,962,021,271,351,471,460,651,070,790, X 1,901,881,582,920,840,970,991,281,491,331,251,58 Y 1,091,340,921,941,021,061,010,930,750,840,721, X 1,961,911,902,821,040,981,110,832,282,051,291,91 Y 1,221,230,941,871,721,061,150,950,911,410,931,40 Note –Value of torque loss is greater than required limit only on first direction test and on the same location –Respect to all the CF, CF –X+Y is the only one which does not have aligned inner and outer cones (see LAT-PS-04245)

Tracker Subsystem GLAST LAT Project 9 Test results Displacement vs load curves –All curves obtained show closure in X direction and in Y direction X direction plots (double click in the picture to see all DZ probes plots)

Tracker Subsystem GLAST LAT Project 10 Test results Y direction plots (double click in the picture to see all DZ probes plots)

Tracker Subsystem GLAST LAT Project 11 Test results Displacement range obtained at zero load (dead band width) –Range has been obtained by means of sum of maximum and minimum displacement obtained between - 50N + 50N during the test –Data obtained for BT005, BT007 and BT008 are comparable to data obtained with previous BT tested X DIRECTION TEST – dead band widthY DIRECTION TEST – dead band width BT S/ND1ZD2ZD3ZD1LAD2LAnoteBT S/ND1ZD2ZD3ZD1LAD2LAnote [mm] 0010,1300,1330,1200,1490,1182nd axis0010,1000,0940,1200,1190,0971st axis 0020,1120,1220,1060,2150,2242nd axis0020,1300,0820,1190,1780,1541st axis 0030,1150,1050,0990,1780,1821st axis0030,1450,1190,1600,1450,1302nd axis 0060,1270,1370,1130,1640,1531st axis0060,1820,1240,1980,1680,1812nd axis 0050,1220,1050,0710,1790,1891st axis0050,0920,0870,1200,1510,1162nd axis 0070,1050,1110,0930,1350,1341st axis0070,1170,1060,1040,1500,1192nd axis 0080,0790,0770,0710,1490,1581st axis0080,1000,0690,0830,1630,1152nd axis Pre and post test measurement on BT005 –(measure pre test) - (measure post test) < 0.15 mm at all flexure hole axis

Tracker Subsystem GLAST LAT Project 12 Corrective action Proposed corrective action –Procedure variation Modification of Pass/Fail criteria for Bottom Tray –Elimination of actual torque loss limit –Introduction of: »pre and post test measurement comparison »zero load dead band width limit (for this kind of analysis a discussion has already been implemented) Introduction of measurement in step by step procedure –Nut torque loss will be an information obtained from test but no more considered as pass/fail criteria for Bottom Tray Proposal for BT005 –Use as is Comments –Any decision will have an influence on NCR filed for already tested Bottom Tray NCR FM/INFN/PI/378 - Bottom Tray S/N 007 NCR FM/INFN/PI/382 - Bottom Tray S/N 008