TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.

Slides:



Advertisements
Similar presentations
TRANS-SIBERIAN GOLD PLC 26 June 2013 Annual General Meeting TRANS-SIBERIAN GOLD.
Advertisements

1 Northern Opportunities Forum November 2013 TSX: CRJ.
Targeting First Gold Dore Q1 2014
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
TRANS-SIBERIAN GOLD PLC 30 June 2014 Annual General Meeting TRANS-SIBERIAN GOLD.
World’s largest undeveloped tin deposit in Kazakhstan.
Chapter 9: CAPITAL ASSETS Quiz for chapter 9 will be Thurs or Friday of next week. (May 22 or May 23) CHAPTER 9.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine.
Frank O. Atta-Owusu Snr. Projects Officer, KITE 1 DEVELOPMENT AND ENERGY IN AFRICA: REGIONAL WORKSHIOP 16 th -18 th October, 2007 The AREED Programme Presented.
district development Tanzania – Lake Victoria Greenstone Belt.
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
Silver Shield Resources Corp. A MEXICO PRECIOUS METALS DEVELOPER TSX Venture: SSR.
Book 2: Chapter 1 Introduction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand commodities.
Chapter 10-1 PLANT ASSETS, NATURAL RESOURCES, AND INTANGIBLE ASSETS Accounting Principles, Eighth Edition CHAPTER 10.
 El Capitan Precious Metals, Inc. Meeting of Shareholders November 20, 2012Scottsdale, AZ.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
1997 Riddarhyttan listed on the Stockholm Stock Exchange’s SBI list. Profit after financial items were MSEK 3.5 and the Group losses after tax were.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Presentation to MineAfrica’s Investing In Africa Seminar March 4, 2008 By Don Willoughby, VP Corporate Development All financial.
Fourth CTC Reset Compliance Filing Fall 2009 Customer Meetings.
1 Peru Minerals Sector Update Trade and Investment Group London 30 January
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear. Right to acquire.
Connolly - International Financial Accounting and Reporting - 2nd Edition CHAPTER 7 BORROWING COSTS.
Figure 1.1 Price of WTI at Chicago ActualForecast.
Lina Williams Budget & Financial Analyst Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, April 28 th, 2015.
© The McGraw-Hill Companies, Inc., 2002 Slide 11-1 McGraw-Hill/Irwin 11 Plant Assets, Natural Resources, and Intangibles.
1 Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs Eastern Basin 28 June 2011.
World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE Anglo Platinum 28 November 2002.
Actualforecast Hydro, wind, and other renewables NGLs Coalbed methane Conventional natural gas Mined and in situ bitumen Conventional heavy oil Conventional.
© The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Slide Reporting and Analyzing Long-Term Assets.
THE MEASUREMENT OF URBAN LAND CONSUMPTION AS A SOURCE OF INDICATORS OF ECONOMIC PERFORMANCE AND SUSTAINABILITY Rodrigo Bastías Castillo
Mineral Exploration and Development
Petroleum.  Petroleum is a naturally occurring liquid mixture that contains mainly hydrocarbons  Petroleum also contains oxygen, nitrogen and sulphur.
Stock Prep Summary Stock Prep (HD – Machines) – Phase 1: Secondary refiners to series operation and recirculation Piping, tie ins, order of preparation,
Block 30 Prospecting & Production February Block 30 Overview On April 30, 2013, the Government of the Republic of the Sudan granted an exploration.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2014 / 15 Fourth Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
LEARNING ABOUT THE NATIONAL ENVIRONMENTAL MANAGEMENT : WASTE ACT (NO. 59 OF 2008) A GUIDE TO MANAGING WASTE WITHIN THE LAW Presented by: Quinton Williams.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
1 | emwd.org Fiscal Year 2015 / 16 Fourth Quarter Enterprise Performance Measures Update John Ward September 7, 2016.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
TRANS-SIBERIAN GOLD PLC Annual General Meeting
St. Lawrence Fluorspar Project St
GREENHILLS PORTUGAL LDA
QKR Namibia Navachab Gold Mine
Fixed vs. Variable Rates
Electrical Distribution Design Services
Successful Efforts Method (SEM) and Full Cost Method (FCM) of Accounting for Oil and Gas Producing Activities.
Developing a Canadian Gold Deposit
Advanced Financial Accounting
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
10 Measures of Operating Capacity.
China Petroleum & Chemical Corporation Q Results Announcement
Principal Projects - Mexico
Saskatchewan Measurement Directive PNG017 DRAFT CHANGES
Delta Water Supply Project
Guidance for 2017* Q3 2017: Financial net: around -200 million
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Blueberry.
Bidjovagge Mine Project
2015 January February March April May June July August September
Agenda FYE June 30, 2020 Operating Budget
Agenda FYE June 30, 2020 Operating Budget
Presentation transcript:

TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD

TSG Company history Established in 2000 Listed on LSE (AIM) in November 2003 AngloGold Ashanti subscribed for 29.9% shares in 2004 and 2005, now 31.17% UFG acquired 25% in 2006, now 55.03% Veduga and Bogunay sold for $40 million in 2007 Asacha in production since September 2011 Asacha licence extended in 2013 to 1 September 2018, application for further extension in preparation

ASACHA – Underground Mine Q April 2016 May 2016 YTD 2016 Mine development (metres) 2,6723,5763,9371, ,856 Ore extracted (tonnes) 185,573198,387177,55544,06715,48315,42874,978 TRANS-SIBERIAN GOLD

ASACHA Processing plant Q April 2016 May 2016 YTD 2016 Ore processed (tonnes) 155,215156,561161,24240,30013,24013,00666,546 Gold grade (g/t) Silver grade (g/t) Gold recovery (%) Silver recovery (%) Gold in dore (oz) 29,66636,51337,7989,2023,4813,40316,086 Silver in dore (oz) 39,13645,08649,23210,8184,2245,05620,098

ASACHA Refining and sales Q April 2016 May 2016 YTD 2016 Gold refined (oz) 29,67036,08937,9849,3433,2562,83815,437 Silver refined (oz) 39,02644,61049,39811,5423,6953,20818,445 Gold sales $mill Silver sales $mill TRANS-SIBERIAN GOLD

JORC Resource Estimate 11,000 metres drilled on Asacha’s flanks in 2012 Resource estimate updated in 2016 by QG Pty Ltd shows the Asacha property contains approximately 760,000 oz. of gold and about 1.8 million oz. of silver. The estimate incorporates new data from mining development and accounts for mining depletion during 2015 TRANS-SIBERIAN GOLD

JORC Resource as at 31 December 2015 ASACHA PROPERTY MEASURED + INDICATED INFERRED MEASURED, INDICATED & INFERRED CUT-OFF g/t Tonnes (000) ,129 Gold Oz (000) GRADE g/t Silver Oz (000) 1, , GRADE g/t

Asacha mine Average monthly output of more than 14,700 tonnes of ore in 2015 ensures continuous operation of the plant Processing plant throughput averaged more than 13,400 tonnes per month in 2015 Dilution, which reduces the grade of ore delivered to the plant, reduced to 40.4% in 2015 (2014: 56.8%) and to 36.6% in first quarter 2016 Ore extraction in 2015 impacted by flooding, which also delayed mine development but mine development expected back on track by the beginning of 2017

Asacha mine in operation

Main activities at underground mine In 2014 mine development started below 200 metre level In 2015 stoping activities started below 200 metre level Stoping methods chosen thoroughly for areas of fractured rock Dilution (excluding rockfalls) in December 2015 was 22.6%, the mine’s lowest ever monthly figure Gold grades for January-May g/t (January- May g/t) Appropriate equipment purchased

Commissioning of objects at site TRANS-SIBERIAN GOLD Key facilities already commissioned: Processing plant First phase of the tailings storage facility with sludge pipeline Water supply network Fuel storage facility (including fuel tanks and pipelines, refuelling station and lubrication oils storage) Cold storage facilities Cyanide storage Explosives storage Power unit and power supply system The camp

Current exploration and construction activities at site Exploration drilling in 2016: – advanced exploration mining (underground drilling), 54 holes, about 5,000 metres -exploration of 25 vein (underground drilling) to conduct a detailed field appraisal, 16 holes, about 2,900 metres -geologic exploration drilling in the SURPRIZ ore zone (surface drilling), 10 holes, about 4,100 metres -Mine development to reach 150 and 100 metre levels, construction of the pumping station at 150 metre level is in progress Construction of the second compartment of the tailings storage facility

Loan repayments $43 million loan facilities, of which $16.5 million repaid between 2011 and 2013 Remaining $26.5 million rescheduled in 2013, to be repaid by the end of 2018 $1.3 million repaid as scheduled in 2014 $5.2 million repaid in 2015, including prepayments of $1.0 million due in 2016 and $2.2 million due in 2018